civus

Property profile

1918 RITTENHOUSE SQ

OPA 08211540020 linked records

Different people can share a name and appear on the same profile.

About these name links

Actor profiles are grouped by kind and normalized name. Two people with the same name may appear together in this first version.

Zoned RM-4Residential/Residential Mixed-Use
Owner
COHEN KATHERINE M
ZIP code
19103
Year built
1750
Market value
$1,163,800

Historic

Designation status and decisions from the historic property record.

16 decisions
Historic address
1914-16 RITTENHOUSE SQUARE STREET, 1914-1916 RITTENHOUSE SQUARE STREET; 1915-1919 MANNING STREET, 1914-16 RITTENHOUSE SQUARE STREET AKA 1915-19 MANNING STREET, 1914-1916 RITTENHOUSE SQUARE STREET, 1914-16 RITTENHOUSE SQUARE, 1918 RITTENHOUSE SQUARE, 1914 RITTENHOUSE SQUARE STREET, 1914 RITTENHOUSE SQUARE
Year built
1750
Building description
ROW 4 STY MASONRY
Owner
COHEN KATHERINE M / MCCRUDDEN RYAN P

Source links open full minutes. Exact passages have not been matched to these records.

  1. Nomination

    Committee on Historic Designation

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Prior meeting reference: April 28, 1970 Stated Meeting

    Criteria cited
    Historic certification
  2. Informational

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Main house associated with 1916 Rittenhouse Square Street proposal; McNeil wishes to purchase both properties and construct a gallery addition connecting the two.

    Vote tally
    For comment only, no formal vote taken
    Votes and testimony

    Testimony

    • Carl Zuckersupport, person
    • Henry McNeilsupport, person
  3. Informational

    Historical Commission

    Recorded outcomeNo decision

    Recorded conditions

    For comment only, not for permit. Committee discussed possibility of demolishing c. 1957 entry pavilion if replaced with sympathetic design conforming with Standards' guidelines for additions.

    Criteria cited
    Votes and testimony

    Testimony

    • Carl Zuckersupport, person
    • Dr. James Foxneutral, person
    • Henry McNeilsupport, person
  4. Alteration review

    Architectural Committee

    Recorded outcomeDenied

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Denied: canopy, steps and iron fence; rooftop addition (pending further visibility study); demolition of chimneys; demolition of rear ell (applicant to return after further study of reuse; garage could be replaced and expanded with further study); demolition of entrance pavilion (applicant to return with more convincing reason). Approved: replacing six-over-six windows on historic facade with two-over-two windows.

    Prior meeting reference: Architectural Committee 31 March 1998 Report; Minutes of 8 April 1998 Commission Meeting

    Vote tally
    unanimous denial of most elements; one approval
    Criteria cited
    Votes and testimony

    Testimony

    • Patricia Adenoppose, person
    • Patricia Roystonoppose, person
    • Preservation Allianceoppose, organization
    • Walter Chathamsupport, person
  5. Alteration review

    Architectural Committee

    Recorded outcomeDeferred

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Matter deferred to a special meeting of the Architectural Committee with a quorum; Commission staff to notify applicant and interested parties of date and time

    Votes and testimony

    Testimony

    • Henry McNeilsupport, person
    • Walter Chathamsupport, person
    • William Schwartzoppose, person
  6. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Staff to review and approve details for: front steps using real brownstone, removal and replacement of shutters with style-appropriate alternatives, new four-story gallery addition details, and sunken roof deck details. Committee and Commission to review materials and details for new two-story garage and wider rear ell.

    Prior meeting reference: Reviewed one year prior at owner's request regarding demolition possibility; reviewed at previous meeting with recommendations to lower first floor windows and mock-up review of rooftop addition

    Vote tally
    unanimous
    Criteria cited
    Historical significance and appropriateness of pavilionFenestration correlation with historic structureScale and design of proposed additionsVisibility from adjacent propertiesEffect on views of Rittenhouse Square from neighboring structuresHistorical Commission's obligation to consider effect on neighboring structures
    Votes and testimony

    Votes

    • Daniel McCoubreyyes
    • Herbert Levyyes
    • Robert Thomasyes
    • Suzanne Pentzyes

    Testimony

    • Alan Gilbertoppose, person
    • Aliki Strakesoppose, organization
    • George Thomasoppose, person
    • Marc Brookmansupport, person
    • Myles Kellyoppose, person
    • Walter Chathamsupport, person
    • William Schwartzoppose, person
  7. Alteration review

    Architectural Committee

    Recorded outcomeDenied

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Applicant recommended to relocate rooftop addition over rear ell and lower pitch of proposed skylight to mitigate visibility.

    Prior meeting reference: Mock-up with poles and flanges viewed from multiple locations; revised proposal shown with planting screen

    Vote tally
    unanimous
    Criteria cited
    Visibility of rooftop addition from multiple locationsEffect on historic character of mansard roof
    Votes and testimony

    Votes

    • Daniel McCoubreyno
    • Herbert Levyno
    • Robert Thomasno
    • Suzanne Pentzno

    Testimony

    • George Thomasoppose, person
    • Walter Chathamsupport, person
  8. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Simplified cornice; staff and Committee chair to review and approve details and material samples

    Prior meeting reference: Committee at last meeting recommended approval of demolition of entry pavilion at 1916, rear el and garage, construction of rear addition, new windows; denial of rooftop living room; Commission to hear proposal 11 August

    Criteria cited
    Rooftop addition sits on new construction not historic buildingAddition minimized to acceptable degreeAddition will not be mistaken as part of historic building
    Votes and testimony

    Testimony

    • Aliki Strakesoppose, person
    • Barbara Gilbertoppose, person
    • Fred Mannoppose, person
    • George Thomasoppose, person
    • Mark Brookmansupport, person
    • Myles Kellyoppose, person
    • Suzanne Pentzsupport, person
    • Walter Chathamsupport, person
    • William Schwartzoppose, person
  9. Nomination

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

  10. Other

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

  11. Alteration review

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Proposed removals constitute a demolition, not an alteration; garages on Manning Street should be redesigned; tripartite division of new Rittenhouse Square facade not appropriately scaled; material choices to be developed further

    Prior meeting reference: Commission approval 27 September 1999; revised approval 14 June 2002; prior Architectural Committee reviews 25 May 1999, 8 July 1999, 27 July 1999; prior in-concept reviews 31 March 1998 and 8 April 1998

    Vote tally
    Demolition finding: majority (Pentz dissented); new construction comments: unanimous
    Criteria cited
    Standards 2Section 14-1000 of the Philadelphia Code
    Votes and testimony

    Votes

    • Amy Steinyes
    • Dominique Hawkinsyes
    • Nan Guttermanyes
    • Rudy D'Alessandroyes
    • Suzanne Pentzno

    Testimony

    • Bart Blatsteinsupport, person
    • Ben Leechoppose, person
    • Carl Primaverasupport, person
    • Jonathan Doransupport, person
    • Nurit Nachimsupport, person
    • Preservation Alliance for Greater Philadelphianeutral, organization
    • Sean Whalensupport, person
    • Shimi Zakinsupport, person
    • Stephen Miletoneutral, person
  12. Alteration review

    Historical Commission

    Recorded outcomeNo decision

    Prior meeting reference: Historical Commission 27 September 1999 approval; Architectural Committee 25 May, 8 July, 27 July 1999; Historical Commission 9 June, 14 July, 11 August 1999; Historical Commission 14 June 2002; Architectural Committee 31 March and 8 April 1998

    Criteria cited
    Votes and testimony

    Testimony

    • Bart Blatsteinsupport, person
    • Carl Primaverasupport, person
    • Jonathan Doransupport, person
    • Robert Powerssupport, person
    • Sean Whalensupport, person
    • Shimi Zakinsupport, person
  13. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Staff to review details

    Prior meeting reference: Architectural Committee recommended denial and additional materials; in-concept approval November 2013; Commission approval 27 September 1999

    Vote tally
    passed unanimously; Hawkins abstained
    Criteria cited
    Section 14-203(15)Section 14-203(88)Section 14-1000Standards 2
    Votes and testimony

    Votes

    • Anuj Guptayes
    • Betty Turneryes
    • Dominique Hawkinsabstain
    • John Mattioniyes
    • Joseph Palantinoyes
    • Michael Maenneryes
    • R. David Schaafyes
    • Rosalie Leonardyes
    • Sara Merrimanyes

    Testimony

    • Barton Blatsteinsupport, person
    • Carl Primaverasupport, person
    • Jonathan Doransupport, person
    • Shimi Zakinsupport, person

Linked public records

Records are sorted by date and cite the basis for each property link.

  1. L&I permits on hearing parcelsCompleted
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  2. L&I permits on hearing parcelsCompleted
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  3. L&I permits on hearing parcelsCompleted
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  4. L&I permits on hearing parcelsCompleted
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  5. L&I permits on hearing parcelsCompleted
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  6. L&I permits on hearing parcelsCompleted
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  7. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  8. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  9. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  10. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  11. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  12. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  13. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  14. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  15. HearingLinked by parcel number
    Philadelphia Historical Commissiondeferred
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  16. HearingLinked by parcel number
    Philadelphia Historical Commissiondeferred
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  17. HearingLinked by parcel number
    Philadelphia Historical Commissiondenied
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  18. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  19. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  20. Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence