  1. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Heating plant installation to be carefully planned and supervised by architect Brumbaugh

    Criteria cited
    ArchitecturalHistorical
  2. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Roof insulation method as described in letter of 14 December 1981 accepted; insulation to be blown in from above where possible; shingle lath to be lifted slightly and bats slipped in under it where danger of damage to original plaster exists; extreme care required to prevent damage to original fabric during insulation process

    Prior meeting reference: 14 December 1981

    Criteria cited
    Roof insulationPreservation of original fabric
  3. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Replacement of porch roof; replacement of paving and curbs removed for archaeological investigation approximately three years prior.

    Vote tally
    Approved; Dickey abstained
    Votes and testimony

    Votes

    • John Dickeyabstain

    Testimony

    • John Dickeysupport, person