civus
Search historic records

INDEPENDENCE HALL

2 decisions
Source address
Independence Hall

Decision timeline

Decisions, votes, testimony, and links back to source minutes.

Source links open full minutes. Exact passages have not been matched to these records.

  1. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Applicant to present alternatives for mechanical system based on higher summer temperature and RH boundaries and winter RH boundaries for minimizing condensation; options include state-of-the-art air handling using existing duct chases, new controls with existing and new chases where non-consequential to historic fabric, or develop proposed system with new boundaries; detail of design for proposed air intake louvers required; sufficient technical evidence required that ground-level louvers are necessary with detail of louvers if approved; Applicant to provide technical rationale for replacing basement windows with intake/exhaust louvers

    Prior meeting reference: Architectural Committee Special Meeting, 10 April 1994

    Vote tally
    unanimous
    Criteria cited
    Electrical system compatibilityFire protection system compatibilitySecurity system compatibilityHistoric fabric preservation
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • David Brownleeyes
    • Scott Wildsyes
    • Stephanie Wolfyes