Demolition review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
Demolition of rear el (visible from Front Street); re-roofing and restoration of front portion cornice; large new rear addition; single roofing material/system for entire roof (shingles, standing seam metal, Galvalum, or batten-and-rubber system considered); front facade permastone to eventually be removed; dormer siding to be removed during roof replacement to reveal original treatment clues; staff (Baron) to be on site during investigation; final reroofing and cornice/dormer restoration details handled at staff level
- Vote tally
- Committee recommended approval of the project; final issues to be handled at staff level
- Criteria cited
- Poor structural condition of rear el (flooding, structural problems, no foundation)Visibility of el from Front StreetHistoric precedent for reroofing materialSingle material/system to cover entire roofIn-situ research during roof replacement to guide dormer restoration
Votes and testimony
Testimony
- Sabrina Soongsupport, person