Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
replacement of original window and door frames maintaining heavy blank construction, verification of frame dimensions and profiles, installation of three-light transom, installation of four-panel door, installation of skylight on roof, restoration of original brick cornice at roofline, examination of existing cornice fabric to determine gutter treatment, examination of stucco watertable for original appearance, installation of new marble steps, preparation of test panel for repointing and cleaning, revision of elevation drawing and preparation of required details for final review
Votes and testimony
Testimony
- George Claffienneutral, person