civus

Property profile

410 S FRONT ST

OPA 88850086411 linked recordsCouncil district 1

Different people can share a name and appear on the same profile.

About these name links

Actor profiles are grouped by kind and normalized name. Two people with the same name may appear together in this first version.

Zoned CMX-2Commercial/Commercial Mixed-Use
Owner
BARTO DANIEL W JR
ZIP code
19147
Year built
2015
Market value
$747,500

Historic

Designation status and decisions from the historic property record.

9 decisions
Historic address
410 SOUTH. FRONT STREET, 410 SOUTH FRONT STREET
Year built
2015
Building description
RES CONDO 4 STY MAS+OTH
Owner
BARTO DANIEL W JR / BARTO DONNA

Source links open full minutes. Exact passages have not been matched to these records.

  1. Nomination

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

  2. Alteration review

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Committee asserted plenary jurisdiction over site; design split with Pentz and Evans recommending approval in concept subject to design refinement before final review

    Prior meeting reference: December 2000: Commission approved demolition of New Market building and construction of 10-story hotel; designation amended from contributing to non-contributing 10/13/99; originally designated contributing to Society Hill Historic District 3/10/99

    Vote tally
    2-2 split: Pentz and Evans recommended approval in concept; Hawkins and Cluver recommended denial
    Criteria cited
    §14-2007(7)(k)(.4)§14-2007(2)(d)§14-2007(7)(d)Section 6.5.aSection 6.5.h
    Votes and testimony

    Votes

    • Dominique Hawkinsno
    • John Cluverno
    • Sean Evansyes
    • Suzanne Pentzyes

    Testimony

    • Barry Eiswerthsupport, person
    • Bernice Hameloppose, person
    • Harry Schwartzoppose, person
    • James Templetonsupport, person
    • John Galleryoppose, person
    • Marc Steinsupport, person
    • Paul Bonioppose, person
    • Preservation Allianceoppose, organization
    • Richard Lushoppose, person
    • Society Hill Civic Associationoppose, organization
    • William Martinsupport, person
  3. Alteration review

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Deed restriction requiring walkway to be open to the public at all times; staff to verify adjacent buildings are protected during construction

    Prior meeting reference: Spring 2008 application withdrawn after Architectural Committee meeting; original designation 3/10/99 amended to non-contributing 10/13/99; demolition approved December 2000

    Vote tally
    3 to 1 to forward to Commission with recommendation of approval
    Criteria cited
    §14-2007(7)(k)(.4) - compatibility with character of historic districtSecretary of the Interior's Standard 9 - new work differentiated from old and compatible with historic materials, features, size, scale, proportion, and massing§6.5.h Rules & Regulations - scale, rhythm, and materials of new construction
    Votes and testimony

    Votes

    • David Amburnyes
    • John Cluverno
    • Shawn Evansyes
    • Suzanne Pentzyes

    Testimony

    • Barry Eiswerthsupport, person
    • Carl Engelkesupport, person
    • David Hammondsupport, person
    • George Thomassupport, person
    • James Templetonsupport, person
    • John Galleryoppose, person
    • Marc Steinsupport, person
    • Norma Van Dykeoppose, person
    • Paul Bonioppose, person
    • Preservation Allianceoppose, organization
    • Society Hill Civic Associationneutral, organization
    • Steven Weixlerneutral, person
    • Terry Championoppose, person
    • William Martinsupport, person
  4. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Staff to review details

    Prior meeting reference: Spring 2008 Architectural Committee review; December 2000 Commission approval of demolition and 10-story hotel

    Vote tally
    Architectural Committee 3-1; full Commission unanimous on jurisdiction; Dilworth motion approved
    Criteria cited
    §14-2007(7)(k)(.4)Secretary of the Interior's Standard 9
    Votes and testimony

    Votes

    • Daniel Quinnyes
    • David Amburnyes
    • David Schaafyes
    • Joan Schlotterbeckyes
    • John Mattioniyes
    • Leslie Benolielyes
    • Richardson Dilworthyes
    • Robert Thomasyes
    • Rosalie Leonardyes
    • Sam Shermanyes
    • Sara Merrimanyes
    • Scott Wildsyes

    Testimony

    • Barry Eiswerthsupport, person
    • Carl Engelkesupport, person
    • Carl Mansfieldoppose, person
    • David Hammondsupport, person
    • George Thomassupport, person
    • Harry K. Schwartzoppose, person
    • Howard Kaufmansupport, person
    • James Templetonsupport, person
    • John Galleryoppose, person
    • Marc Steinsupport, person
    • Paul Bonioppose, person
    • Preservation Allianceoppose, organization
    • Richard DeWyngaertsupport, person
    • Richard Lushoppose, person
    • Robert Burnbergsupport, person
    • Sally Smithoppose, person
    • Society Hill Civic Associationsupport, organization
    • Terry Championoppose, person
    • William Ewingoppose, person
    • William Martinsupport, person
  5. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Cladding materials to be natural stone and brick as much as possible; plaza along S. 2nd Street design to be reconsidered; Phase 1 archaeological study to be conducted; staff to review details

    Prior meeting reference: Commission approved demolition of New Market and ten-story hotel, December 2000; 15-story mixed-use building approved November 2008

    Vote tally
    Voted to recommend approval
    Criteria cited
    Votes and testimony

    Votes

    • Dan McCoubreyyes
    • Dominique Hawkinsyes
    • Nan Guttermanyes
    • Suzanne Pentzyes

    Testimony

    • Archeological Forumneutral, organization
    • Bernice T. Hamelsupport, person
    • Brian Emmonssupport, person
    • John Gallerysupport, person
    • Lorna Katz-Lawsonneutral, person
    • Preservation Alliancesupport, organization
    • Shawn Frawleysupport, person
    • Society Hill Civic Associationneutral, organization
  6. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Brick lintel above garage opening to be adjusted as noted; exterior cladding and detailing on Front Street facade should be natural brick and limestone; plaza along S. 2nd Street granted in-concept approval only, to be redesigned and reviewed by full Commission; staff to review details

    Prior meeting reference: December 2000 Commission approval of demolition of New Market and ten-story hotel; November 2008 Commission approval of 15-story mixed-use building

    Vote tally
    unanimous
    Criteria cited
    Votes and testimony

    Votes

    • Anuj Guptayes
    • Betty Turneryes
    • Dan Quinnyes
    • David Schaafyes
    • Dominique Hawkinsyes
    • John Mattioniyes
    • Richardson Dilworth IIIyes
    • Rosalie Leonardyes
    • Sam Shermanyes
    • Sara Merrimanyes

    Testimony

    • Bernice T. Hamelsupport, person
    • Brian Emmonssupport, person
    • Head House Conservancysupport, organization
    • John Gallerysupport, person
    • Michael Wasssupport, person
    • Preservation Alliance for Greater Philadelphiasupport, organization
    • Shawn Frawleysupport, person
    • Society Hill Civic Associationsupport, organization
  7. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Natural stone paving and capping to extend the entire depth of the plaza in a regular pattern; staff to review details including lighting

    Prior meeting reference: July 2012 Commission approval of residential building; plaza design deferred for refinement at that time

    Vote tally
    unanimous (exact count not recorded)
    Criteria cited
    Votes and testimony

    Testimony

    • Brian Emmonssupport, person
  8. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Natural stone paving and capping to extend the entire depth of the plaza in a regular pattern; staff to review details

    Prior meeting reference: July 2012 Commission approval for residential building at the site; plaza design required additional refinement at that time

    Vote tally
    Unanimous
    Criteria cited
    Votes and testimony

    Votes

    • Anuj Guptayes
    • Betty Turneryes
    • Dan Quinnyes
    • David Schaafyes
    • Dominique Hawkinsyes
    • John Mattioniyes
    • Richardson Dilworth IIIyes
    • Robert Thomasyes
    • Rosalie Leonardyes
    • Sam Shermanyes

    Testimony

    • Shawn Frawleysupport, person
    • Toll Brothers Inc.support, organization

Linked public records

Records are sorted by date and cite the basis for each property link.

  1. Philadelphia L&I Business Licenses
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  2. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  3. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  4. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  5. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  6. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  7. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  8. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  9. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  10. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  11. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence