Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
1. Vote on lighting system deferred pending presentation by Applicant of a sample installation to be reviewed by INDE and then the Architectural Committee at another site visit. 2. Applicant required to investigate further mechanical system options based on higher summer temperature and RH boundaries and winter RH boundaries based on minimizing condensation on original sash: (a) Install state-of-the-art air handling and controls using solely existing duct chases; (b) Install a system with new controls and air handlers utilizing existing chases and new ones only where intervention is of no consequence to historic fabric; (c) Develop currently proposed system with new boundaries described above. 3. Applicant required to present a detail of design for proposed air intake louvers. 4. Applicant to investigate eliminating mechanical system in the tower; if found necessary, changing ductwork placement to the Tower floor. 5. Alternatives to be presented at another special Committee meeting in approximately ten days.
Prior meeting reference: 29 March 1994 Architectural Committee meeting, at which the 10 April special meeting and site tour were decided
- Vote tally
- Committee voted to recommend approval of electrical, fire, and security systems; vote on lighting system deferred; vote to require further investigation of mechanical system alternatives
- Criteria cited
- Minimization of intervention into historic fabricPreservation of original structural fabricRetention of original wall and ceiling materialsAvoidance of new penetrations into historic masonry and joists where possibleTemperature and relative humidity conditions appropriate for preservation of historic materialsCompatibility of new systems with 18th-century character of buildings
Votes and testimony
Votes
- Arlene Matzkinyes
- David Hollenbergyes
- Don Stevensonyes
- Herbert Levyyes
- J. William Cornellyes
- Penelope H. Batcheleryes
Testimony
- Arlene Matzkinneutral, person
- Hyman Myerssupport, person
- Independence Hall National Historic Park (INDE)neutral, organization
- Martha B. Aikensneutral, person
- Mr. Orteganeutral, person
- Nick Gianopulossupport, person
- Penelope H. Batchelerneutral, person
- Suzanne Pentzsupport, person
- Vitetta Group, Inc.support, organization