Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
Revise entrance to show six panel door with transom light, Revise first floor window sash to show six-over-six lights, All window sash to be wood, single-glazed, true muntin with interior storms or energy panel, Shutters to be paneled on first floor, louvered on upper floors, Cleaning and repointing specification required, Information on new roofing material required, Detailed drawing of rebuilt dormer if applicable required, Wood vertical gate to be installed instead of wrought iron, Revised drawings to be submitted for staff review and final approval