Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
Brick veneer proposal rejected; structural engineer must examine side wall. Marble stoop to be retained. Windows approved for replacement with one-over-one or six-over-six sash within original masonry openings; shop drawings required before final window approval. Door and shopfront replacement approved to match existing. Drawings must be corrected to show external stairwell to basement and large basement window opening.
Votes and testimony
Testimony
- Gregory Kontassupport, person
- Mr. Manossupport, person
- Peter Gianopulossupport, person