Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
Staff to review and approve details
- Vote tally
- Not recorded
Votes and testimony
Testimony
- Thomas J. O'Connorsupport, person
Property profile
Different people can share a name and appear on the same profile.
Actor profiles are grouped by kind and normalized name. Two people with the same name may appear together in this first version.
Designation status and decisions from the historic property record.
Source links open full minutes. Exact passages have not been matched to these records.
Architectural Committee
Committee recommendations are not final Commission decisions.
Staff to review and approve details
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Denied: northernmost stairtower window openings at 5th and 6th floors on 16th Street facade; enlargement of southernmost window opening on east and west facades at 16th floor. Approved: new entrance doors and canopy in concept; enlargement of existing window openings and new windows on 5th and 6th floors except stairtower; restoration of windows on 15th floor; enlargement of existing window openings on 16th floor except southernmost on east and west; re-opening of one window on north facade
Prior meeting reference: Prior approval by Committee and Commission for hotel development proposal
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Simulated divided-light wood windows approved for upper floors (3rd floor and above) provided profiles/details/dimensions match originals, staff to review details; true divided-light wood windows required for lower floors (below 3rd floor); 16th Street glass entrance split 2-2 (no resolution); north and east door modifications approved; new louvers on north facade approved; conceptual approval for partial removal of stone parapet at 18th floor to 30 inches above floor with simple railing, details to be resubmitted; penthouse addition approved in concept with more vertical fenestration on east and west elevations, staff to review details; exterior fireplaces denied; horizontal wooden pergola split 2-2 (no resolution)
Prior meeting reference: Prior Committee and Commission meetings where window openings, 16th Street entrance concept, and one-story penthouse for former developer were previously approved
Historical Commission
True-divided-light wood windows on first two floors; wood simulated-divided-light windows on third and fourth floors; aluminum-clad windows with simulated-divided-light on fifth floor and above, all to match existing wood profile; new 16th Street door with small panes and framing; new service door on 16th Street; new entrance on north facade; vents on north facade; staff to review details; conceptual approval of removal of portions of parapet to 30 inches keeping stone caps with installation of simple railing; denial of fireplaces and pergola
Prior meeting reference: Committee and Commission previously approved changing several window openings and creating new windows; previously approved one-story penthouse for a previous developer; previously approved new entrance on 16th Street in concept
Architectural Committee
Committee recommendations are not final Commission decisions.
Approval of proposal as submitted or alternate design with continuous glass; staff noted recommendation against removal of any fabric at parapet; coping to be reinstalled
Prior meeting reference: Returns to Committee and Commission as requested
Architectural Committee
Committee recommendations are not final Commission decisions.
20th-story window alterations approved as proposed; 21st-story south facade door opening approved; 21st-story window enlargement and modillion removal on east, west, and north facades denied; 19th-story west facade vent denied; vent to be re-studied for invisible alternative
Prior meeting reference: Multiple prior Commission reviews for conversion from offices to residences
Historical Commission
Historical Commission
Prior meeting reference: Architectural Committee, 22 January 2013
Records are sorted by date and cite the basis for each property link.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.
This is the stored score for the link between this record and the property.