Other
Historical Commission
Recorded conditions
Plaque No. 75 authorized
Decisions, votes, testimony, and links back to source minutes.
Source links open full minutes. Exact passages have not been matched to these records.
Historical Commission
Plaque No. 75 authorized
Architectural Committee
Committee recommendations are not final Commission decisions.
need to submit drawings for the Commission's approval on proposals to alter any part of City Hall
Historical Commission
All plans submitted to the Art Commission be submitted to the Historical Commission also.
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Architects should attempt to get a variance to install doors that reach the spring point of the arches on each floor, If variance not obtainable, transom panels of varying sizes would be required, Curvilinear molding approved for door surround, Decision on lettering postponed pending overall graphics package formulation
Historical Commission
Installing taller doors contingent on obtaining variance from Board of Building Standards and Fire Department; use curvilinear molding on door surrounds; defer graphics decision until overall scheme for City Hall is developed; doors to reach spring point of arches on each floor if variance obtained; if variance not obtainable, transom panels of varying sizes to fill spaces between tops of doors and spring point of arches
Prior meeting reference: Restudy of earlier proposal
Architectural Committee
Committee recommendations are not final Commission decisions.
Historical Commission
Design must also receive approval by Board of Building Standards of Department of Licenses and Inspections; clear identification of fire stairs versus non-fire stairs required
Prior meeting reference: Architectural Committee Meeting, 29 March 1994
Historical Commission
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Architectural Committee
Committee recommendations are not final Commission decisions.
Staff to review and approve details
Prior meeting reference: East Center Pavilion restoration approved approximately three years prior
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Antennas must be painted to match the metal background; staff to review details for approval
Prior meeting reference: Previously reviewed application for antennas on the tower and requested a redesign
Architectural Committee
Committee recommendations are not final Commission decisions.
Architectural Committee
Committee recommendations are not final Commission decisions.