Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
Documentation required on three different types of rails on the house, Working drawings required for final review
Decisions, votes, testimony, and links back to source minutes.
Source links open full minutes. Exact passages have not been matched to these records.
Architectural Committee
Committee recommendations are not final Commission decisions.
Documentation required on three different types of rails on the house, Working drawings required for final review
Architectural Committee
Committee recommendations are not final Commission decisions.
Relocation of fan coil unit on second floor away from Palladian window and away from existing dormer to attic; unit and grills to be placed in less noticeable position on opposite end within presently unused space; access via hinged stair or removable tread and riser; new shelves in bathroom to be shimmed not nailed; second defense system or electric eye system for security; Commission to direct letter to Fairmount Park Commission regarding maintenance needs including deteriorated garage door and damaged downspouts. Architect to submit addendum and sketch of required changes.