school which will have a maximum of 180 students it won't happen right away you know each class

Similar wording

will follow. It may take 10 years to get to that full capacity. So without further ado, I'd like

Similar wording

Stuart Rosenberg and his assistant Hannah Rosenberg to take over the slides and briefly go through

Similar wording

the design. Good afternoon, sir. Could you please state your name and spell for the stenographer?

Similar wording

My name is Stuart Rosenberg, and it's spelled S-T-U-A-R-T-R-O-S-E-N-B-E-R-G.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, and nothing but the truth?

Similar wording

I do.

Similar wording

Counsel, please proceed.

Similar wording

Thank you.

Similar wording

So, Stuart, you're the architect for the project for both the owner and the rabbi?

Similar wording

Yes.

Similar wording

And obviously, you've testified many times.

Similar wording

You've been practicing as an architect in Philadelphia for how many years?

Similar wording

Over 40 years.

Similar wording

All right.

Similar wording

So can you tell us, as we go through the slide, generally, what was the original application and talk about the amendment that gave rise to what I'll call the revised refusal, and then what I'll call the settlement agreement, which will be submitted after the hearing, which has, again, revised zoning plan.

Similar wording

as you can imagine over a period of almost a year and a half the building design evolved

Similar wording

initially when we we established a program with the school and basically a wish list we presented

Similar wording

that to the community and got immediate feedback regarding scale height and use and during as

Similar wording

As Carl mentioned, during a series of many meetings, we began to redesign the building

Similar wording

and went through a series of multiple building design revisions that ultimately appeared

Similar wording

a pair down the program to what was essential to run the school. And to sort of summarize it,

Similar wording

down the program to what was essential to run the school.

Similar wording

the project that we are now proposing has been reduced by almost 20 feet, which is almost

Similar wording

two stories in height. The square footage of the original design has been reduced by almost 27%.

Similar wording

went from 42,000 to 43,000 feet to 32,000 feet in area. And the building height has now been

Similar wording

reduced to approximately 45 feet to the roof. And our adjoining neighbors are approximately 38 feet.

Similar wording

That's the zoning limit for this district. Now, this property is across the street from

Similar wording

an apartment building? That is correct. And that previously was the Society Hill Playhouse?

Similar wording

That's right. The Society of Old Playhouse was over 50 feet in height and from what I understand had over 220 seat capacity. So buildings of this nature in this neighborhood are very common. They're in addition to single family residential, the garage uses, theater uses, and countless other uses that our plan planner will describe later in this presentation.

Similar wording

Now, in the course of your work, did you commission or did the client commission a transportation study, an impact study?

Similar wording

Yes, we have a traffic study from Traffic Planning Design, which is a well-known regional and national traffic engineering firm.

Similar wording

And that's in the record.

Similar wording

And can you just generally tell us what the conclusion was for their conclusion on their executive summary?

Similar wording

In general, to summarize, their conclusion was it would have no significant impact on the traffic in the immediate vicinity.

Similar wording

There was no reason to change or upgrade the signalization at 8th and South, which is the closest light.

Similar wording

And that's due to the fact that a maximum capacity of 180 children, at least half of which are going to be walking by foot to the school.

Similar wording

In addition to that, the traffic will be limited to morning drop-offs and mid-afternoon pickups.

Similar wording

And I'm going to refer the board for a later date to Paragraph 7 and 8 and 9 of TPD's report, February 18, 2026, which goes through the analysis.

Similar wording

And am I right in saying that the level of service, which is already a B, will not be impaired by the proposed school?

Similar wording

All right. And did you also have the opportunity to look at a land study, which is in the record, from Janice Woodcock, who was previously the Executive Director of the Planning Commission,

Similar wording

Chair of the Zoning Committee of Center City Residents Association, and a practicing architect and land planner for many years in the city?

Similar wording

Yes.

Similar wording

And what was the purpose of that report, and what impact did that information have on you?

Similar wording

Well, the purpose of that report was to establish, first of all, the history of Washington Square West.

Similar wording

What are its origins, both culturally and architecturally?

Similar wording

And the report basically summarized that over the last 250 years or more, this neighborhood

Similar wording

has been made up of every conceivable use that you can imagine.

Similar wording

Hospitals, schools, warehouses, factories, residential uses, barns, stables, you name

Similar wording

it over the centuries. And we have an example here where, you know, we have a building that's

Similar wording

probably 80 years old that predates most of the homes in our immediate district. Now, did you see

Similar wording

her conclusions in the report, which is in the record, where she went through the criteria of

Similar wording

both use variances and dimensional variances and said that we satisfied each and every requirement?

Similar wording

That is correct. Is that consistent with your understanding as the project architect?

Similar wording

Yes. She basically demonstrated that the impact of this from a physical perspective and its contextual similarity to the adjacent neighborhood and the structures arrived at that conclusion.

Similar wording

All right. And we're going to go to the refusals and then we'll conclude with you. First of all, you heard my testimony and do you adopt it as your own?

Similar wording

Yes.

Similar wording

Second of all, let's go through the refusals. You mentioned height. All right. So how much are we over the allowed height?

Similar wording

We're proposing a roof height of 45 feet to the roof deck itself, plus another 14 feet for elevator and stair roof access that would occur in two pilot houses located on the roof structure.

Similar wording

So to summarize, zoning requires 38 feet in height. We're raising it to 45. So it's approximately 7 feet of additional height, which we think is a modest change relative to the use that we're proposing.

Similar wording

which we think is a modest change relative to the use that we're proposing.

Similar wording

All right. And especially if you consider structures on the roof, whether they have penthouse or elevator overrides.

Similar wording

They're very limited in area and focused just in two locations, since two means of egress and elevator access are required by the ADA code.

Similar wording

All right. And parking. You heard that I said that we don't meet the parking requirement.

Similar wording

What type of parking do we have with this project?

Similar wording

we're proposing 12 12 parking spaces on site that will be exclusively used by our faculty

Similar wording

um and we believe that due to the fact that half the students will be coming by by foot on strollers

Similar wording

and so forth um that there is no additional necessity for on-site parking and do you believe

Similar wording

that it's uh impractical to add more parking to this project we do because um you know the

Similar wording

The footprint of the building is limited to approximately 9,300 square feet, and the garage level is already occupying close to a third to a half of that to begin with.

Similar wording

All right. And we talked about the access from the primary street, A Street. Is there any other way to access parking for this property?

Similar wording

No, there isn't because our building adjoins our neighbors to the north and south with a common party wall, so there is no access to the rear.

Similar wording

Furthermore, the rear of the existing building falls directly on the rear property line.

Similar wording

So there really is no existing rear yard.

Similar wording

So we have 100% coverage.

Similar wording

There's no rear yard setback.

Similar wording

We're nonconforming as to both use and as to both structure.

Similar wording

Correct.

Similar wording

All right.

Similar wording

Do you believe that supports the hardship that would support the variances we're requesting?

Similar wording

Fine.

Similar wording

I have nothing further of this witness.

Similar wording

Okay.

Similar wording

And then I would call Janice Woodcock.

Similar wording

Okay.

Similar wording

Hi, good afternoon. Could you please state your name and spell for the stenographer?

Similar wording

Janice Woodcock, J-A-N-I-C-E, W-O-O-D-C-O-C-K.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

Counsel?

Similar wording

Thank you. Janice, did you hear my testimony? Is it accurate so that you would adopt it as your own?

Similar wording

I would. All right. And your CV and resume is in the record. You've testified and acted as an architect and land planner before this board many, many times. I have. All right. And were you asked to prepare to investigate and prepare a report regarding the proposed uses for this property, which include the parking, the school and accessory activities and the rooftop penthouse for the

Similar wording

rabbi i was all right and what was your conclusion well uh my conclusions are that schools are a

Similar wording

customary accessory use in philadelphia's neighborhoods that the development pattern

Similar wording

that you see on this block is consistent with historic development patterns dating from the

Similar wording

mid-1800s that this block has always been a mixed-use block with churches and social

Similar wording

social-related institutions on it. And finally, this project is consistent with the city's

Similar wording

comprehensive plan because it activates a building that will, that was vacant, is vacant, I should

Similar wording

say, that will, it will be a school that contributes to the ethnic character of the

Similar wording

neighborhood, which is an objective in this district plan for the city of Philadelphia.

Similar wording

now in your report uh you go through each and every criteria of the zoning code which you're

Similar wording

familiar with yes regarding variances both use dimensional yes and what was your uh finding and

Similar wording

conclusion with regard to uh satisfying that criteria for relief well that because we are

Similar wording

dealing with a building that is non-conforming the variances are causing this so the very thing that

Similar wording

is creating the problem is what we have to deal with and by preserving this building which again

Similar wording

not all the time it's not always that your planning objectives can be consistent with

Similar wording

another and we just end up generating these variances further those variances are minimal

Similar wording

and they're the most minimal that you could possibly do and still use this building for

Similar wording

this school i want to mention one in particular which is the building height i think you saw

Similar wording

earlier how much height was reduced from the project's original design now we're only four

Similar wording

and a half feet higher than the surrounding residential development secondly the setback

Similar wording

issue the building itself is creating the zero setback at grade but the design sets back 15 feet

Similar wording

and even further than that on the upper stories to preserve light and air for the adjacent properties

Similar wording

thank you uh with regard to the orange

Similar wording

Thank you. With regard to the RM1 category, RM1 residential, but you heard what I said about the special exception, but we can't meet special exception because our nonconforming coverage and attached on the north and south make that impossible.

Similar wording

But your report confirms the compatibility of this use with the block, the zoning classification, and as a planner and former head of the planning commission, you believe that there's no adverse impact on either the district plan or the neighborhood plan or good planning in general.

Similar wording

Well, I know that this board knows it better than any anyone else that the special exception is is the purpose of it is to allow these uses to be in an area if the zoning classification supports it and were it not for the again for the existing building, we would be a special exception and not a use variance.

Similar wording

All right. And is it your expert opinion, based upon a reasonable degree of architectural and land planning certainty, that the requirements for variance relief are satisfied by this project?

Similar wording

I believe they are.

Similar wording

All right. Thank you. I have nothing further from this witness.

Similar wording

Okay.

Similar wording

And I would like to have Isaac Ohayan.

Similar wording

Oh, there you go. Am I pronouncing that right? I'm sorry. All right.

Similar wording

good afternoon sir could you please state your name as bell for the stenographer my name is isaac

Similar wording

ohayon is a a c o h a y o n right do you swear or affirm to tell the truth the whole truth nothing

Similar wording

about the truth counsel thank you uh so isaac you heard my testimony uh and you've also heard from

Similar wording

your architect steward and from the land planner janice uh do you adopt their testimony as your

Similar wording

own is it accurate yes all right and can you tell us uh a little bit about masada which is your

Similar wording

company uh you know what your connection with the property is and the project and your experience in

Similar wording

building yeah I'm I'm building in Philadelphia for 36 years I build many

Similar wording

residentials many apartment many commercials and and this property came

Similar wording

to my hand I bought it and and I I start you know to think exactly you know I'm

Similar wording

up I will not sure exactly what you know what what I really wanted to do with the

Similar wording

property until the rabbi um called me one day and he said you know i need to build a school and

Similar wording

and it really really you know i really got my my feeling to the school and and um you know we start

Similar wording

i i start talking with the rabbi and you know to get to more details and then we hired the architect

Similar wording

and we decided to build the jewish school now tell me a little bit about what i've been calling

Similar wording

the masonry garage and the attachments and i don't know if we can get a shot of the rear yard

Similar wording

with the lombard muse to the west tell us about the proximity of the existing building and the

Similar wording

relationship with attached and adjoining structures yes you know as as you see as you see in the

Similar wording

picture right now this is this is the wall of the existing existing wall this is yeah this is the

Similar wording

yes this is the existing wall right now um and this building used to be used to be a garage

Similar wording

um the the the first floor podium is a is a massive concrete building i mean i don't know

Similar wording

if we can see the the picture of the of the structure yeah we have some inside pictures yes

Similar wording

um so you know the the the the reason the reason why we live in this building because

Similar wording

let me see if there is if you go down to the first floor there you go yeah yeah yeah that's

Similar wording

one as you see the beam the concrete beam are can carry can carry a tank so really to to really to

Similar wording

to demolish this building will create a massive vibration all over the neighborhood so you told

Similar wording

me that you would probably need to do hand demolition yes and would that be uh problematic

Similar wording

expensive and how long would that take in terms of creating noise vibrations

Similar wording

dust to the neighbors yeah because you know today we cannot demolish building

Similar wording

with machines we have to demolish it by hand that will take months to demolish

Similar wording

building like that by hand especially the concrete podium so it's really this

Similar wording

is the reason why we keep in the podium and we're going towards the school and

Similar wording

school and not residential. So an adaptive reuse takes advantage of the structural integrity

Similar wording

not residential. So an adaptive reuse.

Similar wording

because it is a massive building, but it also avoids the demolition, which would be potentially

Similar wording

problematic and of concern to adjoining and attached neighbors who are cheap to jail with

Similar wording

our particular building absolutely absolutely to really to demolish this one will really can create

Similar wording

um a serious risk of the building that attached to to to my building now there were also questions

Similar wording

from the community uh this garage had actually been a garage by dr simeon who had the um i think

Similar wording

he started his collection of foreign cars or yes there but uh there were some uh

Similar wording

dep issues and uh as part of your process you resolve them with act two to avoid any uh potential

Similar wording

environmental concern yes yes we've been involved with the with the um with the environmental

Similar wording

company that you know we have we have tanks we have a monitoring wells that it's been uh

Similar wording

And there is no contamination on the water. There is no contamination on the soil. When we get to the construction, there is four tanks that we're going to remove from the site.

Similar wording

All right. So you've been meeting with neighbors on this property for over two years or so?

Similar wording

For two and a half years, yes.

Similar wording

And that included near neighbors, adjacent neighbors, community neighbors, and a variety of meetings, which are outlined in our materials, to the point where we have reached an agreement, as Mr. Bonney mentioned.

Similar wording

Does that agreement contain very specific construction logistical issues?

Similar wording

well you know i i you know i know that mr bunny you know requests uh um all can there is a ways

Similar wording

you know how to you know approach to the construction in term of like even if we're

Similar wording

going to knock partially of the buildings you know we're going to use wet materials to eliminate dust

Similar wording

So there's a lot of details about subcontractors, times of operation, materials, closing of streets or not closing of streets.

Similar wording

So insurance and the like. So that's all been negotiated.

Similar wording

Yes.

Similar wording

And how long do you think the construction will take to do the adaptive reuse?

Similar wording

I believe 18 months.

Similar wording

All right. And you've also worked out the logistical part, meaning access to properties and crane if you need it or whatever it is to be able to do it. And also, since the party wall that we showed you, both sides need to be addressed and updated, both the side that faces the Lombard Hughes as well as the side that is on the school.

Similar wording

Yeah, absolutely. Absolutely. All right. I have nothing further. Okay, this witness. Sure. All right. And then my final witness is Rabbi Goldman. Sure.

Similar wording

Rabbi, could you sit close to the mic if you would, please? Could you please state your name and spell for the stenographer?

Similar wording

My name is Yochanan Goldman, spelled Y-O-C-H-O-N-O-N, last name G-O-L-D-M-A-N.

Similar wording

Do you swear or affirm to tell the truth, the whole truth and nothing but the truth?

Similar wording

I do.

Similar wording

Counsel?

Similar wording

Thank you.

Similar wording

Rabbi, can you tell us a little bit about what you currently have been doing in this neighborhood?

Similar wording

Excuse me. I know you're the rabbi for the nearby synagogue, which will be or is affiliated with the proposed Jewish day school.

Similar wording

Thank you, and thank you, Mr. Chair, and thank you to the board for giving us this opportunity to present our case.

Similar wording

The synagogue that I lead has been in Philadelphia for 150 years in its current location since 1910.

Similar wording

And what is that location?

Similar wording

It's 527 Lombard Street.

Similar wording

And how far is that from this proposed site?

Similar wording

It's two and a half blocks away from the proposed site.

Similar wording

and my wife Leah who's here and myself have been leading this congregation for the past

Similar wording

more than 25 years and we um we have a

Similar wording

And we, um, we have a thriving early education program and for many years, for more than 10 years, we've been searching for a location in close proximity to this to our current synagogue so that the students that come to the preschool can continue their education all the way through through eighth grade.

Similar wording

and we have looked extensively at other properties and have not been able to find a suitable location

Similar wording

thanks to the developer who's who has purchased this property

Similar wording

masada they have been willing to partner with us in this development to serve the community