COUNCIL OF THE CITY OF PHILADELPHIA CONTINUED PUBLIC HEARING AND PUBLIC MEETING BEFORE COMMITTEE ON FINANCE - - - Room 696, City Hall Philadelphia, Pennsylvania Thursday, 6/6/02 9:36 a.m. - - - CONTINUED HEARINGS ON: BILL 020275 - Authorizing the Mayor, on behalf of the City, to file an application with the United States Department Housing and Urban Development (HUD) for a Community Development Block Grant (CDBG) as required by Section 104 of the Title I of the Housing and Community Development Act of 1974 (P.L. 93-383), as amended, including all understanding and assurances contained therein... RES. 020285 - Approving the annual program statement and budget for the expenditure of the NTI bond proceeds for Fiscal Year 2003. PRESENT: COUNCILWOMAN JANNIE BLACKWELL, Chair COUNCILWOMAN MARIAN B. TASCO, Vice Chair COUNCILMAN DAVID COHEN COUNCILMAN FRANK DICICCO COUNCILMAN JAMES F. KENNEY COUNCILMAN MICHAEL A. NUTTER COUNCILMAN BRIAN J. O'NEILL - - - VINCENT VARALLO ASSOCIATES, INC. Registered Professional Reporters Eleven Penn Center, Suite 600 Philadelphia, PA 19103 (215) 561-2220 6/6/02 FINANCE COMMITTEE MEETING I N D E X WITNESSES Debra McCullough, Director of Housing.......... Patricia Smith, NTI Director................... 29 Scott Wilds, Deputy Director of Housing........ 59 3 6/6/02 FINANCE - 020275, 020285

Councilwoman Blackwell

Good morning We will now resume hearings on Bills No. 020275, CDBG, and 020285, the NTI bill. This is from a recessed hearing of two days ago to iron out problems associated with both issues. We will begin the Community Development Block Grant discussion. And we received a letter from the Mayor that we will ask the clerk to read into the record, and then we will ask Pat Smith and Deb McCullough if they would further explain it to members of the committee.

The Clerk

"Dear Ms. Blackwell: I am writing in response to concerns raised regarding the proposed funding for the Housing Association of Delaware. "The Year 28 Consolidated Plan will be revised prior to submission to HUD to reflect an increase in the budget line item reflected on for neighborhood and citywide housing counseling of $135,000 to be awarded to the Housing Association of Delaware Valley and Northwest Counseling Services. With this increase, the Year 28 funding amount for both HADV and Northwest Counseling Services will be $265,000. All the 4 6/6/02 FINANCE - 020275, 020285 counseling contract awards will be added to the text on . "As you know, HADV and Northwest Counseling Services have been designated super agencies for the past several years. In Year 28, counseling services are being provided through a network of neighborhood-based housing counseling agencies, and a super agency designation will no 10 longer apply. Both the budgets and services to be provided by the former super agencies will be reduced from Year 27 level accordingly. "The $135,000 increase in housing counseling funds will be taken from the following budget line items: Settlement grants, $50,000; BSRP Tier 2, $35,000; administration, $50,000. "Thank you for your continuing support for the Community Development Block Grant Program. "Sincerely, Joyce Wilkerson."

Councilwoman Blackwell

Thank you very much. Now we will ask for a kind of layman's explanation of what this means. And would you please reflect to the cut in the whole application, which is was necessitated cuts across the board in 5 6/6/02 FINANCE - 020275, 020285 the first place because I certainly have some that I would have liked restored in my district. Thank you. MS. McCULLOUGH: Good morning. My name is Debra McCullough, and I'm the Director of Housing. As you may recall, our overall cut in CDBG resources was close to $9 million. We had a reduction in the allocation from HUD of $2.3 million and a reduction in program income of approximately $7 million, so that we had to have an overall reduction in resources. The housing counseling budget, specifically the one that -- the line item that's referenced in this letter, had been cut by $647,000. This budget revision that we're discussing now restores $135,000 to that line item, so that the line item for housing counseling will increase in the budget that's presented to HUD. The $135,000 increase that this letter proposes will increase the funding for the Housing Association of Delaware Valley and for Northwest Counseling Services, putting both of them, each of them, at $265,000 for their Year 28 contracts. 6 6/6/02 FINANCE - 020275, 020285 That is a reduction from the level of funding they received in Year 27, when they were the designated super agencies, but we're no longer using that designation, and the services that were being provided as super agencies are being spread out throughout the network of neighbor-based housing agencies. So we're confident that the services are still going to be provided, but they're going to be provided on a neighborhood basis rather than through centrally-located super agencies. So each of these agencies will be funded at $265,000.

Councilwoman Blackwell

Thank you very much. Is there any discussion or are there any questions with regard to this change? Councilman Nutter? (No questions from Councilman Nutter at this time.)

Councilwoman Blackwell

Okay, thank you very much. Therefore -- then we need to submit this as an amendment to the application, do you we? No? 7 6/6/02 FINANCE - 020275, 020285 MS. McCULLOUGH: We don't need to amend the application. The --

Councilwoman Blackwell

Because we haven't reported it out yet, right? MS. McCULLOUGH: Correct. And we will revise the budget -- this document that you're reviewing now, called "the Proposed Consolidated Plan," will be revised following this hearing, to be submitted to HUD as their funding application as the consolidated plan. The revisions that are discussed in this letter will be included in the document that gets submitted to HUD.

Councilwoman Blackwell

Thank you. And will you submit to me for the committee a letter stating that, that in the application, these changes are reflected? MS. McCULLOUGH: Yes.

Councilwoman Blackwell

Thank you very much. Councilman Kenney?

Councilman Kenney

Thank you. Is there a harm in doing an amendment? I mean, while the letter may suffice, the amendment certainly makes it much clearer. I mean, is there 8 6/6/02 FINANCE - 020275, 020285 some technical or practical problem with an amendment? MS. McCULLOUGH: No. 5

Councilman Kenney

Okay. MS. McCULLOUGH: The budget is not specified in the amendment. The amendment says that Council has reviewed and approved and formed the consolidated plan, so --

Councilman Kenney

Okay. MS. McCULLOUGH: So individual budget line items are not detailed in the ordinance. So while the ordinance could be amended to include this language, it's sort of not there now.

Councilman Kenney

Right. MS. McCULLOUGH: And historically what we've done is what I'm describing now. It's just that there's --

Councilman Kenney

But, I mean, there's no legal, technical, or practical problem with it. MS. McCULLOUGH: No. 23

Councilman Kenney

Okay, thank you. That's it.

Councilwoman Blackwell

Thank you very 9 6/6/02 FINANCE - 020275, 020285 much.

Councilman Nutter

Madam Chair?

Councilwoman Blackwell

Thank you. All right, then we are satisfied --

Councilman Nutter

Madam Chair. COUNCILWOMAN BLACKWELL -- With regard to your discussion on that issue. Councilman Nutter?

Councilman Nutter

Madam Chair, you may not know the answer to this question, and I understand. This issue, as we all know, was raised by Councilwoman Tasco the other day or, I think, on Tuesday. Do we have any idea of what the Councilwoman's position is related this whole matter?

Councilwoman Blackwell

Councilman Nutter?

Councilman Nutter

I was -- okay, I'm sorry. I was possibly asking the Chair a question that she may not have been able to totally answer. I know that you were in conversation with the Councilwoman. I just wondered what her position was on this particular issue since she had raised this issue the other day, and I didn't know 10 6/6/02 FINANCE - 020275, 020285 whether you knew what her position was 'cause she wasn't in the room.

Councilwoman Blackwell

Thank you, Councilman. Let me just say, as all of you know, that we have to submit within 60 days -- we have to submit this to HUD. Obviously, as you all of you realize, we're not the only city that applies for these funds, and we really -- I'm hopeful that we can do our jobs to report this out of this committee so that we don't lose an opportunity to secure these funds for our city. So I'm hopeful that -- that's why we have committee hearings. And, as I've said before, that is why we took three weeks to try to meet with each and every person, to try to deal with every issue of concern, so that on this day, we could have a smooth public process to certainly work out our differences and move the application forward. So I'm just hopeful that my colleagues will consider that and that we can have a fruitful discussion and certainly move forward. I understand we're having another amendment to this application, Councilman Nutter? 11 6/6/02 FINANCE - 020275, 020285 Is there any other discussion on the issue of these funds? (No response.)

Councilwoman Blackwell

As was just stated and for those who have just come into the room -- Councilman Kenney?

Councilman Kenney

I'm sorry to interrupt, but I didn't hear yet from -- since Councilmember Tasco raised the issue, I still haven't -- we haven't had a chance, 'cause I know she's working with staff back there, as to what her final opinion is on it. She's the one who raised it; I just thought maybe we could come back when she comes back in.

Councilwoman Blackwell

The Councilwoman came over to me and said that the -- in spite of the cuts that were restored to these neighborhood agencies and the discussion that housing counseling will now come out of neighborhood centers, as opposed to the way we've done it in the past, and in spite of adding the thousands of dollars more and raising them each, the Housing Association of Delaware Valley and Northwest Counseling Centers to $265,000, they were 12 6/6/02 FINANCE - 020275, 020285 350 but were substantially cut. In spite of restoring these funds, she is not satisfied.

Councilman Kenney

Okay.

Councilwoman Blackwell

And, certainly, that is her right as a councilperson and a member of this committee. So I think that it is up to the committee to decide whether or not we move on, given the fact that we have to have our application to HUD and given the fact that an effort was made to restore these funds and take from BSRP Tier 2, which is a real, real big consideration for me and for several others, and settlement grants. And the Administration found another pot of money to put here.

Councilman Kenney

Great.

Councilwoman Blackwell

So I think it's going to come to our individual decisions at this point.

Councilman Kenney

Thank you.

Councilwoman Blackwell

Thank you. Councilman Nutter, do you have an amendment?

Councilman Nutter

Yes, I do, Madam 13 6/6/02 FINANCE - 020275, 020285 Chair, but I did -- actually on this other issue, I guess I just wanted to inquire as to how the decision was made with regard to the $135,000, how the decision was made to, in essence, delete funding from at least two of the areas in order to help make up the difference. Miss McCullough, can you explain to us how you decided to take the $50,000 out of settlement grants and $35,000 out of Tier 2. Hadn't you just increased the amount for Tier 2? although we -- I think we decreased the amount that you can get -- MS. McCULLOUGH: That is correct. COUNCILMAN NUTTER -- in terms of a cap and go from 15,000 to 7500? MS. McCULLOUGH: Yes.

Councilman Nutter

But you had to increase the overall amount? I think the Tier 2 -- I mean, how did you make these decisions? MS. McCULLOUGH: The settlement grant reduction is based on a best-guess estimate, what the demand for the program will be. And you may recall that we discussed the other day that the demand for the settlement 14 6/6/02 FINANCE - 020275, 020285 grant program has been reduced, in part because of the Title lead paint treatment requirements, and 4 there hasn't been as much interest in participating 5 in that program, and so there's a guess that we'll 6 be able to meet demand with the $500,000 level that 7 remains in the budget. 8 The Tier 2 reduction was based on the 9 fact that the budget for BSRP Tier 2 is 10 $7.3 million, and this is a very small reduction in that budget. And we -- it was less of an impact on that budget, that $7.3 million budget, than it would be on some of the other programs for which funds have been committed in the development programs.

Councilman Nutter

Well, let me just ask the somewhat obvious question. MS. McCULLOUGH: Okay.

Councilman Nutter

Why would we take the $85,000 that's involved out of the two programs as opposed to just making the total $135,000 reduction out of administration? MS. McCULLOUGH: We don't know -- we don't have a place to cut it from the administration. 15 6/6/02 FINANCE - 020275, 020285

Councilman Nutter

I'm sorry, I can't hear you. MS. McCULLOUGH: We don't have any, if you will, fat within the administrative budget from which to take it.

Councilman Nutter

It must be the leanest governmental agency in the tristate area. Let me -- let me just also ask for myself: The total amount that was cut from the two agencies -- I'm sorry, I'm not remembering from the other day. Was that 360? What was that number? MS. McCULLOUGH: In the case of HADV, the funding was reduced from 350 --

Councilman Nutter

Is that 350 going to 190? I do remember that. So that's 160. MS. McCULLOUGH: In the case of HADV, it was also -- I mean -- excuse me. In the case of Northwest Counseling Services, it was reduced from 350 to 205.

Councilman Nutter

350 to 205? MS. McCULLOUGH: Yes.

Councilman Nutter

Is that 145? MS. McCULLOUGH: Yes.

Councilman Nutter

Right, okay. So 16 6/6/02 FINANCE - 020275, 020285 the real number is 305? MS. McCULLOUGH: To restore them to the level that they were at last year.

Councilman Nutter

305? MS. McCULLOUGH: Yes.

Councilman Nutter

And so let me just ask the question. I mean, I'm sure -- maybe she does, maybe she doesn't, I don't know. You've tried to make some restoration; I think that there's still some concern. I mean, the obvious question is, why didn't you just restore all of the funds? MS. McCULLOUGH: Because the service that the agency is providing being reduced. They're not being asked to serve as the super agencies, so that the range of services that the agencies will be providing is being reduced. In the past, they were asked to carry out special projects for much OHCD, they were asked to do research on particular issues. They're not going to be asked to perform at that level of service in Year 28.

Councilman Nutter

Who's going to provide those services? 17 6/6/02 FINANCE - 020275, 020285 MS. McCULLOUGH: They're being spread out amongst the other -- the network of neighbor-based housing counseling agencies.

Councilman Nutter

Okay. And why did you decide to do that? MS. McCULLOUGH: Because we felt that the neighborhood network was a more appropriate way to get -- to address the issues of the counseling, that the way you really -- the program has really been designed to be neighborhood-based rather than having two central agencies.

Councilman Nutter

Well, why did you set up the two special agencies? MS. McCULLOUGH: That was the decision of the previous administration, that that was something that he wanted to do and had the desire to be able to have two agencies you could call on for special services.

Councilman Nutter

Okay, all right. I just wanted to understand. Thank you.

Councilwoman Blackwell

Councilman, do you ever an amendment that you're going to submit?

Councilman Nutter

Yes, Madam Chair. 18 6/6/02 FINANCE - 020275, 020285

Councilwoman Blackwell

Thank you. We have an amendment to Bill 020275. This is an amendment that was submitted also last year. It's a reporting process, more technicality than in any other way a real substantive one. And, Councilman Nutter, will you read certainly how you are changing this form so that the record will indicate? Thank you.

Councilman Nutter

Sure. Thank you, Madam Chair. First, Miss McCullough, you have a copy, right? MS. McCULLOUGH: I don't have a copy of the revised one.

Councilman Nutter

Okay, here you go. Sorry. As the Chair indicated, this is a reporting requirement amendment that has been submitted and approved the last two -- in the last two bills for CDBG applications. I will work with the Chair, and maybe we'll just amend the appropriate section in the Philadelphia Code related to the CDBG application and make this a part of that section, and then the future bills 19 6/6/02 FINANCE - 020275, 020285 hopefully, would just have this particular section, and the reporting requirements automatically a part of them. Quite honestly I apologize for not getting that piece of work done, and we possibly could have avoided this. In any event, Madam Chair, rather than reading the entire amendment, which would bore everyone here to tears, there is actually one section that needs to be deleted from the proposed amendment. This is a complete replication of last year's amendment, changing from Year 27 to Year 28. The office of OHCD and the Director, Debra McCullough, anticipating this, put one of the provisions in the consolidated plan that's in front of us; and, therefore, the underlying section in the first paragraph on the first page in Section e that reads "no later than 90 days after the beginning," that sentence should be deleted from this proposed amendment. So that from "no later than 90 days" down to the end of that sentence, where it reads "Year 28 Consolidated Plan," that one sentence should be deleted from this proposed amendment. 20 6/6/02 FINANCE - 020275, 020285 And, Miss McCullough, you're in agreement with that? MS. McCULLOUGH: Yes.

Councilman Nutter

Okay. MS. McCULLOUGH: The information requested in the amendment is included in the proposed consolidated plan in the appendices beginning on of the appendices.

Councilman Nutter

Okay, thank you. You have also submitted other responsive information in relation to a discussion we had about these reporting requirements. There may have been some either misunderstandings or some clarifications; those have been made. And, again, in a going-forward basis, we will have this in the Philadelphia Code, hopefully, and you've been accommodating in terms of providing information and budgets, and I appreciate that. MS. McCULLOUGH: And the revisions that we discussed will be modified again before we submit --

Councilman Nutter

In the plan. MS. McCULLOUGH: -- the consolidated plan to HUD. 21 6/6/02 FINANCE - 020275, 020285

Councilman Nutter

Okay, very good. Thank you.

Councilwoman Blackwell

Thank you very much. Councilwoman Tasco?

Councilwoman Tasco

Miss McCullough, when did you all decide to not have super agencies? Was it this year or last year; when was it? MS. McCULLOUGH: This year -- I mean, the year going -- that we're going into, Year 28.

Councilwoman Tasco

When did you all administratively decide not to have super agencies. When was -- MS. McCULLOUGH: Last fall.

Councilwoman Tasco

Last fall. MS. McCULLOUGH: Before issuing the requests for proposals for housing counseling services.

Councilwoman Tasco

Now, when did the scoring take place? MS. McCULLOUGH: The scoring in response to the request for proposes?

Councilwoman Tasco

Right. MS. McCULLOUGH: In March, when the 22 6/6/02 FINANCE - 020275, 020285 proposals were submitted.

Councilwoman Tasco

Of this year? MS. McCULLOUGH: Of this year.

Councilwoman Tasco

So the decision to not have super agencies was decided last year. So did -- yesterday, you gave me some material on the two agencies that we are discussing, and in the material, you outlined some of the concerns raised, or their scoring. That did not have anything to do with their determination as to whether or not they were super agencies right? MS. McCULLOUGH: No. 14

Councilwoman Tasco

So why did we get that material? MS. McCULLOUGH: That was to -- that was in response to the question about how housing counseling agencies were selected. And they were selected based on responses to the requests for proposals. And so, there were -- as a part of the request-for-proposal process, everyone entered that at the same -- if you will, at a level field, because they were not going to -- we were not going to award contracts based on super agencies. 23 6/6/02 FINANCE - 020275, 020285 So everyone just started at the same point.

Councilwoman Tasco

But we didn't need to know about their scoring. If you decided that you were not going to have super agencies, that was the answer to the question, that you weren't going to have super agencies. We didn't ask you whether or not you decided to not have super agencies based on their performance. MS. McCULLOUGH: Okay.

Councilwoman Tasco

All right, so we didn't need that information, which further causes me some concern about what has been happening to these two agencies in your department. Could you answer me one question? Why wasn't the Northwest Counseling and the task force did not have funds to provide the predatory lending counseling? And why wasn't the hotline funded? since it had been in operation. MS. McCULLOUGH: The anti-predatory hotline is being funded, but it's being funded through Community Legal Services.

Councilwoman Tasco

Why did you take it away from Northwest Counseling? 24 6/6/02 FINANCE - 020275, 020285 MS. McCULLOUGH: Because there were concerns about the performance of the agency --

Councilwoman Tasco

Who had concerns about it? MS. McCULLOUGH: OHCD and -- OHCD did, we did.

Councilwoman Tasco

Based on what? MS. McCULLOUGH: Based on our response -- on the proposal that we submitted and on the review of the hotline.

Councilwoman Tasco

Okay. If these two agencies had not been super agencies from Year to now, what level of funding would they have 15 achieved? Just hypothetically, as you fund all of 16 the agencies through the years and probably have 17 given increases, what level would they be at now? 18 MS. McCULLOUGH: I can't say exactly 19 but they would be closer to what their Year 20 level was before being super agencies, and they 21 probably would have had some increases during that time. So that's why I think the level that's proposed now is an appropriate -- the revised, the amended level that's being proposed now is an 25 6/6/02 FINANCE - 020275, 020285 appropriate one because that's closer to where they would be if they had just stayed at the level they were at prior to being a super agencies but received some increases.

Councilwoman Tasco

Do you suppose that Northwest Counseling Services would have had a greater increase than 1 percent? MS. McCULLOUGH: A greater increase?

Councilwoman Tasco

From Year 20, which they got $203,000, to Year 28, which they've gotten $205,000, an increase of $2,000. MS. McCULLOUGH: Yes, they may have had a higher increase, but now they're being proposed at -- to be up to 265.

Councilwoman Tasco

Well, what was the thinking, though, initially to give them only a 1 percent increase over the Year budget as 19 opposed to the Year 28 budget? 20 MS. McCULLOUGH: It was a part of that proposal review process in which a whole range of housing counseling agencies were being funded.

Councilwoman Tasco

Well, was there any consideration given to the fact that you're taking an agency from $355,000 to $200,000, the 6/6/02 FINANCE - 020275, 020285 impact it would have on the agency to take a drastic cut like that? Was any consideration or sensitivity given to those employees who work at that agency or the survival of the agency? MS. McCULLOUGH: Well, the belief was that the agency would survive; I think there was an expectation that there may -- that they would have had to reduce staff.

Councilwoman Tasco

And was there any sensitivity on -- was there any sensitivity to try and gradually cut back their allocations as opposed to such a drastic cut? MS. McCULLOUGH: Well, no, because what was recommended was the 205 level.

Councilwoman Tasco

But it seems to me that if you were trying to take them to the level of where they would have been in Year 2000, with some increases over the seven years, it would have been greater than percent. MS. McCULLOUGH: Yes.

Councilwoman Tasco

All right. Madam Chair, I request a five-minute recess to confer with Miss McCullough in the back.

Councilwoman Tasco

Or three minutes, 27 6/6/02 FINANCE - 020275, 020285 however long it takes.

Councilwoman Blackwell

All right, we'll take a three-minute recess because we have to do City Council, a three minute recess. (Break taken.) (Proceedings resume.) - - -

Councilwoman Blackwell

The committee hearing is resumed. Is there further discussion with regard to -- we have had much discussion, Councilman Nutter introduced a resolution. We have one resolution to the CDBG application that we're happy to hear. There has been another proposed amendment submitted. Is there any other discussion with regard to the CDBG application? If not, we will move to NTI. (No response.)

Councilwoman Blackwell

Thank you very much. We will now entertain discussion with regard to Bill No. 020285. We believe that this -- everyone received -- we will pass out again a 28 6/6/02 FINANCE - 020275, 020285 proposed amendment dealing with the Targeted Basic System Repair Program, about which there has been much discussion. This amendment allocates $2 million to support the Basic Systems Repair Program, and we believe it was discussed and supported by all members of City Council. Is there any decision about the Targeted Basic Systems Repair Program proposed amendment?

Councilman Nutter

Just a quick question on this item, and then I have --

Councilwoman Blackwell

Councilman Nutter?

Councilman Nutter

Thank you, Madam Chair. Just a quick questions on this item as it's coming to us, and then I have some other questions related NTI. So this is a proposed amendment to the NTI Program statement and budget?

Councilwoman Blackwell

Yes, it is.

Councilman Nutter

Okay.

Councilwoman Blackwell

This adds $2 million because there was so -- there was a unanimity of desire to include more money in the 29 6/6/02 FINANCE - 020275, 020285 Basic Systems Repair Program.

Councilman Nutter

I'm certainly glad to hear that. Madam Chair, does that change the overall budget for Year 1 for NTI? And where actually is this amendment being made?

Councilwoman Blackwell

Miss Smith?

Ms. Smith

It would included in the program statement and budget under the housing investment and neighborhood preservation section of that. We would just add it to the back of that section. And, yes, it will increase the total amount to --

Councilman Nutter

67?

Councilman Nutter

140?

Councilman Nutter

627?

Councilman Nutter

So between the two -- I mean, I understand on BSRP and PhiLoan, and there might be a couple of others where NTI funds are being used to, in essence, supplement 30 6/6/02 FINANCE - 020275, 020285 funds that have traditionally been used from CDBG.

Councilman Nutter

What is the total amount -- you would think I would know this; we've been talking about the CDBG plan for a while. What's the total BSRP amount now, or what would it be proposed to be? And, Miss McCullough, tell me what you're on in the big book. MS. McCULLOUGH: , Section B.

Councilman Nutter

Emergency repairs preservation and weatherization. MS. McCULLOUGH: Correct.

Councilman Nutter

So presently, Tier 2 is expected to get $7.3 million? MS. McCULLOUGH: Yes. As currently envisioned, $7.3 million of CDBG, and now this amendment adds an additional 2 million of NTI bond proceeds.

Councilman Nutter

All right. And this may be the silly question for the day. This is the increase to BSRP that we have been talking about you? I mean, you had testified earlier that BSRP Tier 2 is being increased. This is the 31 6/6/02 FINANCE - 020275, 020285 increase? Or had there been an increase in CDBG funds? MS. McCULLOUGH: There was a modest increase last year --

Councilman Nutter

Okay. MS. McCULLOUGH: -- up to the 7.3 million in CDBG.

Councilman Nutter

Right. Going from 7274. MS. McCULLOUGH: Right.

Councilman Nutter

So that was the first increase. MS. McCULLOUGH: Correct.

Councilman Nutter

Okay. And now you're going $2 million. MS. McCULLOUGH: Correct.

Councilman Nutter

Okay. So, Miss Smith, you're saying that on of the Program Statement and Budget, under Housing and Neighborhood Preservation, we've got: Vacant property stabilization, 2.5 million; acquisition of stabilized properties, 2.5 million. You're saying in that line item somewhere --

Ms. Smith

We will add another 32 6/6/02 FINANCE - 020275, 020285 $2 million. I apologize.

Councilman Nutter

There are seven items here?

Ms. Smith

Yes. I apologize for not revising that page.

Councilman Nutter

Okay.

Ms. Smith

As I testified at the opening of the hearings, as a result of conversations and briefings with various members of City Council and community organizations, we thought it would be appropriate to use additional monies for the Targeted Basic System Repair Program primarily for two reasons: One, the Basic System Repair Program that's funded with Community Development Block Grant dollars is targeted based on a -- at a lower income means. There was concern that there are individuals who are in need of repair to basic systems whose incomes were over and above that very low-income limit. The intent here is to make these types of resources accessible to individuals whose incomes are up to 80 percent is still basically a grant. But we also want to craft programs and 33 6/6/02 FINANCE - 020275, 020285 make available resources that also leverage other funds, particularly loan funds. There are a number of intermediary organizations who are looking at proposals and projects that do grant and loan programs in neighborhoods to support existing owner-occupants.

Councilman Nutter

What's the impact of the -- and, again, I support the additional $2 million. But now looking at of the program statement, the Five-Year Plan, where does the $2 million come from? What year is $2 million being taken from?

Ms. Smith

Well, I would just -- in revising the projected budget -- because that -- the Five-Year Plan is a projected budget 'cause each year we approve, I would just take it out of the last year, you know, just reduce that by 2 million so that it lines up.

Councilman Nutter

I mean, I understand, and I figured that's what you probably do. But you've got basically four categories of NTI activity. Which one do you take it --

Ms. Smith

It would still be a part of the neighborhood preservation category, the housing 34 6/6/02 FINANCE - 020275, 020285 investment in neighborhood --

Councilman Nutter

Okay, but just from one of the back years.

Councilman Nutter

Okay, all righty. Can you give me an update? You and I had made arrangements to get together yesterday morning to talk about retaining walls and a program that we might try to put together. Out of Tuesday's conversation -- I think Tuesday afternoon -- we had agreed that we would get together yesterday.

Councilman Nutter

That did not happen. I did get the message in the morning, and I had called back to see if we could reschedule.

Ms. Smith

I was trying to work through -- I had to work through the Chief of Staff's Office. I think we were trying to find times. I thought that you would be available in the morning, but I was mistaken. I believe they tried to reach you to let you know. She did have -- was not able to be available for another 35 6/6/02 FINANCE - 020275, 020285 reason. What -- in talking with the Chief of Staff, we would very much like to look at the issues that have been raised around the infrastructure and how might we in the City can report resources in a way that addresses some of the concerns, including particularly the retaining wall issues that are dangerous. We just could not squeeze it in yesterday. On behalf of her office, again, I apologize that we had to cancel that meeting. We're still committed to working with your office about structuring a demonstration project to figure out what is the appropriate level of funding to fund it. We would like that demonstration project to look at issues like new technologies and other ways to reduce the costs particularly around the repair of retaining walls.

Councilman Nutter

Okay. Well, do you think you'll have some time over the course of the next week?

Ms. Smith

Yes. I'm available and I'm working with her office to get some additional time. 36 6/6/02 FINANCE - 020275, 020285

Councilman Nutter

Okay.

Ms. Smith

I also referred, Councilman, the specific issue -- I spoke with the Managing Director around one specific issue with respect to the Review Board, and she's going to have someone in her office to look into that.

Councilman Nutter

Oh, the 65th Street --

Ms. Smith

I just wanted you to know that I did refer that to the Managing Director's Office.

Councilman Nutter

Okay, I appreciate that. All right, so you're going to look to try to schedule some time for us to get together over the course of the next week.

Ms. Smith

Yes. I will work with the Chief of Staff's office to do that.

Councilman Nutter

You do understand the seriousness of this particular issue --

Ms. Smith

Yes, I do.

Councilman Nutter

-- not just for myself --

Ms. Smith

But for the City. 37 6/6/02 FINANCE - 020275, 020285

Councilman Nutter

The research indicates from the Streets Department that there are an estimated 90 walls throughout the City that have serious repair needs. Eighty percent of them, though, 72 of the 90, are situated in the 4th, 8th and 9th Districts. All other districts in the City do have some number, but they are relatively small. I mean, this is a very critical and serious issue for me and for my constituents. I cannot speak for other Councilmembers, but other members have indicated the same. And as I've said before, a serious proposal on how we would address this particular problem would be very helpful in terms of actually moving forward on the NTI proposal.

Councilman Nutter

I have said that before. I'm not trying to be subtle or vague about it, and I'm hoping that there is a certain clarity about where I am on that and how I hold that in the context of the overall position that I would take with regard to the NTI Program.

Ms. Smith

Mm-hmm, right.

Councilman Nutter

It is at that level 38 6/6/02 FINANCE - 020275, 020285 of seriousness.

Ms. Smith

I appreciate that and I do understand that. I think, as you mentioned, it's -- one of the things is the scale of the problem.

Councilman Nutter

I understand.

Ms. Smith

As you say, it's significant. And that issue alone can, you know, require a significant amount of resources, even beyond what was budgeted for the housing and preservation activities.

Councilman Nutter

I understand, but as --

Ms. Smith

So we very much are committed to addressing that issue, to figure out how we might could do it in a cost-effective way. Yes, we are committed to that.

Councilman Nutter

I understand and I can appreciate that, and we're not going to spend our entire budget dealing with retaining walls. On the other hand, as they say, "A journey of a thousand miles begins with one step."

Councilman Nutter

We have to take a 39 6/6/02 FINANCE - 020275, 020285 step.

Councilman Nutter

The second is, what, if any, discussion has there been? and is there any adjustment in the view of the Administration with regard to kind of on the other side of the street, or the other side of this issue, which is the curb and sidewalk discussion?

Councilman Nutter

Retaining walls are, obviously, in the back; curb and sidewalk out in the front. Where are we on that discussion?

Ms. Smith

Again, we're looking at it. To be frank, Councilman Nutter, to look at the three issues, as you said, the infrastructure issues --

Councilman Nutter

Right.

Ms. Smith

-- represents a significant cost to be able to address that in a way. Needless to say, there are 90 or so dangerous retaining walls. Probably the number of curbs and sidewalks which may need a repair is probably a significant number. And so the challenge that is presented 40 6/6/02 FINANCE - 020275, 020285 to the Administration is, how do we -- how do we meet these vast needs of a older American city --

Councilman Nutter

Right.

Ms. Smith

-- at a time when resources are constrained, when it's becoming increasingly difficult to look to the federal government for the appropriate amount of support. I mean, we're here trying to make adjustments in our Community Development Block Grant because last year, Congress cut those resources. And even though the City has been very active with a variety of organizations to find -- you know, to work with at the federal level for resources.

Councilman Nutter

Mm-hmm.

Ms. Smith

We, you know, are reaching out to other older American cities to talk about this issue of infrastructure. You know, can we, you know, look at -- one of the things that I would like to explore is looking at resources in non-traditional federal departments or at the state level that can help support a program.

Councilman Nutter

Right.

Ms. Smith

But we're being frank. 41 6/6/02 FINANCE - 020275, 020285

Councilman Nutter

I understand that.

Ms. Smith

And it's not to say that there isn't a need.

Councilman Nutter

Right.

Ms. Smith

Or a legitimate need.

Councilman Nutter

Right, there is a need.

Ms. Smith

But the cost and how we do that and where the resources come from is the challenge that we're presented with.

Councilman Nutter

Miss Smith, let me at least offer to you at least a part of the way that I think and try to attack these kinds of problems. If we try to figure out how to solve the big problems in their totality, we will be overwhelmed by the magnitude of the problem, and we will study it and we will think about it, but ultimately, we will do nothing. Many streets throughout the City need to be resurfaced. The reality is, we don't resurface all of the streets every year. We set aside a set amount of money that's for resurfacing, and we resurface the amount of streets that that 42 6/6/02 FINANCE - 020275, 020285 will take care of. And, then, unfortunately, we are all left to then deliver the message, "I cannot do your street this year; it's on next year's schedule. It doesn't mean we don't care about you, it doesn't mean we're not going to get there. We just don't resurface all the streets every year because we can't afford it." We're not going to fix all of the retaining walls at one time. We're not -- everybody's not going to get new public infrastructure, curbs, and sidewalks. But that doesn't mean that we shouldn't do something and dedicate a set amount of resources. We have X-amount of dollars that we're going to dedicate to X or Y or Z. When that money runs out, that's the ends of it for that year, and we have to live within those constraints and within those budgets. And, yes, there are other cities across America that are old, with aging infrastructure that do these kinds of things, and everybody doesn't get what they want every year. That's the reality of life. So all I'm asking is that we expand our 43 6/6/02 FINANCE - 020275, 020285 thinking on this and not get totally mired in the "It's so overwhelming, we can't do anything about it because we might not be able to solve everybody's problem and do something." That's all I'm asking.

Councilman Nutter

With regard to the responses that we received yesterday --

Ms. Smith

Oh, I also just wanted to make sure I distributed two letters that went directly -- Councilwoman Blackwell, that went directly to Rick Sauer in response to a question raised. And then we also officially responded to a question that went to -- that Councilman Rizzo raised in correspondence. These letters were delivered to them yesterday, and these are just copies of the letters.

Councilman Nutter

Okay. I saw the letter to Mr. Sauer; I did not see the letter to Councilman Rizzo.

Ms. Smith

Oh, okay.

Councilman Nutter

I will read that shortly. 44 6/6/02 FINANCE - 020275, 020285 We received a package of responses through the Chair yesterday to questions that have been raised over the past few days. I just have a couple questions about those responses. Number 4 has to do with the debt service schedule for the first series of bonds as well as the projected debt service payment and draw-down schedule for FY '03. What was the amount of debt service set aside for FY '03 in the City's operating budget?

Ms. Smith

In the City's operating budget, it was $20 million.

Councilman Nutter

Am I reading this debt service schedule correctly that the debt service payment on June 30, 2003, which is the last day of the next fiscal year, is $10,938,306?

Councilman Nutter

Then why did we set aside $20 million in debt service in the City's budget?

Ms. Smith

I believe at the time when they were putting together the budget, which actually, as you know, preceded the final authorization for the NTI bonds, they just based it 45 6/6/02 FINANCE - 020275, 020285 on the projection, you know, if everything was issued at one time.

Councilman Nutter

Well, we always knew that we weren't going to issue all of the bonds at one time 'cause you can't spend it in three years, right? We always knew that, right?

Councilman Nutter

Right?

Councilman Nutter

What happens to the $10 million that will be in the debt service line item for NTI and you're only going to spend 10 and you have 10 left over. What happens to that?

Ms. Smith

As it occurs -- as it occurred last year, when we -- as it occurred last year, when they had also, I believe, budgeted for Fiscal Year '02 money to carry debt service in the event the bonds were issued, any reprogramming of it that would be submitted to Council was a part of an appropriation transfer ordinance. We -- within the Administration, we've been looking at the issues of costs, as I explained earlier, around wrap-up insurance and the related activities to NTI like lot-cleaning and -- not 46 6/6/02 FINANCE - 020275, 020285 lot-cleaning but lot enhancement. But we have not made, you know, really specifically reprogrammed or said we will use the dollars otherwise. But as you know, any change in that appropriation will be -- we would put together a budget, and it would be reviewed by Council.

Councilman Nutter

Well, let me just make sure I'm understanding, though. I mean, in essence, there is $10 million extra in the debt service line item in the City's FY '03 budget, correct?

Ms. Smith

That is correct. And let me just -- there's one additional thing I just want to mention. We've always contemplated, as a part of FY 2003, seeking volume cap allocation and resources to fund approximately another $15 million to support particularly the land assembly activity and to fund things like the expanded HRP Program and the Philoan Program. Based on those projections, we anticipate we'll probably need -- if we get the State authorization to issue that type of bond, we project that we would need another about 1.25 million, depending upon where interest rates 47 6/6/02 FINANCE - 020275, 020285 are.

Councilman Nutter

To service that debt.

Ms. Smith

To service that debt. That would be like a third series, so to speak, but we haven't issued that series. In fact, we would be seeking allocation over the summer if we can get it. And then with the rest of it, it is the difference, there is a difference between what was budgeted in the budget and what we actually --

Councilman Nutter

Do you expect the next offering -- what was the -- we received $143 million in proceeds, is that correct, from the offering?

Ms. Smith

That is correct.

Councilman Nutter

What was the financing?

Ms. Smith

I didn't hear the last part of your question.

Councilman Nutter

What was the actual financing amount? We received $143 million in proceeds, correct?

Ms. Smith

Yeah, it was approximately 48 6/6/02 FINANCE - 020275, 020285 --

Councilman Nutter

What was actually sold in the market?

Ms. Smith

It was approximately, I believe, $150 million.

Councilman Nutter

Okay. Are you anticipating the next offering -- I mean, we've talked about this now in the context of $295 million up from the 250 because of --

Ms. Smith

Yeah, we got very good interest rates with respect to that.