we shifted everything down creating a gap using that same curb cut or a curb cut that shifted

Similar wording

further to the north i'm sorry having a drive aisle to the north of us creating so now the

Similar wording

neighbor to the north has their own yard or lot as separation and then the drive aisle

Similar wording

we push the buildings to the south and then have still have the building that wraps around

Similar wording

creates a little more space between the back of the property of 1326

Similar wording

and then where the structure is going to be at what is now 1326R.

Similar wording

The advantage now is that we can, by consolidating these lots,

Similar wording

what you can't do when they're separate,

Similar wording

the city won't let you do it,

Similar wording

to run utilities over a property that you don't own.

Similar wording

And now we're able to run all the utilities through the drive aisle.

Similar wording

Sorry about that.

Similar wording

And get them out to Burke Street,

Similar wording

which you'll hear from both the appraiser and from my client makes this project viable and

Similar wording

also the minimum variance that's required to make this project and the development of this project

Similar wording

viable um here are some renderings the original rendering of the plan where the project was

Similar wording

pushed to the north that was originally presented to the community group and then the revised

Similar wording

project with it pushed to the south providing that space with the abutting property to the north that

Similar wording

we heard so much from. This is the existing structure that presently exists at 1328 and 1330.

Similar wording

You can see there's an existing curb cut there now. Our curb cut will probably be a little

Similar wording

smaller than that so it technically provides a little more space for on-street parking.

Similar wording

And then this is the back. This is the view from Welp Street.

Similar wording

some additional images again this is the property to the north of us of our neighbor to the north

Similar wording

here's the view of the rear of our property

Similar wording

and here's from Burke Street you can see series of developments existing structures two and three

Similar wording

stories this is the one structure to the north of us on Burke's that I mentioned that has the

Similar wording

that was granted variances as has the multiple structures structures that extend all the way to

Similar wording

East Wilk Street. That was existing. A newer development down at the corner at Belgrade.

Similar wording

Corner of Belgrade and then coming back East Burke Street. Again, a mix of two and three family

Similar wording

dwellings. You have the institutional or educational facility down at the end of the

Similar wording

block at Thompson. And just to get a straight search of Wilk Street, this is the access from

Similar wording

From Belgrade, where you would access Will Street, you can see it's around where they access.

Similar wording

And coming back, here are the homes.

Similar wording

That's the back of the project.

Similar wording

That's to the north of us with the multiple structures that had their refusals.

Similar wording

Also, from Will Street, the properties, the abutting property to the north of us, our property, properties to the south.

Similar wording

And then you can see the dead end of the Wilts Street Alley, other properties using it for parking, and then swinging back around.

Similar wording

And that's the parking of the project on Montgomery Avenue that I referenced that was also granted the same variances that we're looking to have here, have granted here.

Similar wording

One of the things that we have at tab 18, we do have the zoning archive for that project on Montgomery.

Similar wording

And again, you can see the layout that I discussed with the common drive and then five single, a number of single family homes, five of them, just like we're proposing here, went to the zoning board in 18.

Similar wording

And again, the variance is rear yard depth, oops, rear yard depth, and then having five dwelling units.

Similar wording

And then this is the project down the street, the one that I indicated had multiple structures, some of which backed up to Wilk Street.

Similar wording

Mr. Orpides, could you bring your appraiser on? Sure. Caitlin, can you please jump on for a second? And please raise your hand.

Similar wording

Ms. Caitlin, you're allowed to speak. Hi, hi. Could you state your name and spell for the court reporter, please?

Similar wording

Yes, sir. It's Caitlin, K-A-T-E-L-Y-N, Drosnok, D-R-O-S-N-O-C-K.

Similar wording

Do you swear for him to tell the truth, the whole truth, nothing but the truth?

Similar wording

Yes, sir.

Similar wording

Counsel, proceed.

Similar wording

Caitlin, David Orfinides here.

Similar wording

Who were you retained by to prepare the appraisal report that I have up on the screen right now?

Similar wording

1330 East Berks, LLC, who is under agreement to purchase the site.

Similar wording

Okay.

Similar wording

And it's a pretty extensive review and analysis, both of the subject.

Similar wording

And it's a pretty extensive review and analysis, both of the subject property and of the neighborhood surrounding it,

Similar wording

comparables regarding RSA-5 properties to be developed for single-family homes.

Similar wording

Is that correct?

Similar wording

Yes, sir.

Similar wording

Okay.

Similar wording

And without going through the whole report, because I know that the hour is getting late, the morning session has gone on for a while.

Similar wording

Now, as it's present, well, was the price that our clients,

Similar wording

respective clients, paid for this property a fair and reasonable price

Similar wording

based upon your analysis?

Similar wording

What they're under contract for?

Similar wording

Yes, yes, yes.

Similar wording

Assuming that the development that they are looking to do, yes.

Similar wording

But if the, you know, if this doesn't get permitted, or this isn't, you know, proposed, it doesn't really make any sense. I don't I don't believe anybody would would purchase this property without requiring additional variances for development just due to the configuration. So I mean, I bet I don't know if that's a complicated answer, but not without additional variance or, you know, relief.

Similar wording

okay so for the for the for the you know you've heard me speak about and we've discussed the fact

Similar wording

that you know but for the issue with um the irregular shape of 1326 are it the fact that

Similar wording

it doesn't have street frontage but most importantly on on a city street but most importantly the fact

Similar wording

that it doesn't have access to utilities directly in front of it um that utilities have to be

Similar wording

access all the way down the street from belgrade um if it weren't for those those those conditions

Similar wording

uh it would be viable to develop this property as as as it's presently structured as three single

Similar wording

family homes correct correct yeah okay and that because of those conditions it's not viable to

Similar wording

develop it as it presently exists as three separate lots with 1326r fronting on um fronting on uh

Similar wording

east uh east wall street correct correct and that with the five the five units um that the price

Similar wording

that they paid they didn't overpay for the for the property correct correct and in fact they

Similar wording

probably you know got a little bit of a of a good deal actually is that not correct uh yeah i i think

Similar wording

so given the given the complexity of the assignment you know the project yeah so we're not here for

Similar wording

variance because they paid too much for the property, correct? Correct. Oh, no, no, no.

Similar wording

Okay. And again, the five unit, based upon your research of nearby development,

Similar wording

nearby properties, the five unit development is a viable development at this location, correct?

Similar wording

Absolutely. Yep. All right. Thank you. I'm just going to do, I know we're running short on time.

Similar wording

There's two things to tie into that. I'd like to have Tom Famoletti speak because he's with 1330 East Burke Street, and he's the one that now takes their information, runs construction costs, and outsales and looks at the viability of both.

Similar wording

Okay, let's bring him on.

Similar wording

And then also I want to have the architect come on, talk about shadow studies and some of the other issues.

Similar wording

Okay, all right.

Similar wording

Bring him on, please.

Similar wording

Tom, if you can raise your hand.

Similar wording

I'm on.

Similar wording

Hi, could you state your name, please, and spell for the court reporter?

Similar wording

Tom Familedi, T-O-M-F-A-M-I-L-E-T-T-I.

Similar wording

You swear a firm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

Proceed, counsel.

Similar wording

Tom, you heard Caitlin's statements, and you've read a report, correct?

Similar wording

Correct.

Similar wording

And with your group, you handle kind of the financial side of things and do the pro formas and figure out the commercial viability of the projects, correct?

Similar wording

Correct. And were you actually involved with the project that I referenced behind this property

Similar wording

on East Montgomery? We were in the capacity of the builder. Okay. And you've done a considerable

Similar wording

number of other projects in the community, correct? In the city of Philadelphia, correct?

Similar wording

That is correct. Okay. So you've heard me talk about 1326R. First of all, regarding its shape,

Similar wording

that two foot, five inch strip that goes out to East Burke Street, can that be utilized to

Similar wording

access utilities, the existing utilities off of East Burke Street? It cannot. Okay. And was it

Similar wording

correct in what I stated that it's the only way to access utilities based upon, and I can have

Similar wording

Derek Spencer also come on and verify this as the architect, the only way to get utilities to

Similar wording

1326R is by, is through down East Wilt Street, correct? That is correct. Okay. Which is an alley.

Similar wording

It's not a city street because there are no utilities in East Wilt Street. They have to

Similar wording

be pulled from belgrade correct that is correct okay and and you approximated them in your

Similar wording

That is correct.

Similar wording

Okay. And you approximated in your research with your team and other engineers, what did you approximate the cost to bring utilities down East Wall Street to 1326R?

Similar wording

We approximated minimally the $500,000, but could easily be upwards of a million dollars just for the utility work.

Similar wording

Okay. And that's more than what you're under contract to pay for the property, correct?

Similar wording

That is correct.

Similar wording

Okay.

Similar wording

Does that make, and you've run the numbers, does that, you've taken Caitlin's information, that unique physical characteristic of 1326R, as well as the issue with the utilities, does it make developing this property as it presently exists, single family on 1330, single family on 1328, and a single family on 1328R, does it make that commercially infeasible?

Similar wording

It does.

Similar wording

Okay. Now, you also ran the numbers on what you're proposing, which is five units on a

Similar wording

consolidated parcel, correct? That is correct. And was I correct when I stated that now allows

Similar wording

you to run utilities throughout the property, including the structures that are located back

Similar wording

towards East Will Street, back out to East Burke Street, correct? That is correct. Okay. And when

Similar wording

When you ran your pro forma for the five units, what was the result?

Similar wording

Was it based upon your numbers?

Similar wording

And obviously, we're no kind of volatile economy right now in terms of interest rates, supply chains, cost of construction, labor.

Similar wording

Was it a viable project?

Similar wording

It is. It is right now with everything going on.

Similar wording

It's a minimally viable project, but it is a viable project that we would pursue.

Similar wording

It's not so risky that you wouldn't pursue it.

Similar wording

the percentage was enough that you would still work pursue it, correct?

Similar wording

That is correct.

Similar wording

And what was that percentage that you came to?

Similar wording

Right now, it is at a 14% profit margin.

Similar wording

And I believe I'm being light on construction costs, but we'll call 14% now.

Similar wording

We typically target a minimum of 20%, 15% to 20%.

Similar wording

Okay.

Similar wording

And isn't it correct?

Similar wording

I mean, we had a conversation with Caitlin that she said that the market, kind of the

Similar wording

the general rule of thumb is 28%, correct? And I can come back on to adopt that statement,

Similar wording

if you will. So right now, the percentage, the profit that you're looking at is barely enough

Similar wording

to undertake this venture as it stands right now. It could easily, if things turn worse in terms of

Similar wording

interest rates, supply chain's cost of construction could actually dip down below where it's no longer

Similar wording

viable. That is correct. So as such, would it be your position that this five units, asking for

Similar wording

five, knowing that three is inviolable, but asking for five is the minimum number of units

Similar wording

on the properties, on the subject premises that's required, the variance that's required

Similar wording

for five is a minimum variance required to make this development of this property viable?

Similar wording

That is correct. Okay.

Similar wording

Counselor, I think you've made your point.

Similar wording

Okay, yeah, I was ready to move on.

Similar wording

How about the architect?

Similar wording

Yep, Derek, if you could please identify yourself.

Similar wording

Derek Spencer.

Similar wording

Mr. Spencer, you're allowed to speak?

Similar wording

Hi, could you state your name and spell for the court reporter, please?

Similar wording

Derek Spencer, D-E-R-E-K, S-P-E-N-C-E-R, from Nome Architects.

Similar wording

Right.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, and nothing but the truth?

Similar wording

Yes.

Similar wording

Proceed.

Similar wording

Derek, you heard my statements earlier today,

Similar wording

earlier during the proceeding

Similar wording

regarding the change in the design, correct?

Similar wording

Yes, I did.

Similar wording

Okay.

Similar wording

And I'm pulling up the letter of August 12th.

Similar wording

Oh, let me back up.

Similar wording

You and your team at Nome Architecture

Similar wording

did the drawings for this project, correct?

Similar wording

Correct.

Similar wording

Yes, we did.

Similar wording

You did the original design.

Similar wording

You did the rise design.

Similar wording

You did the renderings, the floor plans.

Similar wording

And we're going to talk in a minute to shadow studies.

Similar wording

Correct.

Similar wording

Okay.

Similar wording

And just in terms of the comments that came out of FNA, would it be fair to say that almost most of the objections came from the immediate neighbor to the north of us?

Similar wording

Yes, most of the concerns were with disturbing the soil in her side yard there, as well as concerns of privacy.

Similar wording

And that would be disturbing if you would be building right up to the common property line between 1330 and 1332, correct?

Similar wording

Correct. That was our main reasoning for flipping the entire design onto the south side of the site

Similar wording

rather than the north was to minimize any disturbance that might happen to her property.

Similar wording

Okay. But if you were to build, let's say if it was viable for us to build a single family home

Similar wording

on 1330, that structure, because the lot's 18 feet wide, would be built right on that

Similar wording

common property line with 1332, correct? Correct. A by right building would be up

Similar wording

Correct. A by right building would be up against the property line, extending upwards of 100 feet back from Burke Street.

Similar wording

against the property line, extending.

Similar wording

Okay. And so the change in the design addressed that concern, correct, by creating the drive aisle along that common property line, correct?

Similar wording

That's correct.

Similar wording

And the by-right building would be right up against her property line. And so decks and roof decks would be right up at her property line, would not have to be set back and could be looking over into her property, correct?

Similar wording

Correct.

Similar wording

And now we have a space where our buildings are set back. How far are they set back from her property line with that drive aisle?

Similar wording

I believe 13 feet to our furthest projection.

Similar wording

Okay. All right. So now we've addressed that. There was a concern regarding emergency vehicles getting back into the development. Did you reach out to the City of Philadelphia Fire Department to delve into that and see what the issue, if any, were there with that?

Similar wording

Yes, I reached out to Julian Sellers at the fire department and we had a conversation about the project and he also reviewed the plans and he sent an email directly to Mr. Dugan of F&A expressing his review of the plans that they did not cause any problem with the fire code.

Similar wording

All right. So there were three comments here in their letter. I think that, you know, regarding the density, Tom has addressed the first one. And then we've addressed the other two there with your testimony.

Similar wording

Shadow study. One of the criteria for the granting of a variance is the impact of air and light of neighboring or budding conforming properties.

Similar wording

You did a, you guys, you guys, you guys, you know more architecture prepared shadow study for this project?

Similar wording

Yes, we did.

Similar wording

Okay.

Similar wording

And you compared a buy-write design, our original design, and then the revised design, correct?

Similar wording

Correct.

Similar wording

Yes, we compared all three here.

Similar wording