tall building creates shade. And we know from common sense that the building is just feet away
from the public school where the neighborhood goes, the public pool, I'm sorry, where the neighborhood
goes to enjoy the pool and sunshine. And there will be multiple apartment windows overlooking
this public pool. And that's a lack of privacy and vulnerability to voyeurism to those that are
using the pool, including children, which burdens the use and enjoyment of the park pool by
residents. And you heard testimony also from Mr. Smith, and you've seen the plans that build this
tall building right up against the property line with zero setback. My understanding is the code
does require a setback, and this building will tower above the Vernon Street properties, casting
significant shade, harming the use of the enjoyment and the enjoyment of the Vernon Street
neighbors' backyards for gardening and other activities. The environmental cleanup hardship
is pretense and the appellate is asking the board to grant him a variance so that his business
decision to purchase the lot will be more profitable. And it doesn't matter for his
business decision that the use of the neighboring playground's facilities will be compromised
or that the neighboring houses will lose light and air and the vegetables growing in their gardens.
But the code is clear. It says that granting a variance, that the granting of the variance
That the granting of the variance will not substantially or permanently injure the appropriate use of adjacent conforming property or impair an adequate supply of light and air to adjacent conforming property.
will not substantially or permanently injure the appropriate use of the
It also says that the grant of the variance will not adversely affect transportation or unduly burden water, sewer, park, or other public facilities.
And again, mere economic hardship will not itself justify a grant of a variance.
A landowner cannot claim hardship when it purchases a property and knew or should have known that
there were restrictions on the use of the property. And evidence that a zoned use is less financially
rewarding is insufficient by itself to justify a variance. Therefore, we are asking the board
this morning to uphold the denial of the variance. And on behalf of my clients, I thank you for your
time thank you does the board have any questions no no i have um sorry i'm sorry i i just have
um a response if i may sure uh i mean i i i appreciate uh uh council's uh statement but i
think um you know a number of uh factual inaccuracies are there concerns and i do have
um john buzan um as a rebuttal witness um an environmental expert that can um testify to
um you know act two and to the uh requirements that any site like this um you know in order to
be financed no matter what the use we need to do a cleanup and we need to go through act two
so i'd like to call mr buzan well my understanding was that the appellant has
had rested. I had not. I had reserved my time and and you wanted to raise issues about environmental
which you did and I had. That was just my my closing statement. It's all contained in the
act. You raised it in Alaska. I would like to hear from your witness. I would like to hear from
your witness. Thank you. John Buzan is here.
hi sir can you put your name and address on the record and spell your name
yes uh john buzan uh b-u-z-a-n uh my address is 14 dale lane malvern pa 19355
you swear or firm to tell the whole truth and nothing about the truth
I do. Okay, you may proceed. Mr. Buzan, can you just tell us about your
profession and your professional credentials?
I'm a licensed environmental engineer. I've been in the environmental cleanup business
since 1991.
I've probably participated in hundreds of sites like this one, former gas stations.
My job right now is president of Comstock Environmental, and we still perform tank
removals, soil remediation, tank installations.
and uh you've testified in front of uh boards and townships before i have
um uh i think i submitted uh mr buzan's cv to um to sharon's letter counsel um
i'm sorry we're getting feedback from someone um yeah we submitted mr buzan's um uh
uh cv yesterday that sharon seleta oh i i didn't receive a copy of that i didn't even i didn't
know mr buzan was testifying today um well um you heard i i asked the board to qualify him
or consider him as an expert i would object to him as a witness
i would consider him a witness
um and i apologize in time and if i realized you weren't copied on that i would have floated
um so mr buzan um uh have you had an opportunity to review the um the historic environmental
reports and um the site yeah i reviewed uh two reports one from a company called emg in 2009
uh 17 and then brick house i believe 2019. and can you uh tell us about your findings and tell
us about what your estimated costs are in order to redevelop the site?
Sure. Both EMG and Brickhouse found
a formally closed underground storage tank still remain on site.
They didn't investigate what was in the tank, so there's some question about that.
They didn't investigate what was in the tank, so there's some question about that.
They both identified odors, petroleum odors, in the soil, below the tanks, and around the tanks,
and then both investigated groundwater related to petroleum compounds,
And they found several compounds related to gasoline, waste oil, possibly heating oil, and several of the borings and wells exhibited those compounds, which are regulated and above statewide health standards in the state of Commonwealth of Pennsylvania.
I reviewed it
I had some comments about it
I would object again to him testifying
to a report he didn't prepare
Thank you
I'll continue
So I estimated
as I do for many
developers
what a good budget would be.
And I know that Brickhouse provided
about $170,000 estimate.
I object to him testifying about a budget.
He's here as an expert in environmental matters,
I believe.
Can you please continue testifying?
You submitted that report into evidence.
And so...
Just to be clear,
when you counsel your clients on environmental remediation, you also counsel on the cost of
cleanup? Yes. So you reviewed the Brookhouse numbers and you reviewed the findings and what
was your opinion now in 2021? So ultimately I agreed with what they suggested. I agreed
with the basic premise of their cost. Although when I looked at the data,
it looked like their estimate for soil remediation didn't incorporate about
600 or 700 cubic yards of soil that I would estimate is contaminated and is contributing
to the groundwater contamination issue. And I would also surmise, based on the data I'm reading,
that the soil would also reveal a potential vapor intrusion issue. Pennsylvania has vapor screening
values. The prior consultants didn't evaluate that. In fact, Brickhouse suggested that that
be looked into. But based on, again, the data that I'm looking at in the groundwater, the
levels of compounds exceed the vapor screening value in groundwater. So I'm assuming, I don't
know for sure, but I'm assuming that the 10 or 11 feet of soil between the bottom of the
tanks and where the samples were taken also exhibits levels of the compounds above a vapor
intrusion standard and therefore that needs to be investigated. I suggested in this letter for
budgeting that not only the soil that Brickhouse said would be removed, which was about 70 yards
of soil. I did a quick measurement. I assumed you would dig five feet around the tanks in addition
to the tanks and underneath the tanks and came up with 670 yards. So I added another $100,000
based on the cost of the soil and excavation and the backfill and restoration.
um so i added a hundred thousand dollars or 110 thousand dollars to brick house's estimate
um for soil remediation soil remediation and again because the samples were in the
they're in the water table i assume there'd be some de-watering so uh how about how about um
USTs, hydraulic lifts? Brickhouse included the removal of USTs and
hydraulic lifts. They didn't mention the oil water separator. But again, overall, I agree with their
numbers. They didn't specify in detail what the numbers reflected. But I, you know, as far as a
as as far as a pro forma you know i don't disagree with it and uh but but with the additional soil
pro forma you know i don't disagree with it
that they seem to underestimate they seem to only estimate about a truckload per tank
and again based on their own data it looks like there's there's at least 10 or 11 feet
between the bottom of the tanks and the contamination that they they identified so
So I added that to the estimate. I also, and it probably wasn't part of their scope, but
in their boring logs, I noticed that they identified fill materials, particularly from
the surface down to five feet. And I know in most cases, most people don't remove that soil,
but they didn't analyze it they didn't analyze anything from zero to two feet
the surface soils underneath the asphalt concrete and in the back back area
so i add another hundred thousand dollars for budgeting for potential soils exchanged there
those surface soils usually have metals or coal tar compounds or in a gas station could have been
subject to spills, overfills that they didn't have the shutoffs that they have now. And so we
commonly see contaminated soil in the surface. So it just assumed a full property scrape of two feet
and again added another $100,000. So again, they're unknown, but they're common.
So total, you had $206,000 for the underground storage tanks, hydraulic lift, soil remediation, an additional $76,000 for the ACT-II monitoring, and then you put an additional contingency for the surface soils to get to about $382,000. Is that correct?
that's correct and i didn't include some other things that that should be minor but uh should
be included there's still risk with um any kind of excavation uh the so it could be a little less
but it could be a little more i guess that's correct that's correct so if you're counseling
your client um with um residential and a park adjacent playground um would would you um recommend
against remediation or going through act two well i no i i would never recommend against a cleanup
and i i believe um again the groundwater condition is a reportable release and and would be
um possibly within act 32 or or other acts other than act two so uh that that's a legal question
um but no i would i would definitely want my client to achieve compliance and the uh as you
mentioned i think before i think anyone lending the money or any stakeholders in a property like
this would want them to have oversight from the dep and clean this up to make sure everyone's safe
and so even if it was um a ca1 use a medical use a restaurant use or a multi-family use
you would recommend the same procedures?
Yeah, the data exceeds the non-residential standard as well.
So I think either is required
and would be prudent to address in a similar fashion.
And your experience,
in order to get financing on something like this,
you're going to have to go through this process.
Objection to financing as his area of expertise.
So noted.
I don't think he's saying that's his area of expertise.
I'll just say you regularly provide your reports to lenders, and this is a requirement in your experience to lenders.
Yeah, for the record, I've worked for a lot of lenders.
I understand their requirements and their regulatory obligation.
obligation. Typically, at this point in time, you know, 30 some years after environmental
regulations have been put into place, the lenders are looking for a state regulatory agency to
approve the environmental on a site like this. Thank you very much. I have no further questions.
Thank you. Does the board have any questions? No. No. Is there anybody in the virtual
audience left to testify i have a quick uh just clarification question um mr buzan the the reports
Mr. Buzan, the reports that you reviewed, what kind of standard were they using to test the soil?
that you reviewed they were
Was it a residential or a commercial standard?
They evaluated both, I believe. I can check. And again, I know I evaluated both.
Did you visit the site?
No, I've only looked at it on this Google Earth.
fit. Okay. Did you conduct any tests of the soil? No. Did you prepare any reports?
I prepared a short summary. Okay. Okay. Thank you. Mr. Buzan, that's data. There's data in the
reports of what exists in the soil. Is that correct? Correct. So data is then applied to
residential or commercial standard of how it would be remediated is that correct correct so you you
basically say if there's a if there's a contaminant it's a part per million or part per whatever the
date is of what exists and then you from there um you determine what the um whether it's an
acceptable level or it's required to be cleaned up is that correct correct thank you okay we're
going to wrap this up the board has no questions all right planning commission yes i'm sorry we
have quite a few witnesses oh we still do okay we have um charles richardson from the council
person's office he can be he can unmute himself and speak great thank you miss sonkett
good morning madam chair hi how are you i'm well how about yourself great name and uh who you work
for charles richardson from the office of councilwoman cindy bass from 312 city hall
do you swear if i'm to tell the whole truth and nothing but the truth i do okay you may proceed
in the strongest possible terms uh councilwoman bass is opposed to granting a variance for this
project. The East Mountain Area Neighbors RCO has held quite a number of Zoom-based meetings with
the developer over the past year regarding this project. In February, the developer indicated that
they would return to the community with possible changes to their design,
and the councilman had actually hoped that they would rethink what they were proposing and work
with the community to come up with a viable use that satisfy both their needs and the community's
interest. But in April, when the developer returned with the revised plan, it was with
essentially the same design as far as height was concerned and with the same footprint as well.
The community had requested that they change the footprint to allow more of a setback between the
proposed building's perimeter and the near neighbors. The councilwoman feels that this
proposal represents a gross overuse of the land, especially in proximity to the playground.
She feels the proposed number of apartments at 33 is still overly dense and the traffic
generated by this building will likely dramatically affect the youth traveling to and from the
playground and the surrounding community as well. The community has continually rejected
this developer's proposed use of this property and as such she's requesting that the board
deny this variance. Thank you very much. Okay Madam Chair we also have available Kelly O'Day
please unmute yourself and wait to be sworn in.
I'm unmuted.
Hi, can you put your name and address on the record, spell your name, and I'll swear you in.
Thank you.
It's Kelly O'Day, old apostrophe D-A-Y.
I live at 301 East Durham Street in East Mount Airy.
I'd like to talk about the recent testimony we just heard on the excavation requirements as a
retired environmental engineer I'd like to point out there will be major excavation of the site to
put in the new building. Part of what must be considered here is the change in cost
if, in fact, the remediation is done versus what would be the normal excavation of that site.
Because in looking at it, you'll see that the oil underground storage tanks were all in the area.