ZBA Hearing - August 18, 2026

Philadelphia Zoning Board of Adjustment (ZBA)Aug 18, 20263h 10m

such that they could remain on the site under this version of the plan they are both in uh positions

Similar wording

that would be problematic um and not possible to create this okay scott i'm gonna now go to the

Similar wording

floor plans, which I think are most helpful for my next questions for you, which have to do with

Similar wording

the requirement for the van accessible parking space. Can you explain to the board why a van

Similar wording

accessible parking space was not provided in the plan? So van accessible parking spaces are

Similar wording

primarily for multifamily projects to provide ADA accessibility to those multifamily buildings.

Similar wording

They're not required in single-family homes per the zoning code.

Similar wording

We do not have, we would need to provide an eight-foot parking stall with an eight-foot clear space for that van accessible space to be properly used.

Similar wording

it also needs an eight foot clear height which is a large amount of space which would increase

Similar wording

our garage height and add to one of the height refusals or just the height in general to the

Similar wording

project which was a primary concern going through this process okay so am i understanding correctly

Similar wording

that if we were proposing 10 single family homes with two park two car parking each which is what's

Similar wording

being proposed here on one lot but if we were on 10 individual lots that were attached like a typical

Similar wording

philadelphia row home street would would this code provision requiring ban accessible parking

Similar wording

apply to them it would not apply okay so again why does it apply here it applies for the technical

Similar wording

nature of the refusal uh being multi-family 10 units on one lot which will eventually be um

Similar wording

Subdivided in a plane unit development, turning this into single families.

Similar wording

Okay, thanks Scott. That's all I have for Scott.

Similar wording

May I, I think it'd be your pleasure to get rid of those witness. Can we put up the.

Similar wording

Yeah, the plan has the.

Similar wording

building shown on Pichin?

Similar wording

The actual building?

Similar wording

Like the zoning plan?

Similar wording

Yeah.

Similar wording

Scott,

Similar wording

the proposed eight units

Similar wording

that you were discussing,

Similar wording

were they

Similar wording

separate entrance from Pichin

Similar wording

and separate entrance from Larsen, correct?

Similar wording

Correct.

Similar wording

so there'd be two two curb cuts as opposed to one as proposed in your development now correct

Similar wording

each single family home would need its own curb cuts provide parking so there would be

Similar wording

eight total curb cuts if parking were to be brought could you have not developed a plan

Similar wording

where you'd have eight units that are parallel to loriston or parallel to peachen and have access to

Similar wording

a parking area or a driveway behind those is that correct

Similar wording

you're asking if we develop two less units uh and provide a shared parking

Similar wording

i just want to clarify the question provided access to the garages from the rear

Similar wording

there would be challenges with how the slope works for those buildings uh because the

Similar wording

grading would have to be raised up there'd be a large driveway slope to get to the rear

Similar wording

of the site which would have to be either we have a large surface parking lot in the rear

Similar wording

of those homes or we would have to be parking on the second or third level of those homes

Similar wording

based on the grade changes that would occur and the proposal here is for

Similar wording

And the proposal here is for 10 units that will run perpendicular to Lauriston and Pichin, correct?

Similar wording

That is correct.

Similar wording

And that is, are the homes on Lauriston and Pichin, do they front on those streets?

Similar wording

They do.

Similar wording

They have access from both of those streets frontages.

Similar wording

And so this proposal is inconsistent with the uses and the characteristics of the community, both on Pitchin and on Larson, correct?

Similar wording

We've provided facades that blend in with some of the surrounding contexts, providing porches to this and front entryways.

Similar wording

So I would argue that they blend into some of the surrounding contexts.

Similar wording

well the the porches face the the house on loriston that has that was adjacent to your twin

Similar wording

correct both porches face the street frontage peachen and larson those porches face there

Similar wording

don't they face the yard of the other house on peachen

Similar wording

alex maybe go there rendering it might be more clear council

Similar wording

what the rendering or do you want elevations whatever he can point to that would show that

Similar wording

those houses face loriston impeachin consistent with the other homes that are already on there

Similar wording

so the top image which is the southwest perspective that's larson street to the left

Similar wording

you can see there's a porch that fronts the entire street frontage of that

Similar wording

I want to go to that other perspective

Similar wording

to show the Peachen Street side.

Similar wording

Again, it's a little bit clearer in the actual renderings.

Similar wording

But yeah, you're kind of getting to it.

Similar wording

Yeah, so you can see there's a large porch

Similar wording

that fronts Peachen Street.

Similar wording

But all the homes behind that,

Similar wording

if you go back to the other one,

Similar wording

all the homes behind that,

Similar wording

the front of those homes face the backyard

Similar wording

of the other house on Peachen Street.

Similar wording

That is correct.

Similar wording

Okay.

Similar wording

And how far out does the front of this unit with the porch that you have described there, how much further out toward Peachin Street does that go compared to the adjacent house?

Similar wording

I'm going to zoom in.

Similar wording

So our front building face is set back.

Similar wording

As you can see, they're 17 feet, one and one quarter of an inch.

Similar wording

um roughly five feet in front of the adjoining the old twin at 4114 peach and street um and then

Similar wording

the porch comes out another i don't know there's a mention somewhere on there i'm just missing it

Similar wording

right now another five feet now the intent in providing the house to be a little bit further

Similar wording

is that the house to the southern plan side is directly on the street.

Similar wording

So this is set somewhat into the middle of both sides.

Similar wording

As you can see, 4104 Pichin is directly against the street frontage.

Similar wording

So we felt we're setting back a good amount,

Similar wording

but also somewhat in line with some of the existing character on Pichin Street.

Similar wording

But inconsistent with the direct next-door neighbor.

Similar wording

Correct.

Similar wording

Okay, I have nothing further next person, please.

Similar wording

John Featherman, if you could raise your virtual hand.

Similar wording

I do have I'm sorry. May I ask God?

Similar wording

How many square feet are proposed for each of these units?

Similar wording

Alex, you have that number.

Similar wording

THE OCCUPIED AREA OF THE ENTIRE SITE OF THE ENTIRE BUILDING STRUCTURE IS 7700 SO HOLD ON ONE SECOND.

Similar wording

I THOUGHT I SAW IN YOUR PLANS THAT IT HAD A 960 SQUARE FOOT FOR EACH OF THE UNITS.

Similar wording

THAT WOULD BE THE FOOTPRINT.

Similar wording

okay and doesn't the rsa 5 uh in council district 4 require 1440 square feet

Similar wording

uh that's specifically to the lot area for a subdivided lot

Similar wording

i'm i'm sorry what do you mean by that the 1440 square feet uh is required to

Similar wording

You subdivide a single RSA lot of land area, not necessarily building square footage.

Similar wording

So each of these will be less than the required RSA-5 because they are a planned unit development?

Similar wording

So each of these will be less than the required RSA 5.

Similar wording

We're not proposing a sub-bill.

Similar wording

No.

Similar wording

So the lot is staying 15,518 square feet.

Similar wording

If you were to divide that number by the 1,440, you would get 10 lots.

Similar wording

Okay. All right. Fine. Thank you. I have nothing else, sir.

Similar wording

next witness please John Featherman and while John is I guess being promoted

Similar wording

John is a licensed real estate professional he's drafted and we've

Similar wording

submitted a report regarding the market of the marketability of an 8 a 9 and a

Similar wording

10 unit version of the planning and development that we proposed so he's

Similar wording

going to speak briefly about his report and then i'm going to ask him some questions and then

Similar wording

obviously shan has questions john featherman you're allowed to speak great john a-o-h-n

Similar wording

f-e-a-t-h-e-r-m-a-n do you swear or affirm to tell the truth told truth nothing but the truth

Similar wording

yes i do counsel john um i think i would say now is your opportunity to to sort of

Similar wording

uh give you a brief statement about your report and then i'll ask you some questions

Similar wording

great okay so i am a licensed pennsylvania associate broker and i'm also a pennsylvania

Similar wording

licensed real estate instructor at temple university my role here is very narrow

Similar wording

it's to address the market consequences of reducing the number of residences at 4112

Similar wording

petchin street my conclusion is that 10 units are the minimum market supportable configuration

Similar wording

based on the information i've reviewed we have a developer and contractor model comparing all

Similar wording

three scenarios 10 homes nine homes and eight homes with 10 homes the model assumes about 2 000

Similar wording

square feet per home and an average sales price of 775 000 gross revenue would be seven million

Similar wording

$7.75 million. Projected cost would be about $6.64 million, leaving a projected profit of about

Similar wording

$1.11 million. With nine homes, the homes become larger, about 2,500 square feet, and the assumed

Similar wording

sales price jumps to $950,000 each. That produces $8.55 million in gross revenue, which is actually

Similar wording

$800,000 more revenue than the 10-home plan. But the projected profit falls to about $289,000,

Similar wording

which is about 3.4% of the gross revenue. The developer's concern here is straightforward.

Similar wording

A cost overrun, delay, concession, weaker sale price, or other project problem could erase that

Similar wording

relatively small cushion. And with eight homes, the model assumes 3,200 square foot homes selling

Similar wording

for about a million each. And despite 8 million in gross revenue, the model projects a loss

Similar wording

of approximately 1.13 million. So progression is important. Roughly 1.11 million of projected

Similar wording

profit at 10 homes, only $289,000 at 9 homes, and a $1.13 million projected loss at 10 homes.

Similar wording

The issue is about depth of demand here. The project doesn't need one premium buyer.

Similar wording

It needs enough buyers to absorb all the homes at the prices required to make the project work.

Similar wording

All three pieces point in the same direction. The contractor says fewer homes spread difficult site costs among fewer units. The financial model shows the margin collapsing at nine homes and becoming a loss at eight. And the MLS evidence shows greater market resistance at the higher prices those alternates require.

Similar wording

Based on my experience in the Philadelphia residential market, my familiarity with Roxborough and Maniunk, and my review of the plans, MLS evidence, contractor feasibility statement, and revised developer model, it's my professional opinion that 10 units are the minimum market-supportable configuration for this project.

Similar wording

Thank you, and I'm happy to answer any questions.

Similar wording

Are you done?

Similar wording

I'm going to ask him a few questions.

Similar wording

Sure.

Similar wording

um john the the mls reports and the data that you reviewed are these the same review

Similar wording

reports and data that is available to the general public no so they're not bright

Similar wording

available to the general public no so they're not bright mls is our professional most multiple

Similar wording

listing database that we use as real estate agents it contains detailed listing and transformation

Similar wording

information transaction information including list listing histories that generally are not

Similar wording

available on consumer websites including sites like zillow redfin realtor.com okay um

Similar wording

Um, so where, where does the home have to sell for just for the developer to break even

Similar wording

here for the developer to break even, it's got to sell at about, probably about 775,000,

Similar wording

800,000, somewhere in that range.

Similar wording

Okay.

Similar wording

And where does the 664,000 break even point for 10 homes sit relative to the market?

Similar wording

So that would, that would give it considerably more room.

Similar wording

For example, one of the items I put in the report, 151 levering, solved for $799,990 after 40 days.

Similar wording

So the 10-home breakeven is more than $130,000 below that actual closing.

Similar wording

Is there evidence that the market has supported an 8-home breakeven of approximately $1.141 million?

Similar wording

Can you say that again? I couldn't hear.

Similar wording

Is there evidence that the market has supported the eight-home break-even point of approximately $1.14 million?

Similar wording

Not in the properties that I reviewed on the MLS.

Similar wording

The most relevant one, let me look here, is $268 DuPont.

Similar wording

It started at $1.15 million and did not sell at that price.

Similar wording

What happened there?

Similar wording

So that's new construction.

Similar wording

Let me just check.

Similar wording

It's 3212 square feet, four bedrooms, three-car parking.

Similar wording

It was originally listed at $1.15 million, was reduced by $301,000 to $849,000, and was still unsold when I reviewed it yesterday.

Similar wording

Okay. A couple more questions here for you, John.

Similar wording

You spoke about sort of the razor-thin margin on the nine-home plan.

Similar wording

How common is a $32,000 concession on a home sold for what he'd need to sell it for, about $950K?

Similar wording

so i want to be careful here because 32 000 is about 3.4 percent of 950 000 mathematically

Similar wording

a concession of that amount on each home would wipe away the projected profit but i haven't done

Similar wording

a separate study showing how frequently buyers receive concessions of that size

Similar wording

so i don't want to characterize it as routine without data but what kind of concessions do

Similar wording

buyers typically ask for so in my experience they ask for things such as closing cost assistance

Similar wording

rate buy-downs, finished credits or repairs. I can speak from my brokerage experience,

Similar wording

but I don't have statistical studies showing how frequently each one occurs.

Similar wording

Okay, last question for you. What happens when absorption, the sale of these properties takes

Similar wording

longer than expected? So generally, the property remains exposed to carrying costs like financing,

Similar wording

taxes, insurance, marketing. Longer exposure can also result in price reductions. So I would

Similar wording

keep, I would say that, you know, it's going to hurt. Okay. And those things you described

Similar wording

could also very easily wipe away the razor thin margin of the nine home plan, correct?

Similar wording

it could it could and realistically it often does that's a theoretical profit but the reality is

Similar wording

you know these concessions happen supply and demand changes etc okay and last question is

Similar wording

there anything in the record that's inconsistent with your conclusion well yeah i mean there's

Similar wording

evidence i mean a home theoretically can sell over a million and i think it's over i think

Similar wording

it's really important to acknowledge that one wind guard for example which i have here sold for

Similar wording

900,000 after 62 days and i consider that rather than ignoring it but when i look at all the

Similar wording

evidence together including the longer market times the substantial reductions at 268 dupont

Similar wording

which i just spoke about i still reach the same conclusion okay all right thank you john hey i'm

Similar wording

yes sir mr featherman where is your office located yeah so my office is located in center city

Similar wording

philadelphia on 19th street between uh sansom and uh chesson street and when was the last time you

Similar wording

sold a property in the rocksboro area i don't remember i sold over i sold over 2 000 pro i've

Similar wording

sold or rented over 2 000 properties in my career so i don't remember and in this this matter you

Similar wording

were engaged as an expert witness correct yes and you've been paid by the developer

Similar wording

and you've been paid by the developer or someone on his behalf i haven't been paid by anybody yeah

Similar wording

or someone on his behalf i haven't been paid by anybody yet

Similar wording

you will invoice them for your services yes yes um and when did you meet with anyone from the

Similar wording

community from central roxborough community association i did not meet with anybody that

Similar wording

was not within my scope okay did you think it was important to possibly meet with the neighbors who

Similar wording

might be impacted by this development that was not within my scope and but the financial aspects were

Similar wording

within your scope, correct? Yes. And you've outlined the potential dangers to the developer

Similar wording

of a project of less than 10 units, correct? I've made them aware of what the numbers are.

Similar wording