ZBA Hearing - August 18, 2026

Philadelphia Zoning Board of Adjustment (ZBA)Aug 18, 20263h 10m

I'm not going to call any of it dangers. And the financial risk that's involved,

Similar wording

that's the only hardship you see, correct? Again, what I did was I presented an analysis

Similar wording

that looked at selling 10 units nine units and eight units and that's without respect to the

Similar wording

configuration of those proposed units what do you mean by that well how they're laid out on the site

Similar wording

or different proposals for laying out no so i mean that that's not true i as i mentioned before

Similar wording

the the if you're going to have eight units nine units or ten units you're going to have

Similar wording

different square footages the ten unit ones are going to be smaller and the eight unit ones are

Similar wording

to be bigger again i just gave that square footage all right thank you i have nothing

Similar wording

further mr thank you your next witness yep mark mike gargiulo of the how group he's a general

Similar wording

contractor for the project and he prepared a brief um feasibility statement which i submitted to the

Similar wording

board which is on the screen promoting Mike is rejoining now thank you

Similar wording

mike yes hi sir could you please state your name and spell for the sonographer

Similar wording

yes mike gargiulo m-i-k-e last name g-a-r-g-i-u-l-o right do you swear or affirm to tell

Similar wording

the truth the whole truth nothing but the truth i do counsel mike can you describe your background

Similar wording

and experience in residential and multifamily construction in philadelphia yep i work with

Similar wording

the the how group we're a vertically integrated uh real estate development construction and property

Similar wording

management company in the city for over 25 years. And were you asked to provide a construction

Similar wording

feasibility assessment for the proposed development here? Yes, I was asked to give a high level

Similar wording

construction feasibility perspective and I reviewed the zoning and the site plan. Okay,

Similar wording

and how would you describe the physical characteristics of the site from a construction

Similar wording

standpoint? It appears to be a constrained urban site that has grade changes, multiple retaining

Similar wording

walls drive out conditions foundations and some access constraints and what kind of challenges

Similar wording

for construction to those constraints cause yeah it causes uh more excavation uh complicated

Similar wording

foundations the retaining walls require coordination and engineers drainage issues

Similar wording

waterproofing etc and what does all this mean for cost it means there's a lot of fixed costs

Similar wording

that are directly related to the site conditions okay and would a subdivision that proposed four

Similar wording

homes on peaching and four homes on loriston the same sort of theoretical plan i showed earlier in

Similar wording

my presentation would that create more or less uh site development complications and expenses

Similar wording

uh hard to know at this point but uh probably pretty close to what's actually there today

Similar wording

you're still doing a lot of the work that's underground whether you're building

Similar wording

10 9 or 8 houses okay um but but if there was if we were developing the back side and we had four

Similar wording

homes parallel to pechin and four homes parallel to lorist on that that sort of plan does that you

Similar wording

know because of the the site does that propose additional costs and complications rather than

Similar wording

this perpendicular pud development that we presented to the board

Similar wording

um no it still requires all most of the same things that are required under the

Similar wording

the perpendicular plan as the other planet the house is facing mentioned and marsh and

Similar wording

these these fixed site costs would they reduce if we went from from 10 to nine or eight homes

Similar wording

not necessarily um that's all i have for mike i have no questions of this witness is that the

Similar wording

end of your uh yeah if i could just have my client adopt my testimony sure

Similar wording

Good morning, sir. Could you please state your name and spell for the stenographer?

Similar wording

All right. Timothy Townhill.

Similar wording

Why don't you get a little closer to the mic?

Similar wording

Timothy Townhill, T-I-M-O-T-H-Y-T-O-W-N-H-I-L-L.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

Counsel?

Similar wording

Tim, did you hear my testimony today?

Similar wording

I did.

Similar wording

Was it true and correct?

Similar wording

It was, yes.

Similar wording

And do you adopt it as your own?

Similar wording

I do.

Similar wording

And do you adopt the testimony of your expert witnesses as your own as well?

Similar wording

I do.

Similar wording

No questions.

Similar wording

How long do you think your presentation will be, Dan?

Similar wording

Could be 45 minutes.

Similar wording

Okay.

Similar wording

Mr. Chairman, I just have a question.

Similar wording

For who?

Similar wording

For them.

Similar wording

Yeah.

Similar wording

It looks like, according to our notes, that Shannon Park testified earlier.

Similar wording

She did.

Similar wording

She's available.

Similar wording

I asked her to come today in case opposing counsel had questions for her, but I have no, I had no additional questions. That was going to be my question. Did you want to have, she testified in the last hearing. I wasn't sure if you had any questions. Thank you for asking, but I would be as brief with her as I was. Just want to make sure the record was there. Okay. Thank you. You're going to be 45 minutes. I expect it. Right. How many witnesses are you going to call Dan? Six, six or seven. Okay.

Similar wording

I think we're going to have to do a resumptive hearing, because I see there's people in the audience, too. Am I correct?

Similar wording

Yes.

Similar wording

Right. So, yeah, I don't want to start and then get you all the way through.

Similar wording

So, I think our resumptive date would be in 915. Does that sound right?

Similar wording

that's correct chair tuesday september 15th at 9 30 a.m 6 at 9 30 a.m i'm sorry 9 15 15

Similar wording

right at 9 30 a.m and then i think that way i don't want to break and i have to bring it back

Similar wording

and that way you have a fresh and we should be able to finish your presentation up that day i

Similar wording

appreciate that

Similar wording

okay all right everybody thank you very much we're going to take a five minute break and

Similar wording

then we're going to come back and and you're back with us right so why don't you just stay right

Similar wording

there you got another mi 2026 mi 2026 001 455 69 30 are late arlid street this is a a an appeal

Similar wording

against l and i attorney is david orfinetes also here is leon leonard reuter and alan knockamson's

Similar wording

firm, Mr. Goldberg. David, could you first state your name as spelled for the stenographer?

Similar wording

Certainly. My name is David Orfanides. Last name is spelled O-R-P-H-A-N-I-D-E-S.

Similar wording

You swear or firm to tell the truth, the whole truth, and nothing but the truth?

Similar wording

I do.

Similar wording

Mr. Goldberg, you've been here several times today. Leonard, could you please state your

Similar wording

name as spelled for the stenographer?

Similar wording

Sure. May it please the board, Leonard F. Reuter, R-E-U-T-E-R, Senior Attorney, City of Philadelphia.

Similar wording

All right. Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

David, we're going to start with you.

Similar wording

Okay, certainly.

Similar wording

David, how long do you think your presentation will take?

Similar wording

Uh-oh.

Similar wording

Probably.

Similar wording

I'm sorry.

Similar wording

That's not long.

Similar wording

Come on now.

Similar wording

Why don't you do this? Why don't you answer?

Similar wording

It's biased.

Similar wording

Listen to me, why don't you answer me without taking that deep breath?

Similar wording

Yeah, certainly.

Similar wording

I think I can be through.

Similar wording

I have one witness, one expert witness, and one or two witnesses from the neighborhood just to corroborate some conditions that he speaks about.

Similar wording

So I don't think I'll be more than an hour.

Similar wording

It might be 45 minutes.

Similar wording

Okay, well, let's start and see where we stand.

Similar wording

And this is about L&I, right?

Similar wording

It's the appeal against L&I.

Similar wording

This is appeal against L&I, appeal of a zoning permit that was issued for 6930 Ardley Street.

Similar wording

Right, but it's around L of an I, right?

Similar wording

So what would the neighbors be a witness?

Similar wording

I'm going to boil it down.

Similar wording

So what this is, is this property, 6930 Ardley Street, is bound by two properties, Ardley and East Sedgwick Street.

Similar wording

Yeah. All right. Um, in the planning commission's review of the zoning permit application, they designated hardly street as a primary frontage.

Similar wording

And that's important because under the zoning code, and we're going to talk about this since the property was owned on one at the time, if one frontage, not both front, because it's possible to designate both frontages as primary.

Similar wording

If one frontage, not both front, because it's possible to designate both frontages as primary, but if one is designated as the primary frontage, the front yard requirements for RM1 do not apply to the other frontage because every street frontage is deemed the front, right?

Similar wording

So, because of that, because of that determination, the developer, Mr Goldberg client was able to secure zoning a permit for an addition, not only to the rear of the property towards a rear shared drive into the rear yard area, but all the way out to the property line at East Sedgwick Street.

Similar wording

And it's our position that the Planning Commission, and that if it turns out that there's only one primary frontage and that primary frontage is Ardley Street, then that's permitted.

Similar wording

There's no question about that.

Similar wording

It's our position that the Planning Commission, with all due respect, made an error and designated only Ardley Street as a primary frontage and that they should have designated both streets, both frontages as primary frontage.

Similar wording

And then because of the rules applicable in RM1 regarding front yard setback, that you can't be any closer or further away from the property line than the adjacent properties, not abutting properties, but adjacent properties, that they would have had to have maintained at least a setback, approximately, or a setback that existed at the building as it presently exists and could not build an addition all the way out to Cedric Street.

Similar wording

So, being that we're laying the groundwork out, Mr. Goldberg, do you have comments?

Similar wording

Sure, yeah.

Similar wording

Okay.

Similar wording

Sorry, Len.

Similar wording

And I just was laying out with the basic issue.

Similar wording

Yeah, I understand.

Similar wording

Well, I think the basic issue is about L&I, but go ahead.

Similar wording

Right.

Similar wording

And to be fair, I don't dispute most of what Mr. Orphaniti stated, but the code explicitly

Similar wording

says the Planning Commission shall decide the primary frontage.

Similar wording

The Planning Commission makes that, they stamp it on the plan, and L&I issues a permit or a variance or, you know, acts based off of the Planning Commission's determination.

Similar wording

So whether L&I, L&I interpreted the Planning Commission's decision, I would, I don't believe it's up to this board to overrule a Planning Commission decision when L&I just plainly acted on what they decided.

Similar wording

Leonard?

Similar wording

uh yeah i would just uh echo that and also particularly add that again this this is an

Similar wording

appeal where again they've appealed against lni there is a provision that says that if you want

Similar wording

to appeal a preliminary decision by one of the um agencies that makes preliminary review you can

Similar wording

appeal that through an appeal to the zoning board but this was never presented as an appeal against

Similar wording

the decision of planning commission so this is kind of a new argument here um it was not part

Similar wording

of the original uh notice of appeal that was submitted by uh in my recollection it's not

Similar wording

part of the original appeal that was submitted by um by the appellant uh we'll just preserve

Similar wording

that argument um for now and just yeah yeah we'll start but my view of this this is about l and i

Similar wording

well so so then i just want to clarify that because to me it's about the an appeal of the

Similar wording

permit, of the zoning permit. And whether you want to, I mean, we typically call that an appeal

Similar wording

against L&I, but it's an appeal to zoning permit, and that includes the underlying prerequisite

Similar wording

reviews that were served as a basis of that zoning permit. Wait a minute. I see my counsel's

Similar wording

getting her. We're good. All right, start. We're going to see how this goes, okay? So, I mean,

Similar wording

I've given a brief opening, and I think with that, I'm going to get right into the meat of

Similar wording

it um we we had a um a report prepared by by a land planner brian seidel of seidel planning

Similar wording

um i'm gonna have him go through the report um and go through his conclusions um the basis for

Similar wording

his conclusions which are that again there are two primary frontages for this property and as such

Similar wording

the the approved structure should have been set back from both ardly street and sedgwick street

Similar wording

Mr. Seidel should be on the call right now.

Similar wording

Okay.

Similar wording

So I'd have him promoted to a panelist.

Similar wording

Excuse me, did you say Seidel with a Z?

Similar wording

S-E-I-D-E-L, Brian.

Similar wording

Promoting now.

Similar wording

If you'd like, I can share.

Similar wording

He's coming in as a panelist.

Similar wording

good morning everyone good morning could you please state your name is bill for the sonographer

Similar wording

Sure. Name is Brian. First name is B-R-I-A-N. Last name is.

Similar wording

Sure. Name is Brian. First name is B-R-I-A-N. Last name is Seidel, S-E-I-D-E-L.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

David?

Similar wording

Okay. Brian, have you appeared before this zoning board before?

Similar wording

I have.

Similar wording

Okay. And were you recognized as an expert in front of this zoning board?

Similar wording

Yes, an expert in land planning.

Similar wording

Okay. I would introduce Mr. Seidel's testimony today and his report.

Similar wording

as an expert in land planning before the zoning board i can go i included a cv

Similar wording

with my witness list that i submitted last week if you'd like me to go through that i can but

Similar wording

otherwise you're both okay okay yeah go ahead all right um brian um we're here what property

Similar wording

are we here before today uh it's regarding the property at 69 30 orley street and can you tell

Similar wording

me um what area of the city that property is located at uh yeah it's the upper northwest

Similar wording

planning district okay and can you for the benefit of the zoning board um i think most people

Similar wording

um will be familiar with that neighborhood um but can you give us a general overview of um that

Similar wording

neighborhood or that area of the city uh sure specifically i think it was indicated previously

Similar wording

is located in the southeast corner of the intersection of Arlie Street and East Cedric

Similar wording

Street. Generally, in terms of the housing that's in that area, most units of that block

Similar wording

of Arlie Street are semi-detached or two-family dwellings, larger front yards on the main

Similar wording

frontage and uh generally residential in character um can can i uh can i share my screen yeah for

Similar wording

some reason it's we let him share his screen please yes excuse me um mr orphanities i didn't

Similar wording

see your name so i can promote you oh on the attend now i was in and then i think i was

Similar wording

kicked out but i'm i'm on now okay yep there you are i'm gonna promote now

Similar wording

We should be coming in now great.

Similar wording

All right. Can you can you tell us a little bit about the the neighborhood in general, though?

Similar wording

Like the characteristics of the neighborhood, not just the block?

Similar wording

Sure. In general, I'd say it's a residential neighborhood. The subject property is served

Similar wording

by a rear residential alley that connects to each Sedgwick Street. In terms of the frontage

Similar wording

on RLA, as I mentioned, those buildings generally have a pretty large building setback from

Similar wording

marley street so they have larger front yards i believe the front yard is approximately 35 feet

Similar wording

based on the zoning drawings that were provided in the application and then

Similar wording

regarding the end units or the corner what i call a corner properties on these areas

Similar wording

those properties are also set back from the adjoining streets

Similar wording

okay so so when you're talking about the you're talking about the 6900 block of ardley street

Similar wording

right now correct that's correct okay and then you're talking about as far as corners are you

Similar wording

talking about uh what streets are at the end of either block at the end of the block at either

Similar wording

end of the block i'm sorry sure uh we're adjacent to east sedwick street and then to the east would

Similar wording

be east orgus lane okay and the conditions that you've described um regarding setbacks

Similar wording

exist at both ends of the block that's correct okay and then the lots that are located in between