lofts and i was not sure what the other ones referenced okay um for each of those uh site

Similar wording

photos shown in those proposed projects that are existing uh did you do a uh a similar zoning

Similar wording

analysis as you've done here about any steep slopes that were uh affected or variances that

Similar wording

were required uh no i did not okay so you don't know what situations happened for each one of

Similar wording

of those matters shown by Mr. Bonney

Similar wording

that led to the either existing building being redeveloped

Similar wording

or which would not be the case here

Similar wording

or a new building being constructed, do you?

Similar wording

Actually, I'm familiar with one of those

Similar wording

mill redevelopment projects,

Similar wording

but in terms of the same detailed analysis, no.

Similar wording

Okay, thank you very much.

Similar wording

So moving on, you, again, trying to speed things along here, you testified that there were multiple smaller options that could be built on this site, correct?

Similar wording

That's right.

Similar wording

And would you also agree that multiple larger options or taller buildings could be built on this site?

Similar wording

That is allowable within CMX3.

Similar wording

Okay. Now, are you aware that we have this proposed project has 185 units?

Similar wording

Yes.

Similar wording

And offers essentially one-to-one parking?

Similar wording

That's right.

Similar wording

Now, EFCC has objected to not having enough parking. Is that correct?

Similar wording

No.

Similar wording

okay i i would suggest to the board that it's in the rco letter i don't need to go back to it

Similar wording

so noted um the now mr langer would you agree with me that each of your options shown one two

Similar wording

three and four uh show approximately one-to-one parking that's right okay now also for each one

Similar wording

of your options shown, options 1, 2, 3, and 4, each option would also require the clearing

Similar wording

So each option would also require the clearing of the site, at least to some extent, if not entirely, correct?

Similar wording

of .

Similar wording

On the buildable portions of the site, yes, upper and lower.

Similar wording

So you would be removing significant growth in trees there, correct?

Similar wording

Yes, we would.

Similar wording

Okay. Now, have any of your four options been submitted to and or reviewed by

Similar wording

the City Department of Licenses and Inspection?

Similar wording

No. Okay. And you said that none of your options had had any analysis done for stormwater

Similar wording

management, correct? That's right. These options are not engineered at this point.

Similar wording

now uh mr langer you've uh i believe were you at both of the prior hearings

Similar wording

yes and you heard the testimony that there was uh there is currently no stormwater management

Similar wording

system or facilities on the site correct

Similar wording

i i don't recall i'm i'm sorry um okay well if i represented to you

Similar wording

that there is currently no stormwater management on site other than the natural conditions that

Similar wording

exist. Would you disagree with that? The existing site. The existing site. As it exists. Yeah,

Similar wording

there's no, it's covered in trees. Right. And Mr. Langer, you are not a licensed engineer in the

Similar wording

state of Pennsylvania, correct? That is correct. Okay. So you would not perform any stormwater

Similar wording

management analysis on the existing site with regard to the proposed project correct I would

Similar wording

not do that but as a lead project coordinating architect I would certainly be involved in those

Similar wording

in that engineering and that coordination okay now Mr. Langer Mr. Bonnie asked you if you had

Similar wording

experience with residential construction and you said you did is that correct that is correct

Similar wording

Do you have experience with large mixed-use commercial residential projects like the one proposed?

Similar wording

Yes.

Similar wording

Okay. And have you taken any projects with regard to steep slopes through the review process with the Department of Licenses and Inspections in Philadelphia and or the Planning Commission?

Similar wording

No.

Similar wording

Okay. So you would not be aware of how the Planning Commission determines whether steep slope variance is required, correct?

Similar wording

Correct.

Similar wording

Okay. Would you disagree with me if I suggested that prior testimony and corroboration from the Planning Commission in this matter, in the prior hearings, stated that any disturbance during foundations, footings, or even during construction or materials of steep slopes would require a variance?

Similar wording

i i don't understand the question okay i'll move on

Similar wording

mr langer a couple of your options uh showed hypothetical uh curb cuts and uh driveways

Similar wording

at along ridge avenue correct that's right um did you propose any such driveway or uh curb cut

Similar wording

along ridge avenue to either pendot or the philadelphia streets department no okay uh did

Similar wording

you hear the prior testimony from uh our witnesses the developers witnesses that is

Similar wording

that PennDOT and the Streets Department would not approve any curb cut or driveway along Ridge Avenue?

Similar wording

I do not recall that part of the testimony.

Similar wording

Okay, thank you.

Similar wording

I will quickly just ask you a couple questions.

Similar wording

about. So I'm going to share my screen.

Similar wording

Mr. Langer, can you see my screen? I believe I'm showing conceptual option number 370 units.

Similar wording

That's correct. Okay. And up in this top corner that I'm

Similar wording

circling right now with my cursor, you show a driveway.

Similar wording

uh circling right now with my cursor uh you show a driveway uh for potential parking

Similar wording

that's right okay now uh that driveway would actually disturb the steep slopes in that

Similar wording

corner of the property correct according to the topographical plan there is some slope there but

Similar wording

it's not above 25 percent. Have you analyzed the site survey or the existing conditions for this

Similar wording

project? I looked at the zoning drawing submitted by TAPCO. Okay and you're aware that there's

Similar wording

currently existing a driveway from back from the PHA development that exists essentially in the

Similar wording

location that you're showing now right there's a there's a small little driveway that goes in and

Similar wording

a small flat area now do you understand that that driveway is actually only half on uh the property

Similar wording

that is 4401 ridge and is actually half on property that is not subject of this project

Similar wording

um i i think uh i'm i'm not sure of the intimate details of exactly what's on or what's off

Similar wording

Okay. Now, I think we've already shown that in your options three and four here, and even option two, you are proposing development immediately abutting 25% grade or higher steep slopes. Is that correct?

Similar wording

uh yes um so in order to immediately there's a buffer there's a buffer but but in order to

Similar wording

immediately abut uh similar to the photo that's showing up here i think it's called cotton hill

Similar wording

there would need to be some kind of retaining wall or other uh shoring or foundation work

Similar wording

to prevent the steep slope from sliding.

Similar wording

Is that correct?

Similar wording

The intent would be not to provide

Similar wording

build retaining walls.

Similar wording

Okay.

Similar wording

Now, Mr. Langer, you testified

Similar wording

as to a determination of feasibility

Similar wording

with regard to this project, right?

Similar wording

as far as yes absolutely now feasibility necessarily depends on the price paid for

Similar wording

the land correct yes it does and this project this property was sold or are you aware that

Similar wording

this property was listed for sale at an open bidding by PHA yes okay and are you aware of

Similar wording

what the final purchase price was for this property?

Similar wording

I think so, but I wouldn't want to say if my memory served me 100% correct.

Similar wording

Understood, but that would obviously affect feasibility as you testified.

Similar wording

That's right.

Similar wording

Now, Mr. Langer, I've just clicked to show you a zoning map that was previously entered

Similar wording

in this matter um you have you see highlighted here this is the property 4401 ridge avenue

Similar wording

correct yeah and you understand that there's a a very large uh snake-like property behind us

Similar wording

that's also cmx3 between us and the hilltop uh project correct correct okay and uh this where

Similar wording

i'm showing the cursor right up here this is what you've been just you have described as the hilltop

Similar wording

project correct that's right and the zoning for that property is actually rm1 yes okay and the

Similar wording

property uh the two blocks over here with homes and again continuing over here on the other side

Similar wording

of palisage drive um that probably property is also zoned rm1 correct right and then you go down

Similar wording

to the what mr bonnie described as the penrose building uh senior building that's zone cmx2

Similar wording

that's right 2.5 sorry yes you're correct mr bonnie 2.5 um and and you're understanding that

Similar wording

the underlying zoning districts of RM1 and CMX 2.5 have widely disparate zoning characteristics.

Similar wording

widely disparate zoning characteristics in the code than CMX3, correct?

Similar wording

They have different limits.

Similar wording

Now, again, Mr. Langer, you testified with regard to 4442 and 4300,

Similar wording

these two projects over here, colloquially called the Howe and Grasso projects.

Similar wording

that's right and those are both cmx3 properties as well correct that's right okay and

Similar wording

getting to the end here but uh ultimately you or someone under you prepared uh this document

Similar wording

that's not labeled but it says the tapco is taller and more dense that's right all right

Similar wording

Now, beginning, you say a TAPCO at 4401 Ridge, the height is 92 feet 4 inches.

Similar wording

Mask, where you calculated that from?

Similar wording

From the documents presented to zoning on your documents.

Similar wording

uh would you uh disagree with me if i said that those documents actually reflect

Similar wording

a height at the highest point along the uh along the ridge line of uh 82 feet

Similar wording

uh we we can go look at the documents um but if you go up to uh the height of your parapets

Similar wording

um i believe there's a number in there um which states 92 feet four inches

Similar wording

i i will uh just disagree but move on but you know uh let's now mr mr langer if it's 88 feet

Similar wording

or 92 feet then uh mr langer i'm asking you questions right now you need to answer the

Similar wording

questions that i'm asking you um he's trying to answer with regard to the how 4442 ridge

Similar wording

uh project you show a height of 70 feet 10 inches correct right and that height is actually the

Similar wording

effective height along ridge avenue correct that is the effective height above average grade

Similar wording

but at ridge avenue you're talking about this project over here uh yes oh um and similarly

Similar wording

the grasso project the 92 foot 4 inches is actually the height of your building above

Similar wording

average grade it's on one of your documents um so mr langer i'm asking you the grasso project

Similar wording

at 4300 ridge is uh you have listed as 68 feet 9 inches that again is down along ridge avenue

Similar wording

correct with uh no steep slopes uh that's right okay and uh do you recall what the height of

Similar wording

the proposed project is along ridge avenue uh that that is considerably lower because

Similar wording

right there you're only i believe it's uh four stories above retail

Similar wording

okay so so the height here reflective against the the height shown here reflective against the ridge

Similar wording

and the two other projects on ridge are not measuring apples to apples they're actually

Similar wording

measuring a height significantly measured up along the uh slope as opposed to uh two slight

Similar wording

two um heights measured at grade along ridge avenue correct that's right this height actually

Similar wording

reflects the height opposite two-story homes okay now uh mr langer are you familiar with the size

Similar wording

of these three projects by square footage uh land land size of these three projects um

Similar wording

i would have to go to a cheat sheet uh to be able to speak accurately about square footage okay and

Similar wording

And this information is in the record already, but I will represent to you just for the purposes of moving forward, the Atapco project and our project is approximately 82,000 square feet.

Similar wording

The Howe project is approximately 31,000 square feet.

Similar wording

And the Grasso project is approximately 70,000 square feet.

Similar wording

um so would you disagree that the atapco project has a much larger land size than the other two

Similar wording

projects i'm sorry i can't attest to the data you just presented i don't have that in front of me

Similar wording

so i can't agree or disagree okay so where you show where you calculate total

Similar wording

Okay, so where you show, where you calculate total number of units, that is not adjusting for any kind of density per square foot or the number of square feet on the site for the units provided, correct?

Similar wording

We'll be right back.

Similar wording

No, but I do know you can do more and you can do less.

Similar wording

Understood, but you would agree with me, correct?

Similar wording

that if you put a hundred units on a small property that density would impact the neighborhood

Similar wording

differently than a hundred units on a very large property correct that's right okay thank you um

Similar wording

and now here this uh chart right here references um you know page from the lower northwest district

Similar wording

plan, correct? 12-9-2014? Yes. Are you aware that this property, and actually the properties

Similar wording

across the street, were upzoned from CMX 2.5 to CMX 3 in 2016? There was the process that produced

Similar wording

that result, yes. Okay, so there was a public process to bring about the Lower Northwest

Similar wording

district plan and then actually two years later there was a process to upzone the project

Similar wording

uh the property rather um to cmx3 that's right okay now uh it's been previously testified to by

Similar wording

uh the efcc president both the howe and grasso projects were supported by efcc correct

Similar wording

that's right okay um so is is this just a first come first served

Similar wording

issue that the neighborhood is now feeling like it's agreed to too many units objection

Similar wording

he can't i don't think he's a he's the right person to ask for that he can't answer on behalf

Similar wording

of all the community respectively he's here not testifying as mr hillary langer individually he's

Similar wording

here testifying as the head of the Zoning Board for EFCC, the community.

Similar wording

Mr. Langer, can you answer that question?

Similar wording

Sorry, with all the interjections before that, I can't remember the specifics of the question,

Similar wording

but is it first come, first serve? Absolutely not. The way we're looking at this site is that

Similar wording

it's adjacent to two-story homes and neighbors who will be directly affected by this development.

Similar wording

It's a different site, it's a different situation than the Grasso or the Hauer Projects down there

Similar wording

on Kelly. Okay. It's on its own merits. Understood. I have no further questions,

Similar wording

chairman all right uh here's the game plan gentlemen it is now 12 24. uh mr bonnie i think

Similar wording

we were much more generous than we anticipated with you uh earlier i mean that respectfully

Similar wording

well beyond the one hour i understand you may have two witnesses left well one that they're

Similar wording

but they're both pretty short one is extremely short okay and what I was going to want to say

Similar wording

next is there may be other people from the community want to testify so uh without any

Similar wording

objection Mr. Whalen we will go to Mr. Bonney's witnesses uh no chair I would love to do that

Similar wording

because by all means we this must this project must finish today exactly right thank you Mr.

Similar wording

Bonney my next witness is Raymond Adams it was going to be extremely brief can you raise your

Similar wording

hand Mr. Adams. Mr. Adams please identify yourself for the records spell your last name and I will

Similar wording

swear you win. Do you see him Ms. Hunkett? Yeah he's at I see his name here he is. Mr. Adams

Similar wording

Spell your full name and I'll swear you win.

Similar wording

Okay, my name is Raymond Adams.

Similar wording

Mr. Adams, Mr. Adams, there's an echo.

Similar wording

Do you have another device on?

Similar wording

I know I don't, but I do have it here.

Similar wording

Maybe I'll take that off and just let me turn that off and see if that helps.

Similar wording

Okay, can you hear me, is it better now?

Similar wording

Right now again.

Similar wording

Hello?

Similar wording

Is it better now?

Similar wording

Is it better now?

Similar wording

A little bit better, yeah.

Similar wording

A little bit better, yeah.

Similar wording

Spell your name.

Similar wording

Okay.

Similar wording

My name is Raymond Adams.

Similar wording

That's R-A-Y-M-O-N-D Adams, A-D-A-M-S.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

Please proceed.