Philadelphia Zoning Board of Adjustment (ZBA)Aug 12, 20203h 45m

consideration this situation and rule favorably in this variance request. I'm

Similar wording

happy to answer any questions. I'm going to scroll back down to the plans as so

Similar wording

it's easier to take a look at them again if needed.

Similar wording

jen just go back over your opening remarks your client purchased the building correct me if i'm

Similar wording

wrong in this as-is condition or he let me clarify my client hired um a contractor builder to build

Similar wording

the original building uh based on plans that were approved at the time which is similar in height

Similar wording

I'll go back to that actually that portion because so at the time the

Similar wording

building was originally built with my client it was approved through a

Similar wording

different architect and it was approved for the same height about 71 feet and

Similar wording

it was supposed to be a five-story structure but if you look at the plans

Similar wording

even submitted then this is the view of this was the front facade view that was

Similar wording

presented with those plans you can see that even though it looks like a seven

Similar wording

story structure it was supposed to have five floors with some with a tall

Similar wording

second-story structure because it's a commercial type building for the first

Similar wording

few floors what was actually built the contractor put in this floor and that

Similar wording

floor after the fact of the approval. This was caught when the city came in and started doing

Similar wording

inspections so the construction didn't really get totally completed and that's when it's all

Similar wording

stopped and it's been in litigation to kind of fix these issues since. As you can see the building

Similar wording

itself is still under construction. There was a there was a bay that's placed in that has to be

Similar wording

removed so the facade will eventually change completely again. I'm going to

Similar wording

reduce the size here so we can see the pictures clearly. So this is right off

Similar wording

of one of the parts of Arch Street that is very active. I'm sorry I just realized

Similar wording

what I'm doing wrong here. So as you can see the building is partially

Similar wording

constructed it's not complete so this has been a multi-year saga to try to get this building built

Similar wording

too cold and completed and filled so this because the way this building is built because it was

Similar wording

built as it's essentially a wooden structure despite the height the structural integrity of

Similar wording

the weight that is being pressed onto the building requires the additional bracing at those floor

Similar wording

levels and that's why the architect, the current architect, wanted to keep what is essentially

Similar wording

mezzanineum type flooring level to keep that structure. So this is how it looks from a design

Similar wording

standpoint. They're keeping some of the flooring as mezzanineum pieces. This is exactly what is

Similar wording

what is causing the additional floor area ratio in this building.

Similar wording

causing the additional floor area ratio in this building.

Similar wording

But it is also important to make sure the walls are pressed out and stays in its current condition.

Similar wording

This will prevent the need for us to, again, look at the engineering and potentially further redesign the building.

Similar wording

Was there a cease order issue?

Similar wording

Yes, there was.

Similar wording

And is it still in effect?

Similar wording

It is, it is, the cease is not in effect in the sense that it's, the court is supervising the lifting of any violations that exist on the property. So there's been ongoing work to make sure it's up to fire code, building code, but zoning is a critical component of moving forward because without the floor area ratio being correct, further construction is not permitted at this point.

Similar wording

And explain to me, explain to the board again, what PCDC's objection was?

Similar wording

PCDC felt that the, when the building was constructed, I'll go back to their letter.

Similar wording

so if you look at PCDC so PCDC actually approved this original building back in 2013 and my client

Similar wording

at that time proposed the building with the prior permit and plan the board I referenced to the

Similar wording

board earlier it was not constructed according to the drawing so the

Similar wording

contractor the gentleman who did the construction is well known in Chinatown

Similar wording

Mr. Wren and he's the one that took the entire project and built the building

Similar wording

but of course he did things that were not within the plans yes it's still my

Similar wording

client's building yes it was my client's project but my client never was involved that directly

Similar wording

with the project until the city came and inspected because Mr. Wren reported to him regularly saying

Similar wording

everything's fine you're doing great this is a multi-million dollar project for my client

Similar wording

so at this point what what he's really looking for is to make sure that he can complete this

Similar wording

project at this point even though he has probably invested another almost the same amount of money

Similar wording

that he originally did to keep this project going. As you can see PCDC primarily feels that

Similar wording

there's no hardship because my client could have built and completed the building as approved

Similar wording

but we did explain to PCDC that the structure of the building is already up. It's not something

Similar wording

that if you want to take it back to that plan we would have to demolish the

Similar wording

building at this point so it's a complete reconstruction for basically a

Similar wording

two thousand square two thousand eight hundred square foot difference in floor

Similar wording

area coverage within the building so if the board were to approve this would we

Similar wording

be approving something of that is not yet still in compliance with the

Similar wording

building code it well if the the plans that is being approved by the board are

Similar wording

the same plans that are being presented to the common police court through the

Similar wording

law department so law department and it is involved with this project heavily

Similar wording

at this point so if the board approved these specific plans and requests that

Similar wording

this be the plans that are built all further inspections and court reviews

Similar wording

would follow that particular plan.

Similar wording

Courts are relying on the zoning board?

Similar wording

Am I misunderstanding that?

Similar wording

Because it sounds to me like there's still an open-ended question here.

Similar wording

Regardless of what we do, that the court may,

Similar wording

obviously the court has more power than we do,

Similar wording

that they may overrule what is being requested of this board.

Similar wording

This is Sharon Stoletta. May I interrupt for a minute?

Similar wording

Sure, please.

Similar wording

Chair, the building permits can't be issued until there is a zoning permit. So you would be the first step.

Similar wording

I get that. But unless I'm hearing it wrong, they're already in court for building code violations.

Similar wording

are they one in the same or are they exclusive of each other meaning are is

Similar wording

the what what would be permitted under the variance is that does that become

Similar wording

questionable in terms of what the code would allow I don't know if that makes

Similar wording

in terms of what the code would allow I don't know if that makes sense I'm

Similar wording

obviously I'm not a lawyer I'm just trying to it seems to be very convoluted

Similar wording

here may what the in my client to do is to comply with if you're breaking up

Similar wording

I'm sorry what the court is asking my client to do is to comply with L&I

Similar wording

requirements, which involves building permits and zoning use permits. In order for the court to

Similar wording

approve that the violations can be complied and lifted, L&I has to accept a zoning design

Similar wording

approval as well as issue building permits based on it and then inspect the actual construction

Similar wording

itself. So do we know if they would approve this building design? Well, they asked us to make this

Similar wording

application l and i actually asked us to and all the dimensional requirements that are in this

Similar wording

are what l and i had suggested no the requirements are what the architect after reviewing what's

Similar wording

existing and what can be done to maintain the structure proposed

Similar wording

god did you have any more to anything else to add

Similar wording

no it's nothing else mr chin explained it

Similar wording

uh question from the board no no no no okay is there anyone else here who wishes to testify

Similar wording

in this matter if you if so please raise your hand at this time uh my client is uh here with

Similar wording

us, I believe. I have a Yu Wu. Yes, can you hear me? Yes, ma'am. Please spell your name for the

Similar wording

stenographer. My name is Yue Wu, Y-U-E-W-U, and I represent RCO, Philadelphia Chinatown Development

Similar wording

Corporation. Right, and do you swear and affirm to tell the truth, the whole truth, and nothing

Similar wording

about the truth? Yes, I do. Thank you. Please proceed. Thank you. So I'm here to represent

Similar wording

the impacted RCO, Philadelphia Chinatown Development Corporation. In 2013, we approved

Similar wording

the owner's proposal to build a five-story mixed-use building. But after the zoning violence

Similar wording

was granted, the building was not constructed as proposed. It was built illegally seven stories

Similar wording

and the building was built with wood frame which is not allowed for buildings more than five stories.

Similar wording

So after the owner presented the revised plan to our RCO committee, we believe it didn't

Similar wording

demonstrate the unnecessary hardship and the applicant could have built and completed the

Similar wording

building according to what they proposed in 2013.

Similar wording

And the attorney showed original drawings to us today.

Similar wording

And during the public meeting, we requested,

Similar wording

the RCO committee requested the original drawings

Similar wording

to be presented.

Similar wording

But we never received the original drawings.

Similar wording

and we decided that the this kind of behavior was that a very bad example in our neighborhood in our

Similar wording

community and in the city that if someone the developer can build a illegal building

Similar wording

and then get the approval from zoning board and other city departments just to get away

Similar wording

from the following the rules it will be really bad for future development in the

Similar wording

city and granting the zoning variance for this project is unfair for other

Similar wording

developers who actually follow the zoning rules and regulations. So PCDC's

Similar wording

RCO does not support this kind of behavior. Additionally, we find recently

Similar wording

that there were construction activities going on in this building.

Similar wording

And if I can, I can show some photos, but I don't see option for sharing screen.

Similar wording

Can someone help me to share the screen?

Similar wording

I think it will help you, I'm sure.

Similar wording

Sorry?

Similar wording

Maybe Mr. Oh, I see it now.

Similar wording

I've stopped sharing. I don't know if it would interfere with the...

Similar wording

I've stopped sharing. I don't know if it would interfere with the

Similar wording

Yeah, I can do that now. So this is photo we took in late July, around July 27th. This

Similar wording

is a building we were discussing right now and there were construction activities going

Similar wording

on without zoning or building permits visible to the public you can see there's no building

Similar wording

or zoning permit and there's a video from the back of the building during that construction

Similar wording

activities going on if you if you see the cover outside and again this building

Similar wording

has been instructed to be made safe pending final design so some of we had

Similar wording

actually uh how do you build a building prior to getting final design as well i'm not sure

Similar wording

and you also mentioned that i think you said that a five-story building would have been permissible

Similar wording

and that was part of the original plan original plan had a 71 um building so the building on the

Similar wording

original plan was essentially the size as this one is it okay for a five story five floors right

Similar wording

five floors correct inside so when you you say that this wasn't this isn't approved they'd have

Similar wording

to tear the entire building down because couldn't they just take off the top two two levels or

Similar wording

whatever levels it is to get it back down to compliance without having to disturb the entire

Similar wording

building well it would mr chairman you are correct you just have to take off the two floors to get

Similar wording

the SAR down to 500 instead of doing mesoline right and if I can interrupt for a minute this

Similar wording

is Sharon Saleta again Mr. Jin may have already explained this but the only variance required in

Similar wording

this case is for the floor area ratio not the height not the use it's one dimensional refusal

Similar wording

permit it is a 500 percent floor area ratio as um proposed now it's 590.1 oh if he reduced if he

Similar wording

reduced the by the the nine nine was a 590 got it back to the five

Similar wording

i mean tom i'm i'm i guess i'm asking you tom this so there there's a

Similar wording

What he's trying to do is do mezzolines to reduce the floor area

Similar wording

instead of taking the two floors off to reduce the floor area.

Similar wording

Is it reconfiguration of the interior at the upper floors?

Similar wording

Is that what we're saying?

Similar wording

That's what he's trying to do is reconfigure the interior

Similar wording

instead of taking the exterior two floors off.

Similar wording

so if we look at this um this design uh side view uh if we were so what we're doing is you

Similar wording

have first floor there's a current second floor that's going to be removed so there's one tall

Similar wording

second floor and then there's second floor mezzanine that would have been the third floor

Similar wording

then third fourth fifth floor in mezzanine i understand the board saying what if you just

Similar wording

take floors off by doing believe and this is a discussion again I'm not the

Similar wording

architect expert here but I believe it's gonna be a far greater burden on my

Similar wording

client to take two complete floors off and then reconfigure all the floors

Similar wording

below then to have they because all these floors all seven floors are

Similar wording

currently in so what Jim with all due respect didn't your client cause this

Similar wording

probably this is it he caused the problem he or his architect somebody

Similar wording

caused it well the builder the builder caused the the actual issue here by

Similar wording

building it that way the builder basically built without following plans

Similar wording

my client actually obtained from the architect so that is that is Brad with

Similar wording

the existing building this is a again this is a dimensional variance for about

Similar wording

2,000 plus square foot of floor area. I think the 2,000 plus what is the plus? Well it's about

Similar wording

2,800 square feet. That's almost 3,000 square feet. I'll go with 3,000. So about 3,000 square

Similar wording

foot. This building has over 15,000 square foot total of floor area due to the size of the lot

Similar wording

in the side of the building. When it's a dimensional variance like this, the

Similar wording

dimensional variants like this, the ultimate additional cost to my client in this situation

Similar wording

ultimate additional cost to my client

Similar wording

is in itself a hardship that should be considered. I understand that, but he caused this problem.

Similar wording

That's what I'm saying. I mean, look, you're doing your job for your client. I get it.

Similar wording

But to make it like, you know, we got to be sympathetic towards your client. He caused this

Similar wording

problem in the first place. If he would have stuck to what he should have been doing when it was first

Similar wording

approved in 2013 we probably wouldn't we wouldn't be here today I I think it

Similar wording

might be worthwhile to hear from my client as to what happened is he gonna

Similar wording

tell us anything different I think he can explain a little better his

Similar wording

relationship and how this construction happened without that we ended up with

Similar wording

this building that he because I know the board saying my client is the one that

Similar wording

built the building because he's the owner but ultimately he was being kind of bamboozled as

Similar wording

well by the contractor who's charging him additional money on this building saying I'm

Similar wording

building something for you I'm building something for you but actually what he was doing is building

Similar wording

something that was completely off from the plans. I sympathize with that but I don't think that

Similar wording

we didn't create the hardship the community didn't create the hardship created by his

Similar wording

builder and he's paying him and i can't believe that he had no knowledge of what was taking place

Similar wording

i find that very hard to believe in a building of this size but that's just my opinion so i will

Similar wording

answer any questions from the board no no no yes in my opinion it would be more costly

Similar wording

to reconfigure the interior

Similar wording

to the mezzolines

Similar wording

than to just take off the roof

Similar wording

and the two floors.

Similar wording

That was my first question.

Similar wording

I figured that would be easier.

Similar wording

But anyway, all right.

Similar wording

Appreciate that, Tom.

Similar wording

Anyone else who wishes

Similar wording

to testify on this matter,

Similar wording

please raise your hand

Similar wording

if you haven't already done so.

Similar wording

We have Kenny.

Similar wording