civus

Property profile

1126A-36 ARCH ST

OPA 78100571060 linked records

Different people can share a name and appear on the same profile.

About these name links

Actor profiles are grouped by kind and normalized name. Two people with the same name may appear together in this first version.

Zoned CMX-5Commercial/Commercial Mixed-Use
Owner
PENNSYLVANIA CONVENTION
ZIP code
19107
Year built
1892
Market value
$9,365,600

Historic

Designation status and decisions from the historic property record.

63 decisions
Historic address
1115-31 MARKET STREET READING TERMINAL MARKET (12TH ARCH FILBERT STREET FACADES), GERMANTOWN AVENUE READING DEPOT, 1115-41 MARKET STREET (READING TERMINAL MARKET), READING TERMINAL, READING RAILROAD TERMINAL TRAINSHED 1115-1141 MARKET STREET REAR, 1115-1141 MARKET STREET READING TERMINAL MARKET (DOWN HOME DINER SIGN - 12TH AND FILBERT STREETS), 1115-1141 MARKET STREET READING TERMINAL MARKET (MARKET SIGNAGE - DOWN HOME DINER SIGN), READING TERMINAL AT 12TH AND MARKET STREETS, READING TERMINAL 12TH AND MARKET STREETS, READING RAILROAD TERMINAL 1115-1141 MARKET STREET, 1115-1141 MARKET STREET READING TERMINAL MARKET, READING TERMINAL MARKET - NEW STOREFRONT 12TH STREET FACADE, 1115-31 MARKET STREET READING TERMINAL MARKET (DOCK STREET BREWERY PUB SIGNAGE), READING TERMINAL TRAINSHED 1115-1141 MARKET STREET, READING TERMINAL TRAINSHED 1115-1141 MARKET STREET - INTERIOR, READING TERMINAL MARKET REAR OF 1115-1141 MARKET STREET - MCDOWELL ASSOCIATES WORK, READING TERMINAL TRAINSHED 1115-1141 MARKET STREET - WESTERN FACADE STOREFRONT, READING TERMINAL TRAIN SHED, READING TERMINAL MARKET REAR OF 1115-1141 MARKET STREET - SAXON/CAPERS WORK, READING RAILROAD TERMINAL TRAINSHED 1115-1141 MARKET STREET, 1126-36 ARCH STREET (READING TERMINAL MARKET), READING TERMINAL TRAINSHED 1115-1141 MARKET STREET - BIRD NETTING, 1115-1141 MARKET STREET READING TERMINAL MARKET (MARKET LIGHTS - 12TH STREET AND FILBERT STREET FACADES), 1126-36 ARCH STREET, 1115-1141 MARKET STREET THE READING TERMINAL MARKET, READING TERMINAL MARKET REAR OF 1115-1141 MARKET STREET, READING TERMINAL MARKET - REAR WALL ARCH STREET FACADE, READING TERMINAL MARKET, 1113-31 MARKET STREET READING TERMINAL MARKET HEADHOUSE, READING TERMINAL MARKET 12TH AND FILBERT STREETS, READING TERMINAL MARKET 12TH & FILBERT STREETS, READING TERMINAL TRAINSHED, READING TERMINAL TRAINSHED PENNSYLVANIA CONVENTION CENTER, 12TH & ARCH STREET (READING TERMINAL MARKET), 1115-1121 MARKET STREET (READING TERMINAL), 1126-1136 ARCH STREET READING TERMINAL MARKET, READING TERMINAL TRAINSHED 1115-1141 MARKET STREET - ARCH STREET REAR WALL, READING TERMINAL SOUTHWEST CORNER OF HEADHOUSE, READING TERMINAL MARKET REAR OF 1115-1141 MARKET STREET - KELLY/MAIELLO WORK, READING TERMINAL/CONVENTION CENTER/TRAIN SHED, READING TERMINAL 1115-1141 MARKET STREET, DOWN HOME DINER (READING TERMINAL MARKET LOCATION), READING TERMINAL PENNSYLVANIA CONVENTION CENTER, READING TERMINAL TRAINSHED - BIRD NETTING 1115-1141 MARKET STREET, READING TERMINAL TRAIN SHED - ARCH STREET WALL, 1115-45 MARKET STREET READING TERMINAL MARKET
Year built
1892
Building description
STORE 2 STY MASONRY
Owner
PENNSYLVANIA CONVENTION / CENTER AUTHORITY

Source links open full minutes. Exact passages have not been matched to these records.

  1. Demolition review

    Historical Commission

    Recorded outcomeNo decision

    Recorded conditions

    Request to remove from National Register by Housing Director due to Market East Project conflict; Commission to consult with Advisory Council

    Vote tally
    unanimous support for helping city
    Criteria cited
    National Register of Historic Places
    Votes and testimony

    Testimony

    • Hillel Levinsonoppose, person
  2. Other

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Commission to send letter to City Planning Commission proposing retention for bus terminal use, Structure requires underpinning during Center City Commuter Connection Tunnel construction

    Criteria cited
    Historic retentionAdaptive use as bus terminal
  3. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Working drawings required for committee and commission final review before final approval

  4. Certification

    Historical Commission

    Recorded outcomeNo decision

    Recorded conditions

    trained and head house

    Prior meeting reference: Committee on Certification recommendation

  5. Nomination

    Committee on Historic Designation

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Committee authorized historian to negotiate with Market Street East Corporation and others to persuade Reading Company to accept certification

    Prior meeting reference: Commission received Reading Company reply on 20 June 1980 to its letter of 28 May 1980; referred to Committee at October Commission meeting

    Vote tally
    Unanimous vote to authorize historian to begin negotiations with Market Street East Corporation and others
  6. Nomination

    Historical Commission

    Recorded outcomeNo decision

    Recorded conditions

    Commission to begin negotiations with Market Street East Corporation and others to persuade Reading Company to accept certification

    Prior meeting reference: 2 October 1980

    Criteria cited
    Historic significance
  7. Nomination

    Historical Commission

    Recorded outcomeApproved

    Prior meeting reference: Prior objection to certification withdrawn

    Vote tally
    motion carried
    Votes and testimony

    Votes

    • Edward Pinkowskiyes

    Testimony

    • Reading Companysupport, organization
  8. Demolition review

    Architectural Committee

    Recorded outcomeDeferred

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Staff to explore possibility of structure's reuse; if feasible, request extension for compliance with Department of Licenses and Inspections violation

    Criteria cited
    Oldest railroad station in the cityReuse potential
  9. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Phase 3 of rehabilitation project; includes restoration of Headhouse and remainder of exterior and ground floor areas owned by Reading Company only; modified cornice with 2.5-foot projection instead of original 4-foot projection; fire escape removal scheduled; new wood storefronts on Market Street; all existing wood windows, frames, sash, sills and interior trim to be retained and restored; interior storm windows to be installed on second through ninth floors. Southwest corner of project to be restudied and revised construction details to be submitted for further review.

    Prior meeting reference: Third phase of rehabilitation project

    Vote tally
    unanimous
    Criteria cited
    Headhouse restorationExterior masonry restorationHistoric cornice designWindow preservation
    Votes and testimony

    Votes

    • David Hollenbergabstain
    • John Dickeyyes
    • Patricia Siemiontkowskiyes
    • Penelope H. Batcheleryes
    • Richard Tyleryes

    Testimony

    • Eugenia Warnocksupport, person
    • Stephen C. Parksupport, person
  10. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Scheme B approved with flat transom design

    Prior meeting reference: 12 June 1985

    Vote tally
    unanimous
    Criteria cited
    Scale compatibilityArchitectural design standards
    Votes and testimony

    Votes

    • David Hollenbergabstain
  11. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Phase 1 only: installation of air conditioning system with vents above doors

    Vote tally
    Approved; David Hollenberg abstained
    Votes and testimony

    Votes

    • David Hollenbergabstain

    Testimony

    • Daniel McCoubreysupport, person
    • David O'Neillsupport, person
    • Steven Wiesenthalsupport, person
    • William Beckersupport, person
  12. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Prior meeting reference: Architectural Committee Meeting, 8 October 1987

    Vote tally
    Unanimous
  13. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    expansion to south side of Filbert Street; four fire stairs to intrude into four corners of market area; service dock in southeast corner; tenants relocated during construction then returned to original stalls or alternative stall; retention of special character of market; iron columns require structural reinforcement and fireproofing

    Prior meeting reference: 21 November 1988 Architectural Committee Report

    Vote tally
    Commission voted to approve in concept
    Votes and testimony

    Testimony

    • David O'Neiloppose, person
  14. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Submission of additional information and materials required before final approval; introduction of ballroom and function rooms within north end of trainshed; establishment of visual link between headhouse and trainshed; introduction of four fire stairs and service area within market area north of Filbert Street; reconstruction of central skylight and clerestories with maximization of skylight area; rehabilitation of exterior of trainshed and structural stabilization of deteriorated building fabric; ceiling of ballroom kept away from trainshed arches; approximately four bays of original trainshed remain completely open on interior; south wall of shed reopened to original appearance; north wall of trainshed remain glazed; link between headhouse and train shed opened for visual accessibility; market expanded to south side of Filbert Street; tenants relocated during construction

    Prior meeting reference: 21 November 1988 Architectural Committee Report

    Vote tally
    Commission voted to approve in concept all items
    Criteria cited
    Locally designated structureNational Historic LandmarkHistoric rehabilitation of trainshed structureStructural reinforcement of iron columnsRestoration of masonry walls
    Votes and testimony

    Testimony

    • David O'Neiloppose, person
    • Kenneth Finkelneutral, person
  15. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Reconsideration of circular form of facade and floor pattern to develop less centrally focused design, Possibility of turning floor pattern design over to an artist, Periodic updates on design development

    Prior meeting reference: December 1988 Historical Commission meeting - five items approved in concept

    Criteria cited
    Preservation of grand court as forecourt to convention facilityIntroduction of two-level infill structure (meeting rooms and banquet facilities on first floor, ballroom on second floor)Restoration of glass wall between link structure and shedRestoration of caveoles and spiral stairsIntroduction of pylon structures approximately eighteen feet tall to distribute air and lightingFloor pattern to simulate railroad tracks using marble and stainless steelStairs, escalators, waterfalls, and landscape treatment on infill structure facadeGlass vertical division between top of ballroom and underside of shed for air and sound barrierReuse and restoration of board sheathing and truss workSystem of shields to control light from central skylightClerestories to be glazed with opaque glass
  16. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    1) Placement of exhaust fans behind parapet on west side of train shed; 2) Retention and restoration of the original storefront in the southwest corner of the Market facing Filbert Street; 3) Placement of the stairwell proposed for the southwest quadrant in a location which will not intrude upon the 12th Street entrance or destroy the original storefront on Filbert Street; 4) Exploration of alternatives for fire protection to the proposed wrapping of the iron columns and beams.

    Criteria cited
    Fire suppressionCode complianceStorefront preservationExhaust system placementIron column and beam protection
    Votes and testimony

    Testimony

    • Brian W. Yachyshensupport, person
    • Charles W. Nearonsupport, person
    • Vincent Maiellosupport, person
  17. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Placement of exhaust fans behind parapet on west side of train shed; retention and restoration of original storefront in southwest corner facing Filbert Street; placement of stairwell in southwest quadrant so as not to intrude upon 12th Street entrance or destroy original storefront on Filbert Street; exploration of fire protection alternatives to wrapping iron columns and beams.

    Prior meeting reference: Architectural Committee meeting, 30 November 1989

    Vote tally
    carried
    Votes and testimony

    Testimony

    • Kelly/Maiello Architectsneutral, organization
  18. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Design entry to bridge align with meeting rail of Terminal sash; underside of bridge not fall below top of granite on Terminal; flat roof preferred over vaulted roof; special care to materials and design of Terminal side of bridge; glazing placement to prevent pigeon roosting; consideration of butt glazing

    Prior meeting reference: Part of ongoing conceptual design review; Architectural Committee of Art Commission considered design favorably

    Criteria cited
    Location determined by City Council ordinanceAir rights transferDesign simplicityPreservation of viewsRelationship to existing Terminal
    Votes and testimony

    Testimony

    • Avrum Kantorsupport, person
    • Craig Sheltersupport, person
    • Edward Palisocsupport, person
    • Emmanuel Kellysupport, person
    • Eric Rahesupport, person
    • James Cuoratosupport, person
    • John Bowersupport, person
    • John Romanosupport, person
  19. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Approval in concept with design recommendations: retain top gabled light monitor ('doghouse'); skylight to be uniform width; allow natural light through lower roof clerestories; north elevation historic glass wall to replicate south elevation; former train entrance level to use black panels to appear as opening; south elevation to be historically restored; ballroom facade mass reduced and curvature added; reduce size and number of false ceiling elements for maximum shed view; elevator pylons to reflect function; fountains in renderings to be deleted; retain existing openings between trainshed and headhouse; discourage creation of second arch; complete palette of finishes and colors to be presented at future meeting; measured drawings to be submitted to HABS; architect to consult Eric DeLone; interior roof trusses need not replicate original black; exterior grey band demarcation of trusses discouraged pending sample review; goose-neck ducts for SEPTA and small ventilation units for Market commended

    Prior meeting reference: 14 December 1988 conceptual approval; November 1989 conceptual approval for Reading Terminal Market; Report of Architectural Committee, 25 April 1991

    Criteria cited
    Preservation of open structural spansVisibility of historic fabricNational Historic Landmark status
    Votes and testimony

    Testimony

    • Hyman Myersneutral, person
    • Pennsylvania Convention Center Authoritysupport, organization
    • Thomas W. Ventulett IIIsupport, person
  20. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Restoration of yellow brick and cast-iron components, Restoration of coping and existing ornament, Wooden sash and frames to be painted dark and light brown respectively, Missing finials to be replaced in fiberglass with faux-copper finish if budget available, North wall to appear similar to south wall, Exterior colors and treatments approved, Interior marble floor and terraces for Grand Hall submitted, New pine planks to be stained to match older ones, Committee deferred recommendation on truss color treatment and requested samples comparing black versus beige alternatives

    Prior meeting reference: December 1988, November 1989, May 1991

    Criteria cited
    National Historic Landmark statusHistoric color and treatment analysis
    Votes and testimony

    Testimony

    • Hyman Myerssupport, person
    • Nan Guttermansupport, person
    • Thomas Ventulettsupport, person
  21. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Committee voted to recommend approval of revised design; design revised to address previous concerns regarding roof structure and junction with Terminal

    Prior meeting reference: 1990 approval in concept

    Vote tally
    no specific vote tally recorded
    Criteria cited
    Pedestrian bridge designStructural and architectural characterMeeting with TerminalCast stone matching terra cottaArch retained in roof design
    Votes and testimony

    Testimony

    • Vincent Maiellosupport, person
    • William Cornelloppose, person
  22. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    connection with Terminal must be carefully designed, revised design with grey-painted metal tube and green-tinted glass

    Prior meeting reference: previous approval in concept by Kelly/Maiello Architects

    Vote tally
    unanimous
    Criteria cited
    Design qualityIntegration with historic structureReview by design authorities
    Votes and testimony

    Votes

    • David Brownleeyes
    • David Hollenbergyes
    • David Wismeryes
    • Edward A. Montgomery, Jr.yes
    • Jason Nathanyes
    • Reverend William D. Thompsonyes
    • Stephanie G. Wolfyes
    • William Brownyes
  23. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Job specifications enumerated in architects' letter of 16 December 1991 shall be incorporated into the record, Comprehensive key illustrating scope of work in the Market to be provided, Review by Pennsylvania Bureau for Historic Preservation, Coordination with Health Department regarding health code concerns

    Criteria cited
    Historic fabric preservationDesign compatibility with historic market configurationCity Council ordinance granting Historical Commission authority over Convention Center improvements
    Votes and testimony

    Testimony

    • William A. Kingsleysupport, person
  24. Informational

    Historical Commission

    Recorded outcomeNo decision

    Recorded conditions

    architects returning to drawing board; revised plans and further information to be submitted to Commission and other agencies

    Criteria cited
    Bids significantly over budget
    Votes and testimony

    Testimony

    • James Cuoratoneutral, person
  25. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    revision of plans to preserve historic fabric while accommodating merchants' interests in changing stalls

    Prior meeting reference: Architectural Committee meeting held 26 December 1991

    Vote tally
    unanimous
    Criteria cited
    Preservation of historic fabricMerchants' interests
    Votes and testimony

    Votes

    • David Brownleeyes
    • David Hollenbergyes
    • Edward A. Montgomery, Jr.yes
    • Jason Nathanyes

    Testimony

    • James Cuoratosupport, person
    • Mark Howellneutral, organization
    • Randal Baronneutral, person
    • Richard Tylerneutral, person
    • William Kingsleysupport, person
  26. Informational

    Historical Commission

    Recorded outcomeNo decision

    Recorded conditions

    plans to be reviewed by staff and presented to Architectural Committee

    Criteria cited
    Conformance with previously approved plans
    Votes and testimony

    Testimony

    • Richard Tylerneutral, person
    • Scott Wildsoppose, person
  27. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Approval incorporating all preceding comments and specific recommendations: shelving and bean bins at Margerum's rebuilt in wood; backboard and counters from Godshall's moved and reinstalled intact at New Moyer's stand; Down Home Diner exterior walls faced with enamel-faced metal panels; non-historic stalls rebuilt using plastic laminate; detailed review of non-historic features delegated to staff

    Criteria cited
    Historic preservationMaintaining eclectic mix of historic features
    Votes and testimony

    Testimony

    • Nathan Saltzsupport, person
  28. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Approval contingent on: staff review of proposed brick to match 12th Street wall; historically appropriate lettering at all sign locations; restoration of wall south of Filbert Street to replicate original as seen on north side

    Prior meeting reference: Previously approved some plans for this project

    Criteria cited
    Historic preservationMarket operations
    Votes and testimony

    Testimony

    • Vincent Maiellosupport, person
  29. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Approval contingent on: consultation with individual merchants regarding proposed color and pattern schemes; use of white as field color for patterns; toothing together brick at joints to reduce contrast between old and new materials; replacement of ocular windows with row of transom lights on new mezzanine above Fisher's Treats

    Criteria cited
    Historic preservationStall reconstruction standards
    Votes and testimony

    Testimony

    • Mary Ann Duffysupport, person
    • William McDowellsupport, person
  30. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Revised lighting and audio grid for ballroom, Glazing of south wall of ballroom and space above it with preference for soffit solution under truss with glazing behind if feasible and within budget, Removal of SEPTA ducts and louvers from Twelfth Street elevation and restoration of Twelfth Street facade, Glazing of vertical clerestory of the monitor (dog house) above Grand Hall

    Prior meeting reference: Multiple previous submissions referenced regarding ballroom treatment, first scheme with ceiling affording view of truss system and glass wall, revised scheme with solid ceiling and solid wall subsequently recommended to have glass wall instead

  31. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Kelly/Maiello: staff approval of proposed brick for exterior facade work; historically appropriate sign lettering throughout. McDowell Associates: consult merchants on color/pattern schemes; use white tile field on non-historic stalls; tooth new brick flooring to reduce contrast; replace proposed octagonal windows with row of transom lights. Saxon/Capers: detailed review of non-historic features delegated to staff; historically appropriate sign lettering throughout. All firms: use historically appropriate sign lettering in all locations.

    Prior meeting reference: Architectural Committee meeting, 29 April 1992; prior Commission approvals of some plans

    Vote tally
    Unanimous
    Criteria cited
    Preservation of Philadelphia landmarkRetention of historic fabricAvoidance of excessive standardization
    Votes and testimony

    Votes

    • Barbara Kaplanyes
    • David Brownleeyes
    • James Cuoratoyes
    • Louis Einhornyes
    • Scott Wildsyes
    • Stephanie G. Wolfyes
    • Wayne S. Spiloveyes
    • William Brownyes
    • William Candeloriyes

    Testimony

    • James Cuoratosupport, person
    • Reading Terminal Market Merchants' Associationsupport, organization
  32. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Simplified lighting/sound grid for ballroom ceiling; open view to shed trusses; sound/environment control glass wall at south end of ballroom; removal of SEPTA ductwork and louvers from Twelfth Street elevation with restoration of that zone; glazing of vertical clerestory of upper monitor (dog house) above Grand Hall

    Prior meeting reference: Special Meeting of the Architectural Committee, 8 June 1992; prior Commission approvals of some plans

    Vote tally
    Unanimous
    Criteria cited
    Preservation of historic shed trusses and roofRestoration of Twelfth Street elevation
    Votes and testimony

    Votes

    • Barbara Kaplanyes
    • David Brownleeyes
    • James Cuoratoyes
    • Louis Einhornyes
    • Scott Wildsyes
    • Stephanie G. Wolfyes
    • Wayne S. Spiloveyes
    • William Brownyes
    • William Candeloriyes

    Testimony

    • Pennsylvania Convention Center Authoritysupport, organization
    • Thomas W. Ventulettsupport, person
  33. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    replace modern metal and glass storefront, new storefront to look virtually the same as existing, deeper metal mullions for wind load safety

    Vote tally
    unanimous
    Criteria cited
    Structural safetyArchitectural preservationWind load compliance
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • David Hollenbergyes
    • Don Stevensonyes
    • Herbert W. Levyyes
    • William Cornellyes
  34. Alteration review

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Prior meeting reference: previous meeting approved glass wall cantilever concept

    Criteria cited
    Budget constraintsPreservation of historic sensePublic accessibility
    Votes and testimony

    Testimony

    • Sandra Bressleroppose, person
  35. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    mesh netting option recommended, netting to span bays over Filbert Street

    Vote tally
    unanimous
    Criteria cited
    EffectivenessMinimal visibilityPest control
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • David Hollenbergyes
    • Don Stevensonyes
    • Herbert W. Levyyes
    • William Cornellyes
  36. Informational

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    committee requested cost information for restoration planning

    Criteria cited
    Historic integrityFunding constraintsArchitectural preservation
    Votes and testimony

    Testimony

    • Sandra Bresslersupport, person
  37. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    work should proceed as previously approved, proposals for restoration of molded brick facade to be considered in future

    Prior meeting reference: previously approved

    Vote tally
    no_decision
  38. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    replacement storefront to look virtually the same as existing, deeper metal mullions to adequately carry wind load

    Vote tally
    unanimous
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • Carmen A. Torres-Rodriguezyes
    • David Brownleeyes
    • Stephan Wolfyes
    • Wayne S. Spiloveyes
    • William Brownyes
  39. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    glass curtain wall to be built straight up and to the south of the truss, architects to manipulate mullion pattern of glass near ceiling, lighting scheme to increase visibility through glass

    Prior meeting reference: previous meeting approved glass wall cantilever solution concept

    Vote tally
    unanimous
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • Carmen A. Torres-Rodriguezyes
    • David Brownleeyes
    • Stephan Wolfyes
    • Wayne S. Spiloveyes
    • William Brownyes

    Testimony

    • Henry Magazinersupport, person
    • Nan Guttermanneutral, person
    • Ted Garrisonneutral, person
  40. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    mesh bird netting to cover eastern facade of train shed spanning bays over Filbert Street

    Vote tally
    unanimous
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • Carmen A. Torres-Rodriguezyes
    • David Brownleeyes
    • Stephan Wolfyes
    • Wayne S. Spiloveyes
    • William Brownyes
  41. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Authority to retain idea of free-standing enclosed restaurant building at location, Commission members and staff to work on finding way to rebuild the diner

    Vote tally
    unanimous
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • Carmen A. Torres-Rodriguezyes
    • David Brownleeyes
    • Stephan Wolfyes
    • Wayne S. Spiloveyes
    • William Brownyes

    Testimony

    • Harry M. Perksneutral, person
  42. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Below stone belt course: wall must remain completely original brick; Above belt course: old brick may be removed and wall rebuilt in new brick; salvaged old bricks should be used to repair lower section

    Vote tally
    unanimous
    Criteria cited
    Historic fabric preservationAppropriate repair materials and methods
    Votes and testimony

    Votes

    • Architecture Committeeyes
    • Commissionyes
  43. Alteration review

    Historical Commission

    Recorded outcomeDenied

    Recorded conditions

    Dividing wall between grand court and ball room must be constructed completely of glass as originally conceived

    Vote tally
    unanimous
    Criteria cited
    Transparency of dividing wall is integral to design of important spaceCommission approval was contingent on transparent glass wall
    Votes and testimony

    Votes

    • Architecture Committeeno
    • Commissionno
  44. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Sign placement at corner of 12th and Filbert Streets approved; a study to be undertaken to address overall exterior Market signage

    Vote tally
    Majority in favor; Batcheler voted against
    Votes and testimony

    Votes

    • Penelope Batchelerno

    Testimony

    • Gerry Murphysupport, person
    • Jack McDavidsupport, person
    • Ray Grenaldneutral, person
    • Richard Tylerneutral, person
  45. Alteration review

    Architectural Committee

    Recorded outcomeDeferred

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Committee members to visit site before rendering opinion on Filbert Street lights; drawings of 12th Street fixtures more in keeping with character of Terminal building requested, including connection details

    Prior meeting reference: First time Committee has seen this project

    Votes and testimony

    Testimony

    • Nan Guttermansupport, person
    • Ray Grenaldneutral, person
  46. Alteration review

    Historical Commission

    Recorded outcomeDeferred

    Recorded conditions

    Referred back to Architectural Committee for resolution of design issues; half-scale renderings of original and simplified bracket designs to be presented; Streets Department to be contacted regarding federal grant funding review

    Prior meeting reference: Architectural Committee meeting prior to 391st Stated Meeting

    Vote tally
    Unanimous vote to refer back to Architectural Committee
    Criteria cited
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • Barbara Kaplanyes
    • David Brownleeyes
    • Peter VanderHeideyes
    • Robert Vanceyes
    • Scott Wildsyes
    • Stephanie Wolfyes
    • Susan Rabinovitchyes
    • Wayne Spiloveyes

    Testimony

    • Lee Waldronsupport, person
    • Ray Grenaldsupport, person
    • Scott Wildsneutral, person
    • Streets Departmentsupport, organization
  47. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Sign placement accepted at corner of 12th and Filbert; study to be undertaken to address exterior Market signage; sign must also be reviewed and approved by other City agencies including the Art Commission

    Prior meeting reference: Architectural Committee meeting prior to 391st Stated Meeting

    Vote tally
    Majority vote in favor; one dissenting vote (Wilds)
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • Barbara Kaplanyes
    • David Brownleeyes
    • Peter VanderHeideyes
    • Robert Vanceyes
    • Scott Wildsno
    • Stephanie Wolfyes
    • Susan Rabinovitchyes
    • Wayne Spiloveyes

    Testimony

    • Gerald F. Murphysupport, person
    • Jack McDavidsupport, person
    • Richard Tyleroppose, person
    • Robert B. Williamsneutral, person
    • Scott Wildsoppose, person
  48. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    No lighting approved for 12th Street facade - first preference; holes to be covered with diamond-shaped plates, If 12th Street must be lit: require design proposal that enhances building character, Streets Department to hire historical consultant for design, Oversized RLM fixture to be located for Filbert Street, On-site mockup of oversized RLM fixture to be prepared, Filbert Street hanging fixtures to have lengthened stems, Committee to visit site to view mockup

    Prior meeting reference: 391st Meeting of Commission; required Applicant to return with proposal

    Vote tally
    unanimous
    Criteria cited
    12th Street fixture designFilbert Street tunnel fixture placementHistorical character of Reading Terminal MarketConvention Center coordination
    Votes and testimony

    Votes

    • Arlene Matzkinyes
    • David Hollenbergyes
    • Don Stevensonyes
    • Herbert W. Levyyes
    • J. William Cornellyes
    • Suzanne Pentzyes
    • Tony Atkinyes

    Testimony

    • David Hollenbergneutral, person
    • Lee Waldronsupport, person
    • Milton Markssupport, person
    • Tony Atkinoppose, person
  49. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Filbert Street fixtures approved. For 12th Street facade: commission approved concept of installing ornamental/decorative bracket lighting fixtures. Committee had recommended no lighting for 12th Street facade, with holes drilled without permission to be covered. As second preference, Committee recommended requiring Streets Department to hire historical consultant for design. Authority's board authorized limited expenditure for simplification, not complete redesign. Power to be drawn from and maintained by Streets Department.

    Prior meeting reference: 391st Stated Meeting (8 February 1995) - proposal returned to Architectural Committee for further consideration at 28 February meeting

    Vote tally
    5 in favor, 3 opposed
    Criteria cited
    Contemporary fixtures appropriate where no precedent exists
    Votes and testimony

    Votes

    • Arlene Matzkinno
    • Barbara Kaplanabsent
    • David Brownleeno
    • Peter VanderHeideyes
    • Robert Vanceyes
    • Scott Wildsyes
    • Stephanie Wolfabstain
    • Stephen Mullinyes
    • Susan Rabinovitchyes
    • William Candelorino

    Testimony

    • Harry Perkssupport, person
    • Hyman Myerssupport, person
    • Lee Waldronsupport, person
    • PA Convention Center Authoritysupport, organization
    • Streets Departmentsupport, organization
  50. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Ten rows of 10 inch high baffles to be installed via helicopter, 3/4 inch gap between roof and baffles for meltflow

    Criteria cited
    Public safety
    Votes and testimony

    Testimony

    • Nan Guttermanneutral, person
  51. Alteration review

    Architectural Committee

    Recorded outcomeNo decision

    Committee recommendations are not final Commission decisions.

    Prior meeting reference: design guidelines drawn up at beginning of market renovations

    Vote tally
    <UNKNOWN>
    Criteria cited
    Design guidelines
    Votes and testimony

    Testimony

    • Ken Fosterneutral, person
    • Tony Tsirantonakissupport, person
  52. Alteration review

    Historical Commission

    Recorded outcomeApproved
    Vote tally
    unanimous
    Criteria cited
    Design guidelines for Market
    Votes and testimony

    Votes

    • Dr. Brownleeyes
    • Duane Bumbyes
  53. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Flat hanging sign over Filbert Street to be used instead of curved signs; details of structure and attachment to be refined in a more complete submission; SEPTA signage should use projecting sign on 12th Street south of Filbert Street

    Vote tally
    Not specified
    Criteria cited
    Historic characterVisibilitySignage
    Votes and testimony

    Testimony

    • J. William Cornelloppose, person
    • Leslie Gallery Dilworthsupport, person
  54. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Glass in clerestory on northern wall; cornice reduced in size and aligned with horizontal muntins of exterior windows; staff to review and approve details

    Criteria cited
    Retention of open-air stallsSpecial ordinance and market rental agreement granting Historical Commission jurisdiction over interior work
    Votes and testimony

    Testimony

    • Theresa Muellersupport, person
  55. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Criteria cited
    Votes and testimony

    Testimony

    • Charles Broudysupport, person
    • Reading Terminal Market Corporationsupport, organization
  56. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Criteria cited
    Votes and testimony

    Testimony

    • Reading Terminal Market Corporationsupport, organization
    • Robert DeHavensupport, person
  57. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Approval of proposed signage; its height and size will serve as the model for any additional signage applicants appearing before the Committee and Commission.

    Prior meeting reference: 13 December 2000 Commission meeting recommended approval of a box sign with logo lettering

    Criteria cited
    Votes and testimony

    Testimony

    • Tina Rochasupport, person
  58. Alteration review

    Architectural Committee

    Recorded outcomeApproved

    Committee recommendations are not final Commission decisions.

    Recorded conditions

    Sign mounted in mortar joints or existing holes; sign lowered to expose top course of stone.

    Criteria cited
    Restoration Standard 7
    Votes and testimony

    Testimony

    • Paul Steinkesupport, person
    • Rebecca Stoloffsupport, person
  59. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Sign mounted in mortar joints or existing holes

    Vote tally
    unanimous
    Criteria cited
    Votes and testimony

    Votes

    • David Schaafyes
    • Denise Smyleryes
    • Harris Steinbergyes
    • Joseph Jamesyes
    • Kathleen Murrayyes
    • Michael Sklaroffyes
    • Norman Tissianyes
    • Scott Wildsyes
    • Thomas Sugrueyes
    • Vincent Riverayes

    Testimony

    • Paul Steinkesupport, person
  60. Alteration review

    Historical Commission

    Recorded outcomeNo decision

    Prior meeting reference: Architectural Committee meeting of 22 February 2011

    Criteria cited
    Votes and testimony

    Testimony

    • Paul Steinkesupport, person
    • Tony Bracalisupport, person
  61. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Staff to review details; mezzanine windows to be articulated; glazing in demonstration kitchen treated for safety

    Prior meeting reference: Historical Commission reviewed and approved in-concept on 11 February 2011

    Vote tally
    Unanimous
    Criteria cited
    Votes and testimony

    Votes

    • Daniel Quinnyes
    • David Schaafyes
    • Dominique Hawkinsyes
    • JoAnn Jonesyes
    • John Mattioniyes
    • Joseph Palatinoyes
    • Miles Wilsonyes
    • Richardson Dilworth IIIyes
    • Robert Thomasyes
    • Rosalie Leonardyes
    • Sam Shermanyes
    • Sara Merrimanyes
    • Susan O.W. Jaffeyes

    Testimony

    • John Gallerysupport, person
    • Paul Steinkesupport, person
    • Preservation Alliance for Greater Philadelphiasupport, organization
    • Tony Bracalisupport, person
  62. Alteration review

    Historical Commission

    Recorded outcomeApproved

    Recorded conditions

    Staff to review details

    Prior meeting reference: Architectural Committee, 24 May 2011

    Vote tally
    Unanimous
    Criteria cited
    Votes and testimony

    Testimony

    • George Bakersupport, person
    • James Iovinesupport, person
    • JoAnn Jonesneutral, person
    • Paul Steinkesupport, person
    • Vincent Iovinesupport, person

Linked public records

Records are sorted by date and cite the basis for each property link.

  1. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  2. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  3. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  4. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  5. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  6. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  7. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  8. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  9. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  10. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  11. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  12. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  13. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  14. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  15. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  16. L&I permits on hearing parcelsCOMPLETED
    View on Atlas
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  17. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  18. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  19. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  20. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  21. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  22. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  23. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  24. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  25. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  26. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  27. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  28. HearingLinked by parcel number
    Philadelphia Historical Commissiondeferred
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  29. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  30. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  31. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  32. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  33. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  34. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  35. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  36. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  37. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  38. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  39. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  40. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  41. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  42. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  43. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  44. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  45. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  46. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  47. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  48. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  49. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  50. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  51. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  52. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  53. HearingLinked by parcel number
    Philadelphia Historical Commissiondeferred
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  54. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  55. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  56. Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  57. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  58. HearingLinked by parcel number
    Philadelphia Historical Commissionapproved
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  59. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence
  60. HearingLinked by parcel number
    Philadelphia Historical Commissionno_decision
    Link details

    This is the stored score for the link between this record and the property.

    Method:
    opa_exact
    Stored score:
    100% confidence