david are you go ahead okay yeah really the pattern of development here doesn't support

Similar wording

developing these separately uh as two separate uh a commercial and multi-family building and

Similar wording

separate row houses in the back on set by the street that would be inconsistent really with

Similar wording

everything that's been been going on uh and so we as i said we took a look at the block we found

Similar wording

that 26 of the 31 properties on on the block are mixed use and 21 of them include two or more

Similar wording

residences so it's really a mixed-use block with a multi-family on the upper floors and

Similar wording

commercial underground again care has been taken to design this building so that set by the street

Similar wording

facade it really relates to the row houses on the on the east side of the block um and you know with

Similar wording

the setbacks from most most locations on the street this is going to read as a two-story building

Similar wording

so just want to emphasize that um so i think having said all of that uh we believe that developing this

Similar wording

with a viable commercial use and desirable residential space is entirely possible

Similar wording

and will not have adverse effects on the neighborhood because of the items that I've

Similar wording

been enumerating here. But the RSA 5 zone would prohibit that, both the commercial use and the

Similar wording

multifamily and prevents us from really developing this as an as I said a an

Similar wording

overall unified plan of development the split zone would require us to really

Similar wording

piecemeal this so moving on to the dimensional variances we're as I

Similar wording

mentioned these buildings are almost identical we require two variances for

Similar wording

each of the buildings. There's a height limitation in both the RSA 5 and CMX 2 of 38 feet. That

Similar wording

doesn't really reflect what's been going on in the neighborhood. Almost all of the new

Similar wording

buildings exceed that. And it really doesn't allow for a desirable ceiling height in the

Similar wording

in the residential spaces and an adequate ceiling height in the commercial space so we really have

Similar wording

a modest height ceiling height 10 feet 8 inches in the commercial space so that really is is not

Similar wording

excessive so but we do need the relief in order to get that in with eight foot ceiling heights in

Similar wording

the residences. The medical use on the ground floor, of course, has a robust mechanical

Similar wording

requirement, so we do need some height there. Our requirement is 44 feet, so that I think

Similar wording

is a modest de minimis variance, exceeding the 38-foot limitation only by 6 feet.

Similar wording

uh we did take a look at the other the other properties in the neighborhood

Similar wording

um and we found that uh most of the buildings are are taller than 38 feet uh and i think we found

Similar wording

taller than 38 feet uh and i think we found nine buildings on the lot on the 11 buildings i'm

Similar wording

sorry on the block that exceed the cmx2 height requirement and two of those just at either end

Similar wording

of the block um the palm flats and the yellow jacket they both went to 53 feet so i think that

Similar wording

the 44 feet is modest and fits in with the with pattern of development the second dimensional

Similar wording

variance that we require is the occupied area limit and again this is consistent with what's

Similar wording

been uh happening in the in the neighborhood for the last 15 years most of the new buildings are

Similar wording

at or close to 100% coverage.

Similar wording

We have a 75% limitation for a mid-block building

Similar wording

in both the RSA 5 and the CMX 2 district.

Similar wording

Unfortunately, with the narrow depth of this lot,

Similar wording

of the block, providing the 75% coverage,

Similar wording

having 25% a quarter of the lot open to the sky would require us to have an interior courtyard.

Similar wording

And again, that really would severely compromise both the residential unit on the ground floor

Similar wording

and the depth and configuration of the commercial unit on the fronts on Frankfurt Avenue

Similar wording

and would make the internal circulation quite difficult.

Similar wording

So we we again took a look at what else is is happening, and we found 14 of the 31 properties on this particular block.

Similar wording

So just around half to be at or very near 100 percent coverage.

Similar wording

So, in conclusion, we really determined that this property cannot be successfully developed

Similar wording

in strict conformance with current zoning and that the denial of the variances would

Similar wording

create an unnecessary hardship and make this really quite difficult to develop.

Similar wording

Each variance that we've looked at is the minimum that's required to successfully develop the site.

Similar wording

And as I've mentioned quite a few times, I think that the grant of the variance would allow this building to be constructed in harmony with the surrounding sites in the neighborhood.

Similar wording

Granted, the variance will not increase congestion, as I mentioned, with the fairly light commercial use.

Similar wording

Granted, the variance will not impair adjoining properties.

Similar wording

As I've mentioned, we've set the building back from set by the street at the upper levels.

Similar wording

Granted, the variance will not adversely affect transportation or other utilities.

Similar wording

We touched on that with, again, fairly light commercial use.

Similar wording

uh this will not adversely affect the implementation of the comprehensive plan in fact it's very much

Similar wording

in support of the comprehensive plan promoting walkable neighborhood and local services and the

Similar wording

grant of the variance will not create any significant environmental damage again this

Similar wording

is a small site and there's no no extraordinary construction that would create any type of

Similar wording

pollution or flooding so uh for all of those reasons uh in my professional opinion i believe

Similar wording

the board can grant these variances and meet the uh intent of the code and uh and meet the intent

Similar wording

of the comprehensive plan david did you get a chance to review the t the new toc uh overlay

Similar wording

as well? I have not reviewed that, no. Okay. I just think for the board, it's worth mentioning

Similar wording

this bill is 260517. It was enacted in June of 2026, which predates the, the refusal predates

Similar wording

this bill. So we weren't going to start this whole process over, but the TOC overlay for the Burke

Similar wording

station which is less than I guess it's about a thousand feet from this property basically

Similar wording

Basically, council has now decided that 45 feet and 50% more units are appropriate for CMX2 lots near Burke Station.

Similar wording

council has now decided that 45 feet and 50

Similar wording

So just comparatively, we're asking for 44 feet and no density bonus.

Similar wording

So the request in front of the board is also less than the code now contemplates here.

Similar wording

So just worth mentioning and just in order to kind of not have this project span over a year of going through this process,

Similar wording

we didn't want to we and we would still need the uh dimensional variance for law coverage um but

Similar wording

it's worth noting that the legislation does now support additional height and density um for

Similar wording

locations that are um inside the 1320 foot radius from the identified transit uh community stations

Similar wording

are you through rachel yeah i think we can cross examine and mr chairman i would first make a

Similar wording

motion to strike mr plant's report and all of his testimony on the grounds that it wasn't submitted

Similar wording

21 days before the hearing it's dated october 4th so the earliest it could have been submitted was

Similar wording

two days ago and i saw it for the first time 25 minutes ago okay um rachel um so we submitted our

Similar wording

hearing packet um it's actually within 14 days of the hearing it's not 21 days the zoning posters

Similar wording

have to be posted within 21 days not the um hearing packets and we also have the ability

Similar wording

to supplement, given your testimony or given your, it's really argument, not testimony.

Similar wording

We were providing a report, given you're not providing any reports or expert testimony,

Similar wording

you're just providing your own argument for questions that you have for this matter.

Similar wording

The only reason, Chairman, this has been continued, especially given we have council support and

Similar wording

RCO support, and we've made significant revisions to this project, and Mr. Rand and his client have

Similar wording

identified in my 15 emails of outreach, no identifiable issues that they have with this

Similar wording

project. I don't know what else we should do besides issue a report that addresses the argument

Similar wording

that Mr. Rand has given. So we would ask that we'd be permitted to include this report and also

Similar wording

acknowledge that we have submitted the packet within the 14-day rule and are permitted to

Similar wording

supplement. You're not required to supplement within the 14 days or nobody would ever be able

Similar wording

to have these hearings given a lot of the documentation we get whether it's from the RCO

Similar wording

or the city or whomever is usually not within that 14-day period every single time so okay so

Similar wording

we're going to accept the report then I would next make a motion for continuance because I don't

Similar wording

think it's fair to present me with an expert report 25 minutes ago and have me cross-examine

Similar wording

the expert right now chairman respectfully um this is would now be the second continuance

Similar wording

mr rand is not offering any expert testimony he has no interest in doing that he's not offering

Similar wording

his client is also not an expert she's just a near neighbor they've identified no actual harm or

Similar wording

issues they have with this project they attended every single rco meeting and were able to voice

Similar wording

those sentiments on the record and this is just being delayed i'm not sure for for what reason

Similar wording

given again we have we went to two rco meetings we've made substantial revisions to this project

Similar wording

we have community support we have council support and i have submitted within the record 15 plus

Similar wording

emails to mr rand and his colleague asking if they want to meet what issues they have so that

Similar wording

we could address them and none have been identified so i don't know that a continuance is going to be

Similar wording

fruitful and it's just delaying um this project another couple of months to do this same thing

Similar wording

and i assume mr rand will not be providing an expert test an expert um and it's just seeking

Similar wording

to delay this matter so i would ask that so let him respond to you go ahead so first the notion

Similar wording

that there is no harm no big deal in erecting a 10-unit four-story building next to dorothy

Similar wording

correll's single-family home where she's lived for the past six decades is well so i mean so no

Similar wording

i want you to there's not enough listening i want you to respond to whether or not you need a

Similar wording

continuance. I do need a continuance. I may present rebuttal expert report. Certainly, I

Similar wording

should be allowed to not have to cross examine the expert by looking on my phone at tiny print and

Similar wording

hoping I can scroll through it fast enough. Okay. Chairman, he could have provided an expert at the

Similar wording

first hearing, he could have brought an expert to this hearing. And again, there's been many

Similar wording

opportunities. The hearing was in August. There's been many opportunities to ask questions or

Similar wording

discuss this project with us. Every solution we've offered, we've implemented, and we're

Similar wording

And we're just delaying this case.

Similar wording

just delaying this case. You've had the opportunity, George.

Similar wording

You've had the opportunity, Jordan, to bring an expert.

Similar wording

You've had the opportunity to speak with us about this project.

Similar wording

You've ignored emails or said you're not willing to meet on it.

Similar wording

So I don't know what a further delay is going to help.

Similar wording

So here's where I am.

Similar wording

I understand his position about a continuance.

Similar wording

What I want to do is work with Mr. Haggerty and see if we can have a date that be quicker than what we normally have.

Similar wording

I mean, I think Rachel's point, this has been going on for a while, and I understand what you've just said,

Similar wording

but what I'll do is I'm going to try to get this moved as quick as we can.

Similar wording

And Ian, is it possible that we not give a date right now and we figure it out later?

Similar wording

Yes, Chair, we're going to have to look at.

Similar wording

All right, so here's what we're going to do.

Similar wording

We're going to hear what you said, what you said.

Similar wording

And I heard what Rachel said.

Similar wording

This has been going on for a while,

Similar wording

so I'm going to try to get this back as soon as we can.

Similar wording

Okay, I appreciate that.

Similar wording

And you'll have to be ready to go, whatever.

Similar wording

I will be ready.

Similar wording

Rachel, we'll do our best to get this back in here as quick as we can.

Similar wording

Thank you.

Similar wording

Mr. Chairman, can I also make a comment?

Similar wording

If either side is going to present any more expert testimony,

Similar wording

I'm not saying you need to, can you please exchange it beforehand?

Similar wording

of course also i'll just note that rachel we got this late yesterday also so um we were able to

Similar wording

review it but if it wasn't sent to council so if you can please make sure that both sides exchange

Similar wording

anything before so we won't have another continuance yeah right okay understood thank you

Similar wording

Okay. Yeah. Number 7. Number 7. MI 2026-000-228-610-40 High Street. Allen Nockamson is the attorney.

Similar wording

They're being promoted to panelists, Sheriff.

Similar wording

good morning mr knockamson good morning before i swear you in i we're a little we we're moving

Similar wording

time or i'd have you give us an update on the phillies last week i mean because i it's been

Similar wording

that uh you would have been very good with that so but we're going to skip that today so just

Similar wording

state your name and spell for this alan knockamson a-l-a-n last name knockamson n-o-c-h-u-m-s-o-n

Similar wording

do you swear or affirm to tell the truth the whole truth nothing but the truth i do could

Similar wording

you identify your client the relationship to this property yes my client is high street associates

Similar wording

llc and then um to the left of me uh is alan borovich uh the representative from the llc okay

Similar wording

and um there's a letter of non-opposition from the 59th uh board that's a letter of support from

Similar wording

councilwoman bass and there's a petition of support and then there's a petition for opposition

Similar wording

okay and i i i understand from talking to our accounts that we're probably not going to vote

Similar wording

on this today i did not know that well then hopefully she will do you're going to need to

Similar wording

get an amended refusal because of the change in the parking we're going to need to get amended

Similar wording

refusal okay you changed the parking both the parking spaces and then the interior i think

Similar wording

there were two different parking but you changed the parking but okay we changed the parking but

Similar wording

there's no parking requirement for this matter because it's an rsa5 property so i'm why would

Similar wording

we need an amended i got i got two attorneys okay okay two people that's fine back through planning

Similar wording

and amended refusal because of what you changed so anytime we change the parking configuration

Similar wording

even with the zoning classification that doesn't require parking we still have to go through

Similar wording

streets and planning just so i understand for future reference and you know if you're taking

Similar wording

things out it could affect things that planning needs to review correct gotcha okay secretary

Similar wording

all right call for you uh good morning council did you submit your documents and exhibits 21

Similar wording

Yeah, 14 days ahead of this hearing.

Similar wording

Yes, we have.

Similar wording

And do you waive the reading of the refusals and stipulate to their accuracy?

Similar wording

I do.

Similar wording

Okay.

Similar wording

Then you can share your screen and begin your presentation.

Similar wording

All right.

Similar wording

Thank you.

Similar wording

Hi.

Similar wording

So, this is a CDR matter as well.

Similar wording

The lot size is 41,718 square feet, and we're here to present now.

Similar wording

And we're here to present now a 34-unit community with 36 parking spaces.

Similar wording

26 of those parking spaces are within the common parking lot, and 10 of those parking spaces are within garage structures.

Similar wording

So I have 11 exhibits here. We'll review those.

Similar wording

And then at the conclusion of my presentation, I would ask that Alan be sworn in, and I'll have a couple questions for him.

Similar wording

I also have Scott Woodruff of the architecture team, Design Blends, who can answer any technical questions you may have.

Similar wording

So right now we have three building structures, right?

Similar wording

The building structure that faces High Street has eight single-family homes.

Similar wording

There's a building structure to our left, which has eight duplexes.

Similar wording

and then there's a building structure if you look forward on high street which has 10 single family

Similar wording

homes with a garage with garage structures and then there's a common parking lot like i said

Similar wording

of 26 parking spaces uh our refusals are twofold uh whereas no more than one principal building

Similar wording

is allowed per lot in rsd rsd rsa and rta zoning districts again we're here because of the large

Similar wording

configuration of that lot instead of having one large multi-family building we think it's more

Similar wording

appropriate to have a mix between duplexes and single-family homes and you know that's that

Similar wording

refusal and also to provide some significant parking in the middle as well and have a nice

Similar wording

flow within that community the second refusal has to deal with the fact that we're rsa5

Similar wording

I would say in name only because this is a rather large lot of over almost 42,000 square feet, and we're proposing multifamily living to a degree because we're providing, again, eight duplexes, but we're also providing 18 single family homes as part of this community.

Similar wording

uh we made significant changes both because of community input as well as cdr input we reduced

Similar wording

the amount of surface uh parking spaces from 35 to 26. you're like wait a minute you're reducing

Similar wording

parking well there was there was a dichotomy here between what the community wanted and what cdr

Similar wording

wanted cdr wanted more landscaping right so in order to not have as much um you know uh

Similar wording

of what's it called paving we increased the landscaping but increased decrease the amount