ZBA Hearing - October 27, 2026

Philadelphia Zoning Board of Adjustment (ZBA)Oct 27, 20262h 51m

We collect existing traffic counts. We collected traffic counts at the intersection of 5th Street and Godfrey Avenue during the weekday morning, weekday evening, and Saturday midday peak hours.

Similar wording

From there, we project those counts into the future using a growth rate published by PennDOT for use throughout the state, varies by county and road type.

Similar wording

From there, we determine and generate trips for the proposed use, utilizing Institute of Transportation Engineers data, which, again, is consistent with PennDOT and Streets Department methodologies.

Similar wording

And we add those trips onto the no-build traffic volumes.

Similar wording

So that allows us to really compare no build conditions, which are conditions without this project, to future build conditions, which would be the, you know, conditions with this project added on to the existing volumes and background traffic growth.

Similar wording

Okay, I am showing some of the site plan here that's part of your study, and I'm asking you to describe the proposed development and how vehicles will enter and circulate and leave.

Similar wording

Sure. So what you're reviewing now is volume figures that are included in the appendix of our study. It's meant to represent the site plan, not be a complete copy of the site plan.

Similar wording

But in proposed conditions, the site will have one right turn in only driveway along North 5th Street located at the northern portion of the property and then an additional driveway along Godfrey Avenue that'll be right turn in, left turn out, left turn in and right turn out only.

Similar wording

So the left turn out movement will be restricted on Godfrey Avenue.

Similar wording

How does the proposed access design improve upon the existing curb cuts and address conflicts near the intersection and the bus stop?

Similar wording

So right now, in existing conditions, the majority of both frontages are depressed curb.

Similar wording

I believe there's two really defined driveways along both frontages, but in reality, the majority of both frontages is a depressed curb.

Similar wording

So a vehicle could enter and leave the site from, you know, a majority of the locations throughout the site.

Similar wording

With this revised and proposed access design, it really limits the vehicular movements to those two smaller driveway footprints on the northern portion of Fifth Street and the central portion of Godfrey Avenue.

Similar wording

Really eliminates the potential for, you know, pedestrian conflicts because the driveways are smaller than they are now.

Similar wording

And it reduces the potential for vehicular conflicts turning into and out of the site because the vehicular movements are really channelized at two specific locations, whereas now it's more of a free-for-all.

Similar wording

Understood. So would you, in your professional opinion, say that this plan, this proposal, is demonstrably safer than the previous use?

Similar wording

Yes. As it relates to access to and from the property.

Similar wording

Yeah. As well as for pedestrians. Is that correct?

Similar wording

Correct.

Similar wording

Okay. And you have reviewed the streets department approval. Is that correct?

Similar wording

Yes, that's correct.

Similar wording

Explain how the approved access plan relates to that.

Similar wording

So the approved plan, I believe, is on the screen right now, which is consistent with the plan that we reviewed as part of our transportation impact study.

Similar wording

Okay. You also did traffic attributable to the fuel usage. Explain the differences.

Similar wording

traffic attributable to the fuel usage. Explain the differences between the gross

Similar wording

site trips, the passerby trips, and the trips that are new to the surrounding roadway network.

Similar wording

Sure. So as I mentioned, we look towards data published by the Institute of Transportation

Similar wording

Engineers, which is a really national publication that's accepted by PennDOT and the Streets

Similar wording

department for use in transportation impact studies. For this use specifically, a convenience

Similar wording

store with gas station, IT identifies that a large portion of traffic is what we call pass-by

Similar wording

trips. And what that means is it's a vehicle that's already on the roadway network. It's

Similar wording

already passing the site. Someone decides they need gas or needs to stop at the convenience store.

Similar wording

they pull into the site, you know, fuel their vehicle, and they get back on the existing

Similar wording

roadway network. So it's not necessarily someone driving from their house to get to the site. It's

Similar wording

really an existing vehicle that's already on the roadway network. And contrary to that are primary

Similar wording

trips, which are the opposite. They are, you know, a vehicle that's specifically traveling to this

Similar wording

site to get gas or to get something at the convenience store. IT identifies between one

Similar wording

half and two-thirds of total trips to this use are pass-by trips with the remaining you know

Similar wording

one half to to one-third being the the primary trips as far as the operation of the complete

Similar wording

project what does your separate analysis of the full project show about future intersection delay

Similar wording

and level of service that i believe is on page 47 correct so here table eight compares uh the

Similar wording

future levels of service um no build conditions again being without the project completely no

Similar wording

credit was taken for any existing use or permitted use on the property and the build conditions

Similar wording

refer to um the construction and and um trips associated with a convenience store with gas use

Similar wording

What we found is there's really minor changes in delay at the adjacent intersection of Godfrey Avenue and North 5th Street, and the site driveway along Godfrey Avenue would operate with good levels of service.

Similar wording

Okay, and if we go to page 48, we look at queuing and driveway.

Similar wording

What do the queuing and driveway analysis show about surrounding traffic and emergency access?

Similar wording

Sure. So the intersection, you know, analysis did show that there are pretty substantial queues in existing condition at that intersection. They extend beyond the site frontage on both 5th Street and Godfrey Avenue.

Similar wording

um but with the additional trips um associated with with this project there's really minor

Similar wording

changes in those queues um adding about 10 feet or so so less than a vehicle on average

Similar wording

um compared to the queues existing today very good i'm going to go over here to page 42

Similar wording

what did your bus stop you did a bus stop observations as well and what did your bus

Similar wording

stop observations show, and how did you account for those existing conditions in assessing this

Similar wording

project? Sure. So we, you know, hearing some of the concerns from the community and knowing there

Similar wording

is a bus stop located on the 5th Street frontage of the property, we did review really the dwell

Similar wording

times and any issues associated with the existing bus stop on that portion of the frontage.

Similar wording

We typically found an average draw time of about 30 seconds for a bus to stop and either load or unload passengers with a maximum, in our observations, of about 60 seconds.

Similar wording

Again, that's not intended to be a full maximum that the bus will be there, but based on our observations, the longest stop we observed was around 60 seconds.

Similar wording

All right. What supports your opinion about pedestrian and traffic safety at the proposed driveway?

Similar wording

And can you please explain the 700-foot site distance and the conservative analysis of 30 to 35 miles an hour?

Similar wording

Sure. So really supporting our opinion is the reduction in crossing distance for pedestrian at the driveways.

Similar wording

So as I mentioned right now, the driveways are, you know, essentially the full length of both frontages with minor sections where there's full height curb.

Similar wording

But with the construction of this project and the reduction in the width of those driveways, the pedestrian crossing distance of each driveway will be smaller.

Similar wording

You know, 24 feet is the maximum width of the driveways as shown.

Similar wording

We also reviewed, you know, crash records at the adjacent intersection.

Similar wording

And then we also reviewed the available site distance from the Godfrey Avenue driveway.

Similar wording

So we were a little conservative in that assessment as we looked at 35 miles per hour in lieu of the 30 mile per hour posted speed limit, but we found there was sufficient site distance for vehicles exiting the site there to see traffic, bicycles, or pedestrians on the roadway.

Similar wording

We were a little conservative in that assessment as we looked at 35 miles.

Similar wording

Okay, I'm going to use page 16 of the binder so we can talk more about.

Similar wording

And using this particular page, how does the analysis account for existing traffic flow?

Similar wording

How do you, does this project affect, compare to those ordinarily expected from a convenience store with eight fueling positions?

Similar wording

So our analysis considered existing traffic again by we obtained existing traffic counts at the intersection. We compared those counts to historical volumes obtained by PennDOT in the area, found they were pretty consistent with those historical volumes.

Similar wording

And then, you know, we reviewed the project's impact based upon data published by ITE, which is, you know, a standard within Pennsylvania for PennDOT and the streets department.

Similar wording

And we found it's, you know, pretty consistent with the impacts expected from a convenience store with eight fueling positions.

Similar wording

Very good. Anything further that you'd like to add, Kevin, about this traffic flow or the study?

Similar wording

No.

Similar wording

Okay. Do we have any questions for this witness?

Similar wording

Why don't we see you're going to have one more witness, right?

Similar wording

I do. Actually, I'm going to be bringing on my client one more time, but first, I do have a safety witness as well.

Similar wording

All right. Why don't you bring one? What's the reason to bring your client back on?

Similar wording

Just to talk about hours of operation and some of the nuts and bolts of this.

Similar wording

Okay. Why don't we try to move this further?

Similar wording

Sure. Thank you, Kevin. I want to call Casey Condon.

Similar wording

Casey?

Similar wording

There is no one with that name in the virtual audience. Can that person please raise their hand if they're logged in under another device?

Similar wording

He called in. I think he's doing, I think it's star nine or something.

Similar wording

all right i see them with their hand raised they're being

Similar wording

okay i'll allow them to speak sure thank you

Similar wording

hello hi could you please state your name and spell for the sonographer

Similar wording

casey condon c-a-s-e-y e-o-n g as in girl d as in dog o n do you swear or affirm to tell the

Similar wording

truth the whole truth nothing but the truth yes sir could you put your video on please

Similar wording

uh i only called in okay all right verne please proceed thank you casey thank you for joining us

Similar wording

You're the owner of Precision Petroleum, is that correct?

Similar wording

Yes, sir.

Similar wording

And your work includes the installation, modification, removal, compliance testing of underground storage tank systems.

Similar wording

Is that correct?

Similar wording

Yes, sir.

Similar wording

Okay.

Similar wording

And what Pennsylvania DEV certifications do you currently hold?

Similar wording

And what experience do you have with underground fuel systems?

Similar wording

So I have three DEP certifications. I have my underground install, my underground removal, and my above-ground removal.

Similar wording

I've been building gas stations for over 10 years, mostly all underground storage tank-related work, everything from truck stops, even some federal Army Depot work with underground storage tanks.

Similar wording

Okay. And we've asked you to provide technical insight and address some questions from the board today based on your field experience. And you have reviewed the site plan?

Similar wording

Yes.

Similar wording

And you've discussed the equipment and proposed, let's propose for this specific location with our ownership. Is that correct?

Similar wording

Yes.

Similar wording

Okay. Can you explain briefly the proposed tanks, the piping, the monitoring, and the fueling equipment in plain language?

Similar wording

the monitoring, and the fueling equipment in plain language?

Similar wording

So the underground tanks have two layers in them.

Similar wording

They're double-walled tanks.

Similar wording

So you have your primary and your interstitial space

Similar wording

that is monitored continuously multiple ways

Similar wording

with the tank monitor that would be inside the store.

Similar wording

it's going to continuously look for leaks inside the fuel system but there will also be a sensor

Similar wording

in between the two layers of the tank as well um that would let you know if there was an issue

Similar wording

for the product piping that will be uh double wall piping as well

Similar wording

uh and i i even referred them to a more durable product piping this the stuff that they intend to

Similar wording

put in has uh seven layers to it instead of two like the competitor uh pipings so it's a lot more

Similar wording

durable they will have sensors everywhere that the fuel can leak into and if there is any liquid

Similar wording

inside that area it will shut down the site so they can no longer sell fuel

Similar wording

and what a tank does that speak to the uh pump shutdown is that what you

Similar wording

Yep, that's the pump shutdown.

Similar wording

So it's all wired in to where if the tank monitor itself sees a leak somewhere,

Similar wording

it will shut down the motors to the gas station and they cannot pump any further.

Similar wording

And can you speak to the vapor balance system that's being proposed?

Similar wording

yeah so it's uh uh gasoline vapors are inside of a tank all the time uh on on top of the vent lines

Similar wording

they have a pressurized uh vent cap which holds the pressure into the tank to reduce the amount

Similar wording

of vapors when the truck is going to deliver fuel they hook up a whole nother hose and it will pull

Similar wording

the vapors into the truck instead of placing it into the atmosphere and uh local area okay and

Similar wording

the vdeer a root system that's intended to monitor the tank conditions uh is it your testimony that

Similar wording

It'll stop further petroleum from moving, but also investigate and correct and document the issue?

Similar wording

It will. Yes, it will. It will.

Similar wording

It continually monitors how much fuel is in the tank and it will tell you it'll figure out if it is leaking or not leaking.

Similar wording

um from from there it prints out reports and you know notifies the operator to not use the tank

Similar wording

anymore and what about during fuel deliveries what measures help prevent or contain spills

Similar wording

and tank overflows during delivery uh during a delivery there will be inside the tank it's a

Similar wording

It's called a drop tube shutoff device, which in theory, as the fuel is coming down into the tank, there is a flap in there.

Similar wording

Usually around 92% of the tank, it will start to restrict the flow.

Similar wording

And at 95%, when they're dropping fuel, it will completely shut off the flow to the tank from the tanker truck, not allow it to overfill.

Similar wording

Very good.

Similar wording

Good. And vapor controls. How will vapor controls work when the fuel is delivered and stored?

Similar wording

Sorry. That is just about the same thing.

Similar wording

um so when gas is going into the tanker truck or sorry when gas is going into the tank from

Similar wording

the tanker truck they have a hose that is hooked up um which sucks the um the vapors back into the

Similar wording

tanker okay there's a whole separate port on the tank itself for uh just the vapor

Similar wording

to be pulled back into the trucks.

Similar wording

How does the proposed system compare with the current industry standards and the recognized best practices?

Similar wording

How does the proposed system compare with the current industry standards?

Similar wording

The whole system of what they intend on putting in?

Similar wording

Yes.

Similar wording

How does it compare with the current standards?

Similar wording

Are there older facilities operating with single-wall tanks as opposed to what we're proposing?

Similar wording

Yeah, absolutely.

Similar wording

Every, uh, there's still a lot of, a lot of places that have single walled tanks.

Similar wording

Um, it is, it is now industry standard to put in double walled tanks, but I, I can say

Similar wording

just this year, um, with tanks that I have removed, um, way, way more single walled

Similar wording

tanks were removed than double-walled tanks, and I've removed plenty of double-walled tanks as well,

Similar wording

but their site that they're proposing is definitely above what is required for your bare minimum

Similar wording

requirements to satisfy DEP, the parts that they intend on putting in are definitely above and

Similar wording

beyond what they would need to do. So in your professional opinion, what we're proposing

Similar wording

exceeds current industry standards, is that correct? Yes, absolutely.

Similar wording

Would any of the proposed equipment, would you state it as state-of-the-art, any of it?

Similar wording

I would say the VitaRoot system, they're very state-of-the-art.

Similar wording

they they it's got it's called um continuous statistical leak detection which that is going to

Similar wording

monitor the fuel in the tank 100 of the time from the time that you first put fuel in there

Similar wording

it will continually monitor and tell how much fuel is

Similar wording

understood are you there

Similar wording

did we lose him i don't know i'm not sure yeah are you still there sir

Similar wording

well he was driving so i'm not sure yeah you know sounds like he dropped off how about your

Similar wording

other client your client um yeah uh sukpa sendu if you could just come back on briefly

Similar wording

So as you can hear the testimony thus far, the traffic study was very deliberate, very thorough, reduced the number of access points, as the safety expert said, state-of-the-art equipment, unlike most industry standards, we are exceeding.

Similar wording

And, of course, my client has already testified to the lighting and surveillance and the landscaping.

Similar wording

And I hope he's back on to give us a little bit more.

Similar wording

I think your client's there.

Similar wording

Okay.

Similar wording

Sir?

Similar wording

Yes.

Similar wording

Mr. Sandhu, can you speak to hours of operation, number of employees, and general trash maintenance and management?

Similar wording

I think we're going to do like early morning, like 6 a.m. to probably like early, like late evening, maybe 10 or 11 p.m.

Similar wording

Trash will every day. We'll have every day. We'll go out there asleep and make sure everything's nice and clean.

Similar wording

Otherwise, if we're like if our business is dirty and has trash everywhere, who wants to visit your business?

Similar wording

And if you have any visitors visiting your business, you're going to be out of business real soon.

Similar wording

Very good. Anything else to add, sir?

Similar wording

no i think like we have a good track record if anybody had from anybody from the meeting had

Similar wording

the opportunity to check out our other sites i think they'd be happy um i think we're responsible

Similar wording

like operators i know i go to gas stations where i don't i feel uneasy but um if you ever visited

Similar wording

any of ours you'd feel like really comfortable you'd have no issues and um you'd be happy to

Similar wording

have us uh you know i think we would be a great addition to the neighborhood very good and you

Similar wording

attended the rco meeting correct the first one yes the second one i had to go to somebody's wedding

Similar wording

so i was unable to attend it yeah but in attendance was attorney harry cook with you is that correct

Similar wording

yes okay thank you nothing further for mr sandu i would like to bring on my colleague

Similar wording

uh mr cook just for a very brief fact witness as to the rco meeting okay but all right and that's

Similar wording

that's my last one okay yeah are we they're being promoted to panelists here

Similar wording

They're being promoted to panelists here.

Similar wording

Mr. Chair, members of the board.

Similar wording

Hi, could you please state and spell your name for the stenographer?

Similar wording

Harry Cook, H-A-R-R-Y, C-O-O-K, Anasasio Law.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording