to respect that we can you know we need commercial space um and we just want it just like other

Similar wording

community so thank you thank you for listening no thank you for taking the time to close we

Similar wording

appreciate your input and you appreciate the work you've done on this thank you okay is there anyone

Similar wording

else in the virtual audience there are no hands planning commission Amy Boyd with planning

Similar wording

commission the property was zoned rm1 residential multifamily at the time of the district plan

Similar wording

and it recommended no change the property was later remapped to cmx1 commercial mixed use

Similar wording

three units would be allowed by right under rm1 the opponent has not demonstrated that there are

Similar wording

unique physical conditions or circumstances of the property that would prevent it from being

Similar wording

used in conformance with the required occupied area or setback the planning commission recommends

Similar wording

that the board grant the requested variance for two family and deny the requested variances for

Similar wording

front yard setback and occupied area may i just respond briefly so the front yard setback we are

Similar wording

eliminating that by way of the amended refusal um and then in terms of the occupied area we are

Similar wording

less we have a less variance in the properties to the left and right of us so we're not affecting

Similar wording

those properties they're affecting us more than anyone else thank you so we're holding this for

Similar wording

amended refusal am i correct thank you counsel the case is otherwise closed all right thank

Similar wording

you am i doing one more am i going back you have one more okay and then mr whale will be out here

Similar wording

all right uh mi2025-005-350-3430 north bodine street um unanimous support from 19th ward rco

Similar wording

applicant also provided a support of 12 signatures from neighbors all in the immediate block

Similar wording

mr knockamson just state your name for the record alan knockamson could you identify your client in

Similar wording

relationship to the property lucero fernandez and our vice chair has a few questions uh good

Similar wording

afternoon have you submitted your documents and exhibits uh five days in advance of this hearing

Similar wording

yes we have and do you waive the reading of the refusal and stipulate to its accuracy

Similar wording

seat we do okay uh thank you you can proceed with your case all right thank you so this is

Similar wording

This is not a developer. This is a client who had a property, the building structure extended out

Similar wording

not a developer this is a client who had a property the building

Similar wording

by a little more than five feet without permits. We're trying to correct this situation. It was

Similar wording

extended by the first and second floor. It's owner occupied. She owns it. All right, so let's go over

Similar wording

the refusal. So again, this is, you know, an RTA one property, I think. I can't read. It's like

Similar wording

blurry but um again single family use we have three refusals 100 occupied area where 75 is

Similar wording

allowed by right we have no rear yard setback where nine feet is required and our minimum rear

Similar wording

yard area square feet is supposed to be 144 where it's zero this you know obviously my client would

Similar wording

love to have done it the right way um but we're trying to fix it to do it the right way we under

Similar wording

also understand that this is just the first step in clearing this up that if we are lucky enough

Similar wording

to have this variance granted we have to go get a building permit and we have to get a co which

Similar wording

means further inspections um you know again mike's clients a long-standing member of the community

Similar wording

and as you can see the community is well in support of this project with unanimous support

Similar wording

and then we have a petition behind that of nearby neighbors as well

Similar wording

so and by the way it's not out of character to have full lock coverage and no rear yard setback

Similar wording

3424 north bodine and 3442 north bodine both also have full uh lock coverage

Similar wording

next

Similar wording

just maps oh so we're actually rm1 sorry i couldn't read that um but yes but we're just using this

Similar wording

a single-family structure. She's just living there. Next. Next. So that's the front of the

Similar wording

property. Continue. It's a proof of posting for today's hearing. North Bodine to the right and

Similar wording

to the left. Continue. And then this is just Pitt interior photos. We try this to be as

Similar wording

descriptive as possible and then you can see here from the red dots of what was extended out and it

Similar wording

was really to create a basically this was a two-bedroom and we wanted to make this into a

Similar wording

two-bedroom with an office and also extend out the kitchen area so that was what was extended there

Similar wording

and on the second floor she didn't extend up she just extended back she created a separate bedroom

Similar wording

for herself and converted one of the smaller bedrooms into an office next

Similar wording

so we met with the community next

Similar wording

next how do you have pictures of what she did in the room um alex do you have pictures of that

Similar wording

one bedroom and the kitchen oh the kitchen was you'll see the kitchen this is the new kitchen

Similar wording

right so that's basically that floor area did not exist or to a significant degree and then

Similar wording

do we have the second bedroom is this it all right so those are those are pictures examples

Similar wording

of what was extended out and then our application for appeal deed to the property and then tax

Similar wording

clearance certificate she's lived there since 2007 so she's been there almost a generation

Similar wording

so she just wanted more room for herself did not understand how long ago she do this um

Similar wording

i don't know how did we get here well we got all night yeah l and i came a violation

Similar wording

so and we're trying to clear that up on multiple levels okay all right do you want to yeah miss

Similar wording

Yes, Fernandez, can you raise your hand so they can see you and then swear you in?

Similar wording

And she's represented by Onion Flats Architecture, so she has a really good architect who's helping

Similar wording

us clean this up.

Similar wording

But he wasn't the original one.

Similar wording

He was not the original one.

Similar wording

So she hired an architect, she hired a law firm, we're dealing with this.

Similar wording

It's been promoted.

Similar wording

Could you please state your name and spell for this phonographer?

Similar wording

Yes, my name is Lucero Chesnudiz.

Similar wording

L-U-C-E-R-O-C-H-E-Z-M-U-D-I-Z.

Similar wording

Right.

Similar wording

Do you swear or affirm to tell the truth, the whole truth, nothing but the truth?

Similar wording

I do.

Similar wording

i do proceed yeah lucero you heard everything i had to state today about your zoning matter

Similar wording

Proceed, Cal.

Similar wording

Yeah, Lucero, you heard everything I had to state today about your-

Similar wording

yeah is it is it true and correct what i stated yes and do you do you adopt as your own testimony

Similar wording

yes thank you questions from the board yes yeah where are the pictures

Similar wording

yeah go ahead yeah you could uh alex wanted to reshare the screen there were their pictures um

Similar wording

um but okay I didn't see a picture of the outside of the property oh in the front I don't know if

Similar wording

in the rear right yeah do we have any pictures of the rear you showed us the bathroom and the

Similar wording

kitchen yeah so that's the kitchen so that would be the extended area part of the extended area

Similar wording

and then the other bedroom Alex is that's the extended bedroom on the second floor do we have

Similar wording

any pictures just of the rear of the exterior from the outside we do not because we're full

Similar wording

lot coverage so that would require us to go into the lot next door yeah so so question question

Similar wording

for you you've got this property goes from property line to property line to property line

Similar wording

to property line right so in the rear addition this property goes the addition goes from the

Similar wording

side property lines to the rear property line how are you planning it you have you got a window there

Similar wording

and as a look at google it looks like the window is facing the adjacent property on the property

Similar wording

line so if there's a window that's on the party line we know what has to happen after this hearing

Similar wording

and what's that that it would have to be boxed in like you can't

Similar wording

Then you can't have a bedroom without a window.

Similar wording

So, well, I mean, so we would have to take a look in.

Similar wording

Well, I think that bedroom also faces, well, the party wall left and right.

Similar wording

But I would assume she would then have to, like, install a window at the rear of the property.

Similar wording

And that's on the property line also.

Similar wording

Well, you can do that.

Similar wording

Can you check that?

Similar wording

Well, you can.

Similar wording

Let me see.

Similar wording

i guess i guess my my and we don't have to let's talk go through all that now the fact

Similar wording

of the matter is you've got this addition that goes from three property lines back rear and sides

Similar wording

and you're attempting to have a and you have a bedroom there that has a window somewhere

Similar wording

and actually this is the only property on the whole block that does it on the second

Similar wording

level everybody else has a hatchback where there's nothing above the first level of extension

Similar wording

yeah um i would have to take a look at that i'm sure they're if there has to be modifications

Similar wording

made she will figure out those modifications yeah i mean she may have to set back the property back

Similar wording

and i don't know from the property line the rear property line in order to get a

Similar wording

a legitimate window yeah if we have to deal with that through administrative review

Similar wording

alley behind this property i'm sorry i didn't hear you is there an alley behind this property

Similar wording

um alex do you want to go on uh atlas and let's see i don't i'll be on the deed

Similar wording

well we can also see on atlas right there is and and i believe the project architect has his hand

Similar wording

raised well let me bring the architect on there is an alley

Similar wording

so you could have like the window in the rear

Similar wording

well i don't think you can do that by code either

Similar wording

because you're that's the property right um yeah uh this is dan addis here uh architect

Similar wording

hold on hold on one minute counselor do you want the architect yeah of course well he's

Similar wording

say your name and bell quick sonographer uh sorry did yesterday state my name and spelling

Similar wording

please uh dan addis d-a-n-a-d-d-i-s um so um i guess i'll start by saying to tell the truth the

Similar wording

whole truth nothing but the truth i do so if we could pull up the floor plans again really quickly

Similar wording

You'll see that on both the zoning submission and this existing predates your plans.

Similar wording

So your plans are actually just recording an existing condition.

Similar wording

So not exactly.

Similar wording

My zoning plan is recording an existing condition while also proposing the fixes required to

Similar wording

satisfy the emergency escape opening requirement by the International Residential Code.

Similar wording

So if you see on that bedroom two right there and the dotted line that's on the approved

Similar wording

zoning drawing um that that um screen or that a slider door that's towards the rear of the bill

Similar wording

of the bedroom um does not currently exist so the client is well aware and what we've discussed is

Similar wording

um does not currently exist so the client is well aware and what we've discussed is that

Similar wording

that

Similar wording

any windows that currently exist that are on the property line um they will need to be they will

Similar wording

need to be closed up they will need the proper fire ratings we will need to pull a commercial

Similar wording

or a residential building permit to um to make all to correct all those fixes if we get this

Similar wording

variance and also go through all the city inspections to make sure that we've satisfied

Similar wording

any fire separation requirements and the proposed um fix for that bedroom to make sure that we still

Similar wording

have the required emergency uh escape access is that we pull back refill up the property line

Similar wording

so that we can actually have glazing and we're proposing either it could be a window but i'm

Similar wording

proposing putting in a screen door like a slider i guess accessible slider so that you then have

Similar wording

access to the public right of way which is provided by that alley in the rear so um that's

Similar wording

how we're handling that that's how we're proposing to handle that while you know the bedroom on the

Similar wording

front of the house already has its windows so it has that so you're absolutely correct that the

Similar wording

bedroom requires a window or some way to get out um and that's that's how we're proposing to to

Similar wording

handle that if this variance is granted and so and so the so the was it currently called out as

Similar wording

a bedroom where you have the office on the second floor um i'm calling that out as an office because

Similar wording

that that's not a legal bedroom right so the intent is not to have that as a bedroom and

Similar wording

obviously i mean if you've been in any of these real homes they have this very tiny tiny room

Similar wording

so that's more appropriate as an office i don't i can't speak to what's currently in there but um

Similar wording

yeah like the the plan is that we're looking for a variance for it's just for the for two bedroom

Similar wording

with one on the rear uh and one in the front where we have uh you know safety we've got the ability

Similar wording

to get to public right of way okay i have a question about the uh construction so when the

Similar wording

addition was built do you know what happened at the ground level from a foundation standpoint

Similar wording

for the two stories that went up because i'm assuming the existing basement did not go back

Similar wording

that far i believe that it's been i can't speak to it i can't speak to it but my understanding is

Similar wording

the basement doesn't go all the way back and i would just suggest that like this is all stuff

Similar wording

that would need to be verified at the building permit and inspection phase like like in the end

Similar wording

of the day if the variance is granted we need to provide accurate drawings documenting the existing

Similar wording

conditions and any required fixes to bring the building up to code we are aware of that i think

Similar wording

we're just more so trying to understand process right and like you as a as a expert when you

Similar wording

looked at the construction because at this point a lot of um everything that has been touched touched

Similar wording

a major line electricity was moved um the gas line was was touched they had to underpin the

Similar wording

buildings next door they've had to build something that now has structure like a lot of construction

Similar wording

happened in the in the realm of construction that's now happened without oversight review permits

Similar wording

or plans so i think we're you know yes understanding that that happens the building

Similar wording

permit phase but um we also don't have to say yes so i think we're sitting here and we're just

Similar wording

trying to understand what's the next steps to bring this to correct this and i don't think

Similar wording

that just saying that we're adding this sliding door to the second floor bedroom is sufficient

Similar wording

Well, Dan confirmed what I'm stating is correct.

Similar wording

We have to do all the inspections one would expect of a newly constructed property.

Similar wording

Sort of, because you cannot inspect inside a wall when the drywall is already up.

Similar wording

Sometimes they tell you, like, hey, we've got to cut some holes into seeds.

Similar wording

Sometimes.

Similar wording

Yes.

Similar wording

I would expect that would be the case with the inspections,

Similar wording

is that we're going to have to open up some walls to do some confirmation

Similar wording

in order to pass certain inspections etc etc yeah what now i said you have to confirm some

Similar wording

foundation depths etc yeah yeah so i i would leave it to dan to explain how we would do that

Similar wording

in terms of foundational dan you know well yeah i guess i so so obviously there's so one we you

Similar wording

know as as the design professional brought on here like we also kind of on the hook for making sure

Similar wording

that when we get to the building permit phase that we're actually documenting safe conditions so

Similar wording

But whether whether it's something that somebody could try to get away with or not, like we're going to have to go in there and we're going to have to evaluate what the we're going to evaluate what the existing wall assemblies are and make sure that we've got our one hour ratings.

Similar wording

And we're going to have to do to that point in the basement, like if, you know, like the back portion of that basement has some crawl space that's not accessible without doing some sort of some sort of exploratory demolition.

Similar wording

So I believe that that would be the next that would be the next step before we could put together documents, because we really the job is to get in there and actually document what is existing so that we can establish whether or not whether or not it was done to code and then provide corrective measures if needed.

Similar wording

Does that answer the question? I'm happy to try to rephrase it if there's more that you're looking for.

Similar wording

no that's that's sufficient okay um questions from mortuary can i can i just make a comment my comment

Similar wording

Questions from auditory. Can I can I just make a comment? My comment would just be see this is this is why you asked for permission rather than forgiveness.

Similar wording

Um, because you've now created all these conditions that make it so that.

Similar wording

When you get to the building stage, you're going to have to do a lot of revisions to make sure that you have habitable rooms, which is.

Similar wording

what the code requires and you would have known that had you had the client um gotten or asked for

Similar wording

permits ahead of time yeah I don't think it was intentional um it never is okay well that's the

Similar wording

that's the that's the age-old story here I didn't know uh it wasn't intentional I I I thought it

Similar wording

It would be okay. The contractor told me it was already whatever the story is. The bottom line is that what was done here is something that would have been flagged. Um, if permits were asked for, and this is not the 1st time that this has had a building courts violation.

Similar wording

In the 10 years that she's senior, she's on the property. Okay.

Similar wording

Um, Hillary, no questions at this time, Mr. Chair.

Similar wording

virtual audience any comments

Similar wording

there are no hands planning commission amy boy with the planning commission the comprehensive

Similar wording

plan recommends a change in zoning at this location from r1 residential multi-family to rsi

Similar wording

5 residential single family there is no evidence that the proposed addition was constructed with

Similar wording

the benefit of permits and the proposal will injure the use of adjoining properties access

Similar wording

slight and air the planning commission recommends that the board deny their requested variance for

Similar wording

occupied area rear yard depth and rear yard area just to respond the next door neighbors are not

Similar wording

in opposition to this project and they're the ones who are most directly impacted right right um

Similar wording