civus
Hearing video

ZBA Hearing - August 5, 2026

Philadelphia Zoning Board of Adjustment (ZBA)Aug 5, 20267h 25m

Good afternoon.

Similar wording

have you submitted your documents and exhibits five days in advance of this hearing yes okay

Similar wording

Yes.

Similar wording

Okay.

Similar wording

and you have uh several use refusals and zoning refusals

Similar wording

And you have several use refusals and zoning refusals, so do you waive the reading of the refusals and stipulate to the accuracy?

Similar wording

Yes, except we've made revisions to the project, and so some of the refusals have been removed, and we have submitted the proviso plan form and updated plans that will reflect that.

Similar wording

Okay.

Similar wording

Yep.

Similar wording

Hillary's nodding.

Similar wording

Yes.

Similar wording

All right.

Similar wording

You can proceed with your case.

Similar wording

Thank you.

Similar wording

Okay.

Similar wording

okay can you see my screen yeah okay great

Similar wording

maybe just a little larger if that's possible

Similar wording

is that better that's better yep okay so um this is a project on a thousand north 48th street and

Similar wording

And as mentioned, we have the support of Mill Creek Advisory Council, the coordinating RCO.

Similar wording

I'll go through this, but we met with them in two different occasions and received a letter of support based on the revisions, which our architect will go through.

Similar wording

The original proposal was for the erection of an attached structure with a roof def and roof def access with residential use, multifamily household living.

Similar wording

It was reduced from 16 to 15 units.

Similar wording

And like I said, some of these have been reduced.

Similar wording

so we'll go through that on the plans a lot of the refusals were generated because the property is

Similar wording

owned rsa5 let's go through some of the visuals to give you a sense of the site the deed

Similar wording

okay

Similar wording

so this is a pretty unique but significantly sized parcel it originally contains an entire city block

Similar wording

on the North 48th Street. Directly behind the property is a massive cemetery. And we're just

Similar wording

talking about this parcel here, which was formerly subdivided from a larger site. The property wasn't

Similar wording

always a standalone site. It was created through this lot line adjustment that was reviewed from

Similar wording

the city, which resulted in two different parcels. And just now this smaller piece is the only one

Similar wording

that remains undeveloped all these other projects and I'll show you the larger survey have been

Similar wording

adoptively reused to multi-family and I think there's one that is a vacant shelter at this

Similar wording

point looking to either have someone else in there or probably will have the same residential

Similar wording

character and we're just dealing with this 4585 square feet vacant parcel on the end

Similar wording

As you can see from the zoning mats, this entire property on the block is zoned RCA5.

Similar wording

There's a park across the street and a massive cemetery to the rear.

Similar wording

Just a little bit more site context, it's sort of like this island here.

Similar wording

These are all former rectories, beautiful churches that have been adaptively reused.

Similar wording

There's a massive parking lot to the rear of these sites, and then this small square

Similar wording

or parcel is all that remains undeveloped on this site. A little bit closer up.

Similar wording

Same thing. Just some of the street views of the property. It sits a little bit lower on grade than

Similar wording

the remaining properties. So the height variance that we're requesting actually just makes it so

Similar wording

it meets the directly adjacent structure. Some of the additional height is, again, just the grade

Similar wording

change it also the grade trains directly adjacent and to the rear of the property as well it also

Similar wording

directly abuts that rear parking lot so some of the design that we put forward takes into

Similar wording

consideration that there is the rest of this site is completely developed in addition to the surface

Similar wording

parking lot just a view this way it's obviously this corner lot here this is a view of the vacant

Similar wording

lot and the church as mentioned these parcels have been adaptably reused to multi-family so

Similar wording

what we're providing is in character which with what is already on this block as one single family

Similar wording

home or multiple single family homes don't really make sense for this direct block given the

Similar wording

adjacency to the park, the parking lot, and these adaptively reused multifamily buildings.

Similar wording

A little bit further away, just so you can see the site context.

Similar wording

And this is all the same owner.

Similar wording

Again, further down, another church.

Similar wording

This is all the way down at the other end.

Similar wording

this is all the way down at the other end

Similar wording

Just so you can kind of see, again, the cemetery to the rear, so there's really no

Similar wording

directly affected near neighbors on at least this block.

Similar wording

And of course, across the street is the Claire Muhammad Square as well.

Similar wording

As you can see, this is sort of the only properties on this block.

Similar wording

as mentioned this is just the site context and the survey just showing um the unit counts in

Similar wording

the adjacent buildings um 15 units 34 units think it's a total of about 80 units um spread out

Similar wording

through these some have been uh redeveloped some have permits that are going to be redeveloped

Similar wording

somewhere in the middle of construction but multi-family buildings uh directly adjacent

Similar wording

These are just the zoning posters on the property scene, sort of, the site.

Similar wording

And just to touch on the refusals a little bit,

Similar wording

first, a use refusal is being asked for given that we're asking for multifamily 15 dwelling units.

Similar wording

It's prohibited because the site is on RSA 5.

Similar wording

Second, a dimensional variance for height.

Similar wording

The maximum allowed is 38 feet in RSA 5, where the revised building proposed 51 feet,

Similar wording

four inches to the main parapet, with the stair and elevator towers reaching 58 and

Similar wording

64 feet, respectively.

Similar wording

A dimensional variance for occupied area is a corner lot.

Similar wording

The property is permitted 80%.

Similar wording

We're asking for just an additional 16.3%.

Similar wording

There's really no need to provide a nine-foot rear yard for a multifamily building, especially

Similar wording

that backs up to a parking lot and then for the dimensional variance again for rear yard which

Similar wording

requires a nine foot rear yard again we're not providing a single family home on the almost

Similar wording

five thousand square foot lot and so those were the dimensional variances again just as you can

Similar wording

see from the site contacts the property is quite unique it is the corner property and it is the

Similar wording

small leftover remainder of a much larger institutional campus so some of this is just

Similar wording

to align with what's already there. And the site as a whole is a little over 92,000 square feet,

Similar wording

so pretty massive in scale. We met with the directly adjacent near neighbors two times

Similar wording

through the RCO meeting and provided notice and had a letter of support from the Mill Creek

Similar wording

Advisory Council. We met with them twice. Originally, we had proposed commercial spaces

Similar wording

on the ground floor given it was a corner and proposed a lot more height which we have reduced

Similar wording

take an entire floor off and removed a unit and through those revisions and some aesthetic

Similar wording

conversations with the rco we have you know their support for this project

Similar wording

if i could bring on robert uh wong to just go through the plans um i'd be happy to answer any

Similar wording

Robert. Robert has been promoted to speak. Thank you.

Similar wording

okay uh thank you this is uh this is robert wong pcs architects robert could you please spell your

Similar wording

name for the stenographer yes uh r-o-b-e-r-t w-o-n-g you swear or affirm to tell the truth

Similar wording

the whole truth nothing but the truth yes sir counsel uh robert could you just go through

Similar wording

the plans on my screen and uh revisions yes as rachel had mentioned uh the proposed building

Similar wording

is essentially taking up uh i think it's like um 96 uh percent of the of the total lot um it is about

Similar wording

uh 43 point uh 43 feet six inches wide and approximately 100 feet long um so in response

Similar wording

In response to concerns by the neighborhood, the building was the building height was reduced by taking one of the floors off, as well as the initial design concept had two commercial spaces.

Similar wording

off as well as the initial design concept had two commercial spaces on the first floor

Similar wording

which based off of the community's response those that element was removed so it's no longer a

Similar wording

mixed-use building it is now 100 residential so we were able to put residential units down on the

Similar wording

first floor um the upper floors contain on floors two three and floor have uh four apartments each

Similar wording

three apartments on the first floor coming to a total of 15 apartments um the existing four

Similar wording

story stone building that is uh page right um of the of the building uh indicates that it is

Similar wording

approximately um 64 feet tall um so the grade going from the street line to the to the face

Similar wording

of that existing building uh raises considerably somewhere between seven to eight feet um and then

Similar wording

the rear wall that rachel was referring to that abuts against the parking lot is probably close

Similar wording

to eight to ten feet in vertical height change from the adjacent grade so once the main building

Similar wording

height was reduced to approximately 51 feet the building is now essentially at the same height

Similar wording

as the adjacent four story and the rest of the campus buildings we are slightly taller than the

Similar wording

the existing buildings that are on the page left, and those are multi-story, three, I believe three-story existing buildings that are about 36 to 38 feet in height.

Similar wording

There's one that's 24 feet in height, and we are so we are requesting the the dimensional changes, as Rachel had mentioned, we are occupying more than 80% of the corner lot.

Similar wording

um and we are over the uh the variance request for the height which is 51 feet to the main

Similar wording

building parapet line the other items that go up to respectively 64 feet is the top of

Similar wording

the elevator override and then 58 feet to the top of the egress stair towers that are required

Similar wording

just the renderings yes so the the design intent is to um stay in line with some of the existing

Similar wording

materials there's obviously a lot of stone as rachel had shown in the existing photography

Similar wording

of the of the main building so we'd like to make a play off of that uh the rest of the neighborhood

Similar wording

is also has obviously a lot of row homes and quite a bit of masonry so you know there will be

Similar wording

quite a bit of either stone or masonry on the main facades of the building we're going to try

Similar wording

to open up the windows into the spaces as much as possible but yeah essentially the the main

Similar wording

entry sequence will be off of the corner as as shown here um and uh this exhibit which was shown

Similar wording

during the rco meeting we wanted uh to show the community that even though the building even

Similar wording

though we were requesting a height variance um that we believed they would be minimal impact

Similar wording

throughout the course of the day so starting at lower right hand corner 1a and going up to 4b

Similar wording

views 1a and 1b show the shadow profile of the of the project at i believe eight o'clock in the

Similar wording

morning so you can see that it's really we're just putting shadow on the owner's existing

Similar wording

uh parking lot um and then and then uh 2a and 2b um are later in the day um and the shadow is cast

Similar wording

page right onto their own property um 3a and 3b i believe are at four o'clock in the afternoon and

Similar wording

the shadow is being cast onto the open park um and then it's really only as the as the sun transitions

Similar wording

from 4 p.m until the evening to like essentially 7 p.m that the the project would cast any sort of

Similar wording

shadow onto the onto one of the uh to caddy corner of the adjacent properties

Similar wording

thank you

Similar wording

council uh nothing further on our end um are you going to bring one to your oh yes my apologies

Similar wording

yeah um itai argman um should be in the audience representing the owner

Similar wording

mr ita is allowed

Similar wording

Mr. Ita is allowed to speak.

Similar wording

Thank you.

Similar wording

Rachel, before the architect goes, do we ever talk about the units themselves, what

Similar wording

they look like?

Similar wording

It's a good point, Chairman.

Similar wording

Do you have the floor plan, Robert?

Similar wording

i do not but in response to that they are one bedroom one bath apartments i believe

Similar wording

in the neighborhood of 600 plus square feet per apartment separate living room

Similar wording

so with a with a full kitchen in each space

Similar wording

all right bring bring on the owner please sure

Similar wording

yes can you hear me yes could you please state your name and spell it for the stenographer

Similar wording

yes my name is etai e-t-a-i and my last name is argument a-r-g-a-m-a-n

Similar wording

you swear or affirm to tell the truth the whole truth and nothing but the truth

Similar wording

Council can you turn your camera on sorry to figure that out

Similar wording

try to figure this out okay council have you heard my testimony today do you believe it to

Similar wording

be true and accurate and do you adopt it as your own yes thank you all right questions from the

Similar wording

board yeah i've got a couple uh well the first comment that i have is i don't see this as really

Similar wording

fitting in character with the rest of the campus. Those are very unique Wissahick and Schist,

Similar wording

essentially historic buildings with mansard roofs. Even the building across the street that's a

Similar wording

three-story has a mansard roof. You've sort of created a big box on the corner with a solid,

Similar wording

But most of the frontage that fronts the park is a stone wall with no windows.

Similar wording

It's offensive in respect to the, it doesn't respect the rest of the campus, in my opinion.

Similar wording

We don't have plans of the floor plans, so we don't kind of see how they kind of work out with the exterior.

Similar wording

I'm concerned that there's no real setback from the 48th Street.

Similar wording

The building goes from property line to property line, even though there's a breezeway, I guess, between the or is that a breezeway or is that a property line between that building and the the old schoolhouse?

Similar wording

Are you are directly on the property line where the steps go up?

Similar wording

It's it's directly on the property line. So those are that's an existing series of steps and walkway.

Similar wording

OK, so we've got so there are no windows along that along along that facade.

Similar wording

Since it's a zero lot line condition, there would be no windows there.

Similar wording

So since we're building on directly against two lot lines at the project rear and on the project right-hand side, there are no windows along those two facades because of fire rating issues and concerns.

Similar wording

so we've created a condition where a project that could be very nice and have light around

Similar wording

all natural light around the entire building you created a condition where there's no light

Similar wording

on two sides and a blank wall that's on the main on one of the main facades i think it

Similar wording

disrespects the architecture of the uh the existing campus so there's correct me if i'm

Similar wording

wrong robert there's windows on the front edge and the side correct there there are windows on the

Similar wording

on the on the street facades and um you know with a tight site like this at least one portion

Similar wording

of a building would need to have uh you know a connecting corridor to for circulation so

Similar wording

you know that it made a lot of sense to be able to put the circulation side on the portion of the

Similar wording

property where we had a zero lot line condition and would be prohibitively expensive for for the

Similar wording

project to install glazing into into a fire rated wall similarly towards the rear backing off the

Similar wording

um backing off of the property line would uh would make the layouts of the apartments uh somewhat

Similar wording

backing off of the property line would

Similar wording

difficult and you know at the end of the day we you know as rachel was saying like the the nine foot

Similar wording

uh setback um then creates actually would create almost like a an alley between the rear of the

Similar wording

building and the raised um portion of the existing retaining wall back there so in some ways i would

Similar wording

think that doing that would create um a condition that becomes unsafe for both the tenants of the

Similar wording

building and the um the uh the neighborhood in general so we thought this was you know a

Similar wording

uh a a way to um build a multi-family building and uh effectively glaze the facades that we did

Similar wording

have available um and you know the the designs are continuing to evolve so we understand your

Similar wording

concern about the front facade yeah i was going to mention i do appreciate the comment around the

Similar wording

aesthetic although it's sort of out of place for zoning but we've done in other projects where the

Similar wording

board has mentioned um you know wanting to have the aesthetic and design match the existing

Similar wording

character a little better we've gone back and made some revisions so that the board can see that i

Similar wording

think especially in consideration that we don't have floor plans i also understand that concern so

Similar wording

um i don't know if the board would uh want to uh hold this so that we can provide an update

Similar wording

so so why don't we do this why don't we go through see if there's anything else okay that

Similar wording

board members may have and then we'll get together and we'll have a plan where we're going to go

Similar wording

yeah i just don't want to disrespect the questions from the board yeah with a reduction in the

Similar wording

building height how high are the roof deck access structures from the ground level

Similar wording

from the ground level the top of the elevator tower is at 64 feet the top of the stair towers

Similar wording

are at 58 feet and the main parapet is 51 feet 4 inches from grade okay and the intent is still

Similar wording

to have this be occupiable roof for all tenants I believe so at this moment in time we're

Similar wording

preserving the option to be able to occupy the roof yes okay and then with the reduction of the

Similar wording

of the height and the removal of the commercial spaces what's happening at the ground floor of

Similar wording