building because the windows looked like they were other residential units yes the the design intent

Similar wording

is for there to be three apartments down at grade we would you know we would continue to work with

Similar wording

the owner in in terms of the the glazing that would be appropriate for at grade apartments

Similar wording

and there is one controlled uh there would be one controlled lobby um off of the off of the main

Similar wording

street frontage there for the entire for the entire building and for the main street are

Similar wording

you referring referencing 48th street are you referencing why losing yes no i'm sorry the along

Similar wording

48th street where so the rest the the main building entrance would be oriented the same way as being

Similar wording

shown in the stoning street view where the where the main facade is off of facing the park

Similar wording

okay in the image that has no not the rendering we're not basing this

Similar wording

you you reference the street view not the rendering

Similar wording

oh i'm sorry i was i was looking at the uh the current view that was uh up so it would be the

Similar wording

the east facade okay and are there any other amenity spaces on the first floor for the tenant

Similar wording

Yes.

Similar wording

Yes.

Similar wording

Okay.

Similar wording

Thank you.

Similar wording

This is what I was looking for.

Similar wording

Any other questions?

Similar wording

Yeah.

Similar wording

Oh, I see you, Trey.

Similar wording

So I do have another comment.

Similar wording

If this is the front, is that 48th Street where the double doors are?

Similar wording

Yes.

Similar wording

Is that?

Similar wording

So at 48th Street, a main entrance, you created a stairway, a blank wall, and a track.

Similar wording

I mean, just conceptually, that's not good, right?

Similar wording

And in terms of scale, massing, and context, it just does not work.

Similar wording

It just doesn't.

Similar wording

It needs to be rethought.

Similar wording

Okay, any other questions?

Similar wording

What's happening in the basement?

Similar wording

That is utility space.

Similar wording

And only the management company is going to have access to the basement?

Similar wording

um at the moment i think the program is a little bit unclear because we have the requirement i

Similar wording

think for bike storage so there's the potential for the public requiring access down to the

Similar wording

requiring access down to the basement for that additional storage so the elevator and one of the stair towers would go down we would we would closely analyze the building code about the maximum occupancy that occupant load that would be allowed down there but we were confident that we can restrict it in such a way that we would

Similar wording

basement for that additional storage how are they going to

Similar wording

not require both stair towers to go down to that level okay okay any other points so Hillary what

Similar wording

I'm going to think about doing with this is give it a result of hearing date I don't think we're

Similar wording

going to take it to planning right now because things may change the same thing with there

Similar wording

right so that's fine we can hold planning and public testimony for the resumption so council

Similar wording

will make a result of hearing great and you know you go back to the team and figure out where you

Similar wording

want to be with this the resumptive hearing will be on 10 6 26 at 9 30 a.m thank you

Similar wording

okay and please stand by here and i have another case thank you by the way

Similar wording

all right so number five mi 2025 006 975 2015 frankfurt avenue uh rachel please just state

Similar wording

your name for the record sure rachel pritzker right um see here uh could you identify that

Similar wording

your client a relationship to the property yeah so my client is uh xl2 llc yuri tomoschak

Similar wording

uh who is the owner of the property okay um

Similar wording

our vice chair has a few questions for you good afternoon have you submitted your documents and

Similar wording

exhibits five days in advance of this hearing yes and there's lots of refuses on this one as well

Similar wording

do you weigh the reading of the refusals and stipulate to their accuracy?

Similar wording

Yes. Similar to the prior project, we did make significant revisions to this project and did

Similar wording

provide a proviso plan form and updated plans. Okay. Thank you. You can share your screen and

Similar wording

proceed with your case. And chairman and board members, no thank you, Anita. When you make good

Similar wording

points, we have to take them. So I appreciate that feedback. I'm just going to share my screen.

Similar wording

okay this is a little bit of a complicated one so just bear with me

Similar wording

this is the original refusal for this project I do also want to note before I go through the

Similar wording

details that we have a letter of non-opposition from Councilman Squill's office and a letter of

Similar wording

support from fishtown neighbors association um the property consists of seven existing lots

Similar wording

uh 2015 2017 2019 and 2021 frankfurt avenue uh zone cmx2 um and 2016 2018 and 2022 set by the

Similar wording

uh uh i'm sorry to interrupt i just i do want to um acknowledge we have another attorney here i

Similar wording

believe for a protestant um if you want to state your name and be sworn in and indicate who your

Similar wording

client is my name is jordan rand my client is protestant dorothy correll resident next door

Similar wording

at 2022 set by the street could you do me a favor could you please spell your name

Similar wording

j-o-r-d-a-n last name r-a-n-d you swear or affirm to tell the truth the whole truth nothing but the

Similar wording

truth i do please continue rachel yeah i just want to make note for the record that we have not

Similar wording

received any information documents exhibits from mr ran or his attorney so procedurally we've had

Similar wording

no ability to defend any opposition to this matter i don't have any exhibits

Similar wording

okay okay um so once again um this property consists of seven existing lots um zone cmx2 and

Similar wording

RSA 5. On the Subviva side, the parcels range from 792 square feet up to 2160 on the Frankfurt

Similar wording

Avenue side. We propose a relocation of lot lines to create two parcels, parcel H and parcel I,

Similar wording

both fronting on Frankfurt Avenue, consistent with the City of Philadelphia Planning Commission's

Similar wording

determination of September 18, 2025. As reconfigured, both new parcels remain split between

Similar wording

CMX2 and RSA5 districts. Parcel H holds 4,320.2 square feet, consisting of 3,520.1 square feet

Similar wording

of CMX2 and 792.1 square feet of RSA5. Parcel I totals 4,080.2 square feet, consisting of

Similar wording

Parcel I totals 4,080.2 square feet consisting of 2,070 square feet in CMX2 and 2,010 square feet

Similar wording

2000

Similar wording

of RSA5. Each parcel will contain a new four-story mixed-use building on the Frankfurt Avenue side

Similar wording

with a two-story reduced condition on the SEPVIVA side with various setbacks among SEPVIVA,

Similar wording

ground floor on Frankfurt Avenue of office medical dental health practitioner use in one

Similar wording

the ground floor spaces and multi-family residential units above along with roof decks

Similar wording

the application as originally filed is different than what we're proposing today in direct response

Similar wording

to feedback from the community and the rco and i'll go through those revisions but and

Similar wording

we've eliminated a number of refusals as a result specifically some of the occupied

Similar wording

some of the building height and some of the use in addition to the,

Similar wording

we reduced it from nine units on each parcel as opposed to 10 units on each parcel.

Similar wording

So reducing the proposed figure here on table 166022 and 4A12.

Similar wording

The D for the property.

Similar wording

Here is the zoning map for the property, Frankfort Avenue and Sebaiva in the rear, and as you

Similar wording

can see, the majority of the parcel on the Frankfort Avenue and some of the Sebaiva is

Similar wording

the CMX2 condition.

Similar wording

Again, Frankfort Avenue is a major commercial corridor in Fishtown with three segments of the split zoning that are RSA-5 on the Sub-Viva side of the street.

Similar wording

It's worth noting in this second zoning map that the conditions are not exclusive to RSA-5 on this side of Sub-Viva. You have a mix of CMX-2, RM-1, and portions of RSA-5.

Similar wording

this is an aerial of these properties

Similar wording

and the street view the block is a mix of commercial mixed use on the

Similar wording

frankfurt avenue side with some existing warehouses and garages

Similar wording

as you can see from the front view

Similar wording

again on the front this is a new construction that was approved by this board similar split

Similar wording

zoning it's a bit taller in height but similar idea with the commercial mix use so there are

Similar wording

conditions on this block on especially in the frankfurt avenue side being a commercial quarter

Similar wording

which this project was similarly modeled off of

Similar wording

this is the rear side there's a mix of three stories properties towards the left side and

Similar wording

then there's a mix of single family homes and warehouse conditions on the survivor street

Similar wording

there's no like continuity on the block it's not all two-story row homes it's a mix of

Similar wording

one-story warehouses two-story row homes and again three-story structures as well

Similar wording

is the other side of sub viva towards the left of the property

Similar wording

these are just the zoning posters

Similar wording

So the different portions in the code, again, some have been revised from what we originally proposed.

Similar wording

So as mentioned, some of these don't apply anymore to the project.

Similar wording

We'll go through the plans and identify that.

Similar wording

We did significant community outreach for this project.

Similar wording

We met with FNA at a preliminary meeting in December.

Similar wording

We then had the full zoning committee meeting, the community meeting in January with notice and proof of mailing.

Similar wording

We also, Ms. Dorothy's son is an attorney at Claire Harrison.

Similar wording

He reached out and attended the meeting, and we also separately met with him to see what concerns they specifically had around this project.

Similar wording

and then also we had another community meeting after we made a number of revisions to the project

Similar wording

in which we received a letter of support from FNA. It just included in the packet

Similar wording

Just included in the packet all the outreach that we did. It's still unclear to me from Ms. Dorothy and her attorney what the specific concerns are that are remaining. A significant amount of the project that was revised is the Sepviva side of the project, which you'll see to implement a 30-foot setback, a two-story condition on the front, and the aesthetic to look similar to single-family homes in consideration that that sort of snapshot of the middle of the block does have a

Similar wording

all the outreach that we did. It's still unclear to me.

Similar wording

lot of those two-story conditions we'd still be willing to work with miss dorothy and and

Similar wording

especially if there are any construction concerns for this project which we can understand this is

Similar wording

just the posting the mailing and again a lot of outreach most of the response from the other

Similar wording

attorneys was just we'll discuss it at at that meeting and then follow up from that meeting if

Similar wording

was any other concerns um that we could address just showing our willingness to you know collaborate

Similar wording

on this project

Similar wording

asking if there's a list of concerns or anything else that's missing

Similar wording

this is from the other second rco meeting that we had the proof of mailing

Similar wording

and my outreach to mr rand asking what concerns they're still up to i think a few days ago

Similar wording

this is a letter from fishtown neighbors basically requested continuance which we

Similar wording

did to allow for more time and then a follow-up letter from the second meeting with support for

Similar wording

the project and Councilman Squilla's letter of non-opposition as well there also are some letters

Similar wording

of support from the surrounding area there were others that were included but I only put ones that

Similar wording

were directly relevant just bring up the plans I just want to kind of go through the legal argument

Similar wording

a little bit. As mentioned, we substantially revised the project. The unit count on each

Similar wording

parcel was reduced from 10 to 9 dwelling units and the previously proposed off-street parking.

Similar wording

We originally provided off-street parking at the rear. There's existing curb cuts in garages, but

Similar wording

in order to have more parking on the street or not keep that condition, we removed the parking

Similar wording

as a whole, which would have been accessed from Zepiva, which was eliminated entirely along with

Similar wording

with the associated curb cuts.

Similar wording

We also removed portions of the proposed balconies

Similar wording

and substantially revised the building design

Similar wording

along with on Sep Viva to reduce the height

Similar wording

and massing perceived from that block.

Similar wording

Significant portions of the upper floors

Similar wording

are pulled back approximately 30 feet

Similar wording

from the Sep Viva frontage resulting

Similar wording

in only a two-story wall condition,

Similar wording

which our architect will describe in more detail.

Similar wording

And again, this resulted in support.

Similar wording

The majority of this project refusals result

Similar wording

from this mixed zoning condition. And also the special exception for the use or the variance for

Similar wording

the medical dental is due to overlay in CMX2, which doesn't allow for that. Although uses such

Similar wording

as childcare center, educational facilities, fraternal organizations, or hospitals would

Similar wording

generate a greater intensity of activity than a medical dental facility. So keeping that in mind,

Similar wording

And the 100 percent lot coverage is a condition found directly adjacent to this and given

Similar wording

the split zoning would on some of these lots result in random gaps of nine feet between

Similar wording

a commercial corridor and commercial properties and a single family home, which is not an

Similar wording

ideal condition directly adjacent to a commercial corridor.

Similar wording

And again, we also will change the project to include internalized trash separating out

Similar wording

residential and commercial which was across bicycle parking and wide and pedestrian areas

Similar wording

and street tree improvements on the frankfurt avenue side the comment on height just before

Similar wording

i know i'm taking a little bit longer but want to make sure i lay this out

Similar wording

there are adjacent structures specifically at 2023 and across the street that are 45 and 46 feet in

Similar wording

height we're proposing 44 feet in height it's a little bit of a slope and grade change as you

Similar wording

see on the frankfurt avenue side and then a reduction to two-story conditions on set by but

Similar wording

with that 30-foot setback this is also supported by the city's own adaptive plan for the area

Similar wording

specifically mentioning rezoning frankfurt avenue to encourage mixed-use development and again is

Similar wording

more in line with the commercial corridor conditions and the mixed characterizations on this

Similar wording

existing block um if we can bring on kevin o'neill um to go through the revival

Similar wording

If we can bring on Kevin O'Neill to go through their revised plans, I'd appreciate that.

Similar wording

Kevin?

Similar wording

Kevin O'Neill has been allowed to talk.

Similar wording

Thank you.

Similar wording

Good afternoon. I'm here.

Similar wording

i could you please state your name and spell for the stenographer kevin j o'neill apostrophe n e i

Similar wording

l l do you swear or affirm to tell the truth the whole truth nothing but the truth yes counsel uh

Similar wording

kevin can you go through the plans on my screen and uh specifically the some of the revisions

Similar wording

and site conditions as well. Sure.

Similar wording

Tell me when to stop. Okay, so we've got a couple of site photos just to give you an overview. The

Similar wording

top picture is Frankfurt Avenue. The black dash lines indicate the four properties along

Similar wording

frankfurt avenue the lower picture is the survivor street frontage uh again the black line the black

Similar wording

dashed lines indicate the uh the four properties where uh that make up our parcel on uh sup by the

Similar wording

street am i am i saying black dots on i don't i don't i don't see what you're saying maybe i'm

Similar wording

wrong that's the black dash lines okay all right all right all right coming down straight all right

Similar wording

okay yeah these are all part of our parcel all right yep

Similar wording

Zoning map on the upper left hand of the page, as Rachel already described, to the right is our zoning site plan.

Similar wording

And as you can see, what we're proposing here is a lot consolidation and subdivision of these parcels into two new parcels.

Similar wording

so currently there are multiple addresses and what we're proposing to do here is combine all

Similar wording

of this into two new parcels so parts of parcel h and parcel i uh parcel h

Similar wording

i've been to a lot of art

Similar wording

Parcel H is to the left, which makes up 2015 and 2017 Frankfurt Avenue and extends all the way

Similar wording

through to Sep Viva. 2019 and 2021 make up Parcel I and extend all the way through to Sep Viva

Similar wording

Street as well. Of note on this plan at the lower right-hand side, on the bottom of the page is

Similar wording

where we've made most of the revisions to this project from the April zoning meeting that was

Similar wording

held up to the, I'm sorry, the January meeting that was held up to the more recent May meeting

Similar wording

that was held. And we'll get to that in a second when we get to those slides. So I have floor plans

Similar wording

for all levels of the building. I'll briefly walk through those. Basement level, the orange hatched

Similar wording

area indicates the basement portion of the commercial spaces.

Similar wording

So we have two large commercial spaces facing Frankfurt Avenue,

Similar wording

and those are essentially bi-level.

Similar wording